Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance MGR SALAI 2ND CROSS STREET MGR SALAI 5TH CROSS STREET MGR SALAI 33 UNIT 41 ZONE 14 | CHENNAI | TAMIL NADU | 600001 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
13 Mar 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
DEMOLITION AND RE-CONSTRUCTION OF MISSING LINK OF STORM WATER DRAIN OF SIZE 900X900 mm AT VALLALAR STREET PADAMANABA NAGAR (PART) IN DIV-106, UNIT-22,ZONE-8
2026_CoC_674090_1
Z.O.VIII.C.NO.E1/1990/2026
Limited
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,800
4 Jun 2026
12 Mar 2026
13 Mar 2026
12 Mar 2026
13 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking Existing Black Top Surface upto 2 to 5 cm | 56 | SQM | 21.86 | ₹1,224.16 |
| 2 | Earth work excavation for foundation in all kinds ...lling the sides with excavated earth etc. complete | 49 | CUM | 135.59 | ₹6,643.91 |
| 3 | Supplying and erecting centering for sides and sof...m dia spaced at 75cm centre to centreetc. complete | 148 | SQM | 1,040.23 | ₹1,53,954.04 |
| 4 | Supplying, fabricating and placing in position Rib...ngements for the supply of steel and binding wire) | 2,300 | KGS | 94 | ₹2,16,200 |
| 5 | Refilling with excavated earth in regular layers o...dating etc. complete for foundation and basement. | 23 | CUM | 47.14 | ₹1,084.22 |
| 6 | Carting away the surplus earth/debris to a lead of... the Corporation Land as directed during execution | 40 | CUM | 226.56 | ₹9,062.4 |
| 7 | Supplying and Jointing 20mm dia PVC pipe.including... fixing with necessary scaffolding etc. complete.. | 5 | MTR | 184.8 | ₹924 |
| 8 | Towards the hire charges for providing temporary a... cost of materials, welding, painting etc complete | 2 | R/M | 250 | ₹500 |
| 9 | Dismantling of RCC Slab (reinforcement is being co...torm Water Drain - Steel is declared unfit for use | 7 | CUM | 2,220.9 | ₹15,546.3 |
| 10 | Dismantling the existing brick or stone masonry wo...uding carefully clearing the debris etc. complete. | 13 | CUM | 311.45 | ₹4,048.85 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.77 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_810240.xls
BOQ • 0.29 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .