Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.1 L
EMD Value
₹18,198
Closing Date
29 Feb 2020, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Improvement Restoration of Gurah Mehtian distributary from RD 980 to 1800M
2020_IFC_93347_4
e-NIT No. 07 of 2019-20
Open Tender
Civil Works - Canal
Item Rate
45 days
Hiranagar
Improvement Restoration of Gurah Mehtian distributary from RD 980 to 1800M
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹18,198
Executive Engineer RCC Lower Division Hiranagar
3 Mar 2020
22 Feb 2020
2 Mar 2020
22 Feb 2020
29 Feb 2020
22 Feb 2020
22 Feb 2020 - 27 Feb 2020
27 Feb 2020
Amount
Clearing Jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (a) Dry
Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (b) Wet
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead: 1:3:6 or richer mix
Dismantling concrete grouted stone pitching in aprons, drains etc. including stacking of serviceable material & disposal of unserviceable material, stacking/disposal lead upto 100 metres.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. Including disposal of excavated earth upto 1mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kind of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) : Crushed
Cement Plaster : 12mm Cement plaster of mix: 1:4 (1 Cement : 4 Coarse sand)
Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns etc. for mass concrete.
Centring and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Dry stone pitching (any thickness) excluding cost of stones. a) On Horizontal
Dry stone pitching (any thickness) excluding cost of stones. b) On Slopes
Dumping stone excluding cost of stones.: In Horizontal on level
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal) @ 6.00cum per 100 sq m on horizontal/side slopes: complete including curing. Crushed
Supply of Nallah Stone
Carriage of Materials from Source to site of work Carriage of Stone av. 15 Kms by Mechanical Transport
Carriage of Materials from Source to site of work Carriage of Cement av. 4 Kms by Mechanical Transport
Carriage of Materials from Source to site of work Carriage of sand and stone aggregate for 40mm avg. 10km by Mechanical Transport
BISHVJEET SINGH JAMWAL
yash paul
SUNIL KUMAR
M/S VIJAY KUMAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .