| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.5 CrAccepted-AOC | ₹61.5 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹62.0 Cr+₹48.1 L (0.78%)Rejected-Finance 545 G T ROAD HOWRAH WEST BENGAL 711101 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | ₹62.0 Cr+₹48.1 L (0.78%) | L2 | Rejected-Finance Other than L1 Bidder |
| 3 | L3₹65.8 Cr+₹4.3 Cr (6.92%)Rejected-Finance | ₹65.8 Cr+₹4.3 Cr (6.92%) | L3 | Rejected-Finance Other than L1 Bidder |
| 4 | L4₹68.0 Cr+₹6.4 Cr (10.5%)Rejected-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹68.0 Cr+₹6.4 Cr (10.5%) | L4 | Rejected-Finance Other than L1 Bidder |
| 5 | L5₹69.8 Cr+₹8.3 Cr (13.5%)Rejected-Finance BANSAL BHAWAN STATION CHARALI AT ROAD SIVASAGAR ASSAM 785640 | SIVASAGAR | SIVASAGAR | ASSAM | 785640 | ₹69.8 Cr+₹8.3 Cr (13.5%) | L5 | Rejected-Finance Other than L1 Bidder |
| Sl No | Description | Qty | Unit | M M SHAWL Engineers and contractors pvt ltd L4 | M/s Singh enterprises L7 | NSC Projects Pvt. Ltd. L6 | Brahmaputra Commerce and Trade L5 | PANCHDEEP CONSTRUCTIONS LIMITED L2 | M/S C.B ENTERPRISE L1 | SRC COMPANY INFRA PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | ||||||||||
| 1.00SCHEDULE 'A' PART I (A) DESIGN & BUILD STRUCTURE | ||||||||||
| 1.10 | Design, supply and errect/construction pre-engineered building RCC/steel structures for Maint Flight Hangar with Annexes Buildings along both sides of Hangar, Double Storey, size as shown on drawing No. CESZ/DIN/2024/AR-549 Sheet No. 1/6 to 6/6 including Hangar Door(electricaly operated), Bird/Monkey Proofing Net, anchor bolts, base plates and all structural steel items, flooring of annexe building, roofing, walling, RCC rain water eaves gutters, turbo air ventilators & all necessary civil works as required with all fittings, fixtures and built in furniture items etc. including Bracket, Gantry Girder (for LT Travel), etc. for provision of EOT Crane complete all as specified and shown on drawings.
Note :-
(i) The vetting of design and drawings of all structures shall be got done only from any one of the IITs and the quoted rate shall deemed to be included the cost of the same.
(ii) The extent of provision of EOT crane mentioned under BOQ Sl Item No. 22.118 of Schedule 'A' Part-XIX is not included in above quoted rate and will be measured & paid separately under BOQ Sl Item No. 22.118 of Schedule 'A' Part-XIX.
(iii) SSI wrt bore hole No. 50, 54, 55, 56 & 57 (Group C) shall be considered (attached at Appendix 'H').
(iv) Flooring of hanger shall be designed by contractor & get approved from the department. Item of flooring shall be measured & paid under respective Schedule Items.
(v) Foundation, Flooring(Hangar only), Internal electrification & Internal water supply shall be measured & paid under respective schedules.
(vi) The quoted rate shall deemed to be included the cost of flooring under Annexe building.
(vii) For complete details refer respective Schedule 'A' notes & Particular specification clause No. 11 and its sub paras.
(viii) EPU flooring should be provided in Hangar and cost of same is included in this quoted rate and shall be provided over the designed floor. | 1 | Lump-sum | 13,00,00,000 ₹13,00,00,000 | 17,88,00,000 ₹17,88,00,000 | 12,81,16,666.95 ₹12,81,16,666.95 | 12,50,00,000 ₹12,50,00,000 | 11,34,00,000 ₹11,34,00,000 Lowest | 13,29,68,000 ₹13,29,68,000 | 16,75,00,000 ₹16,75,00,000 |
| 1.20 | Design & Construction of a RCC Over Head Tank 100000 Litre Capacity in 20 m height staging complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group A shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | 58,20,000 ₹58,20,000 | 9,50,000 ₹9,50,000 Lowest | 95,00,000 ₹95,00,000 | 75,00,000 ₹75,00,000 | 58,80,000 ₹58,80,000 | 54,09,600 ₹54,09,600 | 55,00,000 ₹55,00,000 |
| 1.30 | Design & Construction of a RCC Static water tank 125KL complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group C shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | 18,00,000 ₹18,00,000 | 17,50,000 ₹17,50,000 Lowest | 32,50,000 ₹32,50,000 | 44,00,000 ₹44,00,000 | 19,32,000 ₹19,32,000 | 17,77,440 ₹17,77,440 | 25,00,000 ₹25,00,000 |
| 1.40 | Design & Construction of a RCC Static water tank 150000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group A shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | 23,00,000 ₹23,00,000 | 21,00,000 ₹21,00,000 Lowest | 37,50,000 ₹37,50,000 | 52,00,000 ₹52,00,000 | 25,20,000 ₹25,20,000 | 23,18,400 ₹23,18,400 | 27,00,000 ₹27,00,000 |
| 1.50 | Design & Construction of a RCC Static water tank 50000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group A shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | 15,90,800 ₹15,90,800 | 9,50,000 ₹9,50,000 Lowest | 12,50,000 ₹12,50,000 | 22,50,000 ₹22,50,000 | 17,64,000 ₹17,64,000 | 16,22,880 ₹16,22,880 | 12,00,000 ₹12,00,000 |
| 1.60 | Design & Construction of a RCC Static water tank 50000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrtGroup B shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | 15,90,800 ₹15,90,800 | 9,00,000 ₹9,00,000 Lowest | 12,50,000 ₹12,50,000 | 22,50,000 ₹22,50,000 | 17,64,000 ₹17,64,000 | 16,22,880 ₹16,22,880 | 12,00,000 ₹12,00,000 |
| 1.70 | Design & Construction of a RCC Under Ground Sump 30000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group C shall be considered (attached at Appendix 'H').
Note For serial item No 1.2 to 1.7 :- the Lumpsum quoted amount for these items are inclusive of cost of structure and Earth work. | 1 | Lump-sum | 10,18,500 ₹10,18,500 | 6,50,000 ₹6,50,000 Lowest | 12,50,000 ₹12,50,000 | 15,00,000 ₹15,00,000 | 9,24,000 ₹9,24,000 | 8,50,080 ₹8,50,080 | 10,00,000 ₹10,00,000 |
| 2.00 | Lumpsum price workedout by the tenderer for BUILDING & STRUCTURE WORK as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 26,00,00,000 ₹26,00,00,000 | 27,91,36,541 ₹27,91,36,541 | 26,81,87,630.43 ₹26,81,87,630.43 | 26,00,00,000 ₹26,00,00,000 | 23,09,00,000 ₹23,09,00,000 | 22,18,40,000 ₹22,18,40,000 Lowest | 24,50,00,000 ₹24,50,00,000 |
Tender Value
₹74.9 Cr
EMD Value
₹15 L
Closing Date
26 Aug 2025, 6:00 pmClosed
CE SHILLONG ZONE
CE SHILLONG ZONE, SPREAD EAGLE FALLS, SHILLONG MEGHALAYA
PROVISION OF OTM AND TECH ACCN AT DINJAN UNDER GE DINJAN No.2
2025_MES_698313_2
89768/DIN/E8
Open Tender
Civil Works
Lump-sum
1100 days
DINJAN
As per tender document and NIT
2 documents required · 2 mandatory
₹3,000
GE DINJAN NO. 2
₹15 L
Yes
24 Sept 2025
29 Jul 2025
28 Aug 2025
29 Jul 2025
26 Aug 2025
19 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE 'A' PART I (A) DESIGN & BUILD STRUCTURE | |||||
| 1.1 | Design, supply and errect/construction pre-engineered building RCC/steel structures for Maint Flight Hangar with Annexes Buildings along both sides of Hangar, Double Storey, size as shown on drawing No. CESZ/DIN/2024/AR-549 Sheet No. 1/6 to 6/6 including Hangar Door(electricaly operated), Bird/Monkey Proofing Net, anchor bolts, base plates and all structural steel items, flooring of annexe building, roofing, walling, RCC rain water eaves gutters, turbo air ventilators & all necessary civil works as required with all fittings, fixtures and built in furniture items etc. including Bracket, Gantry Girder (for LT Travel), etc. for provision of EOT Crane complete all as specified and shown on drawings.
Note :-
(i) The vetting of design and drawings of all structures shall be got done only from any one of the IITs and the quoted rate shall deemed to be included the cost of the same.
(ii) The extent of provision of EOT crane mentioned under BOQ Sl Item No. 22.118 of Schedule 'A' Part-XIX is not included in above quoted rate and will be measured & paid separately under BOQ Sl Item No. 22.118 of Schedule 'A' Part-XIX.
(iii) SSI wrt bore hole No. 50, 54, 55, 56 & 57 (Group C) shall be considered (attached at Appendix 'H').
(iv) Flooring of hanger shall be designed by contractor & get approved from the department. Item of flooring shall be measured & paid under respective Schedule Items.
(v) Foundation, Flooring(Hangar only), Internal electrification & Internal water supply shall be measured & paid under respective schedules.
(vi) The quoted rate shall deemed to be included the cost of flooring under Annexe building.
(vii) For complete details refer respective Schedule 'A' notes & Particular specification clause No. 11 and its sub paras.
(viii) EPU flooring should be provided in Hangar and cost of same is included in this quoted rate and shall be provided over the designed floor. | 1 | Lump-sum | - | - |
| 1.2 | Design & Construction of a RCC Over Head Tank 100000 Litre Capacity in 20 m height staging complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group A shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | - | - |
| 1.3 | Design & Construction of a RCC Static water tank 125KL complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group C shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | - | - |
| 1.4 | Design & Construction of a RCC Static water tank 150000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group A shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | - | - |
| 1.5 | Design & Construction of a RCC Static water tank 50000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group A shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | - | - |
| 1.6 | Design & Construction of a RCC Static water tank 50000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrtGroup B shall be considered (attached at Appendix 'H'). | 1 | Lump-sum | - | - |
| 1.7 | Design & Construction of a RCC Under Ground Sump 30000 Litre capacity complete all as specified and as shown on drawings.
Note: (i) SSI wrt Group C shall be considered (attached at Appendix 'H').
Note For serial item No 1.2 to 1.7 :- the Lumpsum quoted amount for these items are inclusive of cost of structure and Earth work. | 1 | Lump-sum | - | - |
| 2 | Lumpsum price workedout by the tenderer for BUILDING & STRUCTURE WORK as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 27,91,36,541.96 | ₹27,91,36,541.96 |
| 3 | Lumpsum price workedout by the tenderer for CAST-IN SITU PILE, FOUNDATION OF HANGER as listed in Schedule ‘A’ Part-I(C) | 1 | Lump-sum | 3,81,58,660.65 | ₹3,81,58,660.65 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_809466.xls
BOQ • 0.67 MB
176938467.pdf
Tender Documents • 0.42 MB
176938469.html
Tender Documents • 0.06 MB
177953461.pdf
Tender Documents • 0.19 MB
Arch_Drawing.pdf
Tender Documents • 27.06 MB
Completetenderdocument.pdf
Tender Documents • 5.05 MB
Contentsmerge323486.pdf
Tender Documents • 34.79 MB
RevisedDRG.pdf
Tender Documents • 15.53 MB
StruDrawingI.pdf
Tender Documents • 15.96 MB
StruDrawingII.pdf
Tender Documents • 16.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .