Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 CrAdmitted-Finance AT PO TUKUPANI SIMDEGA JHARKHAND 853223 | SIMDEGA | SIMDEGA | JHARKHAND | 853223 | ₹31.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹35.2 CrAdmitted-Finance RING ROAD KENA BANDH BAURIPARA AMBIKAPUR SURGUJA C G | ₹35.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹35.2 CrAdmitted-Finance | ₹35.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹39.3 CrAdmitted-Finance GURUDWARA ROAD BISHRAMPUR BISHRAMPUR BISHRAMPUR SURGUJA CHHATTISGARH 497001 | SURGUJA | CHHATTISGARH | 497001 | ₹39.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹39.8 CrAdmitted-Finance | ₹39.8 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Superior Construction Pvt. Ltd. L1 | YOGESJAISWAL L2 | SURGUJA BRICKS INDUSTRIES L4 | SRMV CONSTRUCTION PVT LTD L5 | JAI MAA ASHTABHUJI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. and as per direction of E/I By Manual means:- In area of light jungle | 15.59 | Hec | 50,000 ₹7.8 L | 45,000 ₹7.0 L | 85,000 ₹13.3 L | 88,499.5 ₹13.8 L | 20,000 ₹3.1 L |
| 2.00 | Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 46,757.25 | cum | 110 ₹51.4 L | 120 ₹56.1 L | 135 ₹63.1 L | 129.9 ₹60.7 L | 80 ₹37.4 L |
| 3.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(Grading V material). | 161.7 | cum | 1,700 ₹2.7 L | 1,900 ₹3.1 L | 2,200 ₹3.6 L | 2,041.87 ₹3.3 L | 2,000 ₹3.2 L |
| 4.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 847.77 | cum | 1,800 ₹15.3 L | 2,100 ₹17.8 L | 2,300 ₹19.5 L | 2,380.01 ₹20.2 L | 2,500 ₹21.2 L |
| 5.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.90 kg/sqm using mechanical means. | 3,391.08 | Sqm | 35 ₹1.2 L | 85.45 ₹2.9 L | 85.45 ₹2.9 L | 82.45 ₹2.8 L | 60 ₹2.0 L |
| 6.00 | Tack coat on Granular surface treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 3,391.08 | Sqm | 13 ₹44,084.04 | 16.37 ₹55,511.98 | 16.37 ₹55,511.98 | 16.37 ₹55,511.98 | 14 ₹47,475.12 |
| 7.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom and as per direction of E/I. | 6,93,050.39 | Sqm | 10 ₹69.3 L | 13.21 ₹91.6 L | 13.21 ₹91.6 L | 13.21 ₹91.6 L | 11 ₹76.2 L |
| 8.00 | Dense graded Bituminous Macadam Grading-II With VG-30 Bulk Bitumen. Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen. | 17,662.09 | cum | 8,070 ₹14.3 Cr | 9,200 ₹16.2 Cr | 10,200 ₹18.0 Cr | 10,100 ₹17.8 Cr | 9,500 ₹16.8 Cr |
| 9.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 Bulk Bitumen. | 10,503.78 | cum | 9,153.57 ₹9.6 Cr | 9,800 ₹10.3 Cr | 11,000 ₹11.6 Cr | 11,300 ₹11.9 Cr | 10,000 ₹10.5 Cr |
| 10.00 | Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) | 2,428.83 | Sqm | 50 ₹1.2 L | 70 ₹1.7 L | 75 ₹1.8 L | 70.3 ₹1.7 L | 30 ₹72,864.90 |
Tender Value
₹37.8 Cr
EMD Value
₹37.8 L
Closing Date
28 Jul 2025, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Simdega
Executive Engineer, RCD, Road Division, Simdega
Improvement of Riding Quality Programme (IRQP) work for Simdega Sewai Kinkel Kurdeg Kutumakachhar upto Chhatisgarh Border Road (MDR-044) total length 63.20 km
2025_CECOM_103004_1
RCD/SIMDEGA/02/2025-26
Open Tender
Civil Works - Roads
240 days
Kurdeg
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹37.8 L
Yes
Chief Eng. Comm RCD, Ranchi, Jharkhand
20 Mar 2026
17 Jul 2025
30 Jul 2025
17 Jul 2025
28 Jul 2025
17 Jul 2025
21 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid