| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance N A | NA | NA | 121004 | -1.21% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹62,898.01 (0.21%)Admitted-Finance | -1.00% | ₹3.0 Cr+₹62,898.01 (0.21%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹2.1 L (0.72%)Admitted-Finance 1ST FLOOR B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | -0.50% | ₹3.0 Cr+₹2.1 L (0.72%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
31 Dec 2025, 12:00 pmClosed
Superintending Engineer
SE Circle office UPJN Rural LKO
Construction of Parking for Two Wheeler and Four Wheeler vehicles at Head Office of UP Jal Nigam Rural, Lucknow
2025_UPJNG_1099590_1
2071/M-7/242 dt. 15.12.2025
Open Tender
Composite Works
Turn-key
240 days
Head Office of UP Jal Nigam Rural
As per Tender Document
2 documents required · 2 mandatory
₹11,800
PM Construction Unit
₹6.0 L
20 Jan 2026
16 Dec 2025
31 Dec 2025
16 Dec 2025
31 Dec 2025
16 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road and median work | |||||
| 1.1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 309.91 | CUM | 134.54 | ₹41,695.29 |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 1,528.97 | CUM | 530.95 | ₹8,11,806.62 |
| 3 | Mechnical transportation of earth including loading, unloading and stacking
Upto 5 km | 1,528.97 | CUM | 247.61 | ₹3,78,588.26 |
| 3.1 | For 6 km to 10 km | 1,528.97 | CUM | 87.78 | ₹1,34,212.99 |
| 3.2 | For 11 km to 15 km | 1,528.97 | CUM | 71.43 | ₹1,09,214.33 |
| 3.3 | For 16 km to 20 km | 1,528.97 | CUM | 71.43 | ₹1,09,214.33 |
| 3.4 | For 21 km to 25 km | 1,528.97 | CUM | 57.49 | ₹87,900.49 |
| 3.5 | For 26 km to 30 km | 1,528.97 | CUM | 57.49 | ₹87,900.49 |
| 3.6 | For 31 km to 35 km | 1,528.97 | CUM | 57.49 | ₹87,900.49 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.87 MB
TenderDoc.pdf
Tender Documents • 4.33 MB
BOQ_2025627.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .