Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC BARTEZPUR KUKURMARA ASSAM 781134 | KUKURMARA | KAMRUP | ASSAM | 781134 | ₹11.5 L | L1 | Accepted-AOC Awarded Contract bidder |
| 2 | L2₹12.0 LRejected-Finance | ₹12.0 L | L2 | Rejected-Finance Rejected as L2 |
| 3 | L3₹12.5 LRejected-Finance ASSAM AS | LAKHIMPUR | ASSAM | 784160 | ₹12.5 L | L3 | Rejected-Finance Rejected as L3 |
| Sl No | Description | Qty | Unit | SRI PRANAB BARMAN L3 | DIGANTA BURAGOHAIN L2 | RUPJYOTI DAS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Applying epoxy motar over leached, honey combed and spalled concrete surface and exposed steel reinfircement complete as per Technical specifications.
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 10 | SqM | 1,600 ₹16,000 | 1,812 ₹18,120 | 1,700 ₹17,000 |
| 2.00 | Greasing of bearing with ULTRATACK AP3 grease including cleaning of bearing with steel brush, removal of dusts and dirt with necessary scaffolding etc. complete as directed by the department.
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 18 | Nos. | 1,500 ₹27,000 | 1,454 ₹26,172 | 1,300 ₹23,400 |
| 3.00 | Replacement of Expansion joints complte as per drawings.
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 30 | Rmt | 5,500 ₹1.6 L | 4,844 ₹1.5 L | 4,650 ₹1.4 L |
| 4.00 | Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawings and approved specification to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturers instructions for installation and as per technical specification clause 1207.2.5
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 30 | Rmt | 29,500 ₹8.8 L | 28,471 ₹8.5 L | 27,300 ₹8.2 L |
| 5.00 | Implementation of Environmental and Social Management Plan:
Ambient Air Monitoring:
At pre-maintenance Stage:
At minimum 2 locations (twice a week) (Once before the beginning of the maintenance work)
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 4 | No. | 10,170 ₹40,680 | 10,577 ₹42,308 | 10,170 ₹40,680 |
| 6.00 | Implementation of Environmental and Social Management Plan:
Ambient Air Monitoring:
After maintenance Stage:
At 2 locations (Two consecutive day) (Twice a week) (Once after the completion of the maintenance work)
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 4 | No | 10,170 ₹40,680 | 10,577 ₹42,308 | 10,170 ₹40,680 |
| 7.00 | Implementation of Environmental and Social Management Plan:
Water Monitoring:
At pre-maintenance Stage:
At minimum 2 locations (2 samples)
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 2 | No | 6,780 ₹13,560 | 7,051 ₹14,102 | 6,780 ₹13,560 |
| 8.00 | Implementation of Environmental and Social Management Plan:
Water Monitoring:
After maintenance Stage:
At 2 locations (except monsoon) (Once after the completion of the maintenance work)
(Total 2 samples)
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 2 | No | 6,780 ₹13,560 | 7,051 ₹14,102 | 6,780 ₹13,560 |
| 9.00 | Implementation of Environmental and Social Management Plan:
Soil Monitoring
At pre-maintenance Stage:
At minimum 2 locations (Once before the beginning of the maintenance work)
(Total 2 samples)
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 2 | No | 7,910 ₹15,820 | 8,226 ₹16,452 | 7,910 ₹15,820 |
| 10.00 | Implementation of Environmental and Social Management Plan:
Soil Monitoring
After maintenance Stage:
At 2 locations (except monsoon) (Once after the completion of the maintenance work)
(Total 2 samples)
i) Br. No. 3/1 on Kukurmara Kandalpara Road | 2 | No | 7,910 ₹15,820 | 8,226 ₹16,452 | 7,910 ₹15,820 |
Tender Value
₹11.6 L
EMD Value
₹23,120
Closing Date
11 Aug 2025, 2:00 pmClosed
Chief Engineer (EAP), PWRD, Assam, Ghy-25
O/o the Chief Engineer (EAP), PWRD, Assam, Fatasil Ambari, Ghy-25
CE/EAP/ARRBP/OCB/Bridge-1/Kamrup/24 Repairing and Maintenance of Bridge in Kamrup district i) Br. No. 3/1 on Kukurmara Kandalpara Road
2025_PWRDW_45485_12
CE/EAP/ARRBP01TENDERS2024/66A
Open Tender
Civil Works - Bridges
360 days
Kamrup
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
₹23,120
Yes
O/o the Chief Engineer (EAP), PWRD, Assam, Ghy-25
22 May 2026
11 Jul 2025
11 Aug 2025
11 Jul 2025
11 Aug 2025
11 Jul 2025
11 Jul 2025 - 18 Jul 2025
18 Jul 2025
Amount
Applying epoxy motar over leached, honey combed and spalled concrete surface and exposed steel reinfircement complete as per Technical specifications. i) Br. No. 3/1 on Kukurmara Kandalpara Road
Greasing of bearing with ULTRATACK AP3 grease including cleaning of bearing with steel brush, removal of dusts and dirt with necessary scaffolding etc. complete as directed by the department. i) Br. No. 3/1 on Kukurmara Kandalpara Road
Replacement of Expansion joints complte as per drawings. i) Br. No. 3/1 on Kukurmara Kandalpara Road
Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawings and approved specification to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturers instructions for installation and as per technical specification clause 1207.2.5 i) Br. No. 3/1 on Kukurmara Kandalpara Road
Implementation of Environmental and Social Management Plan: Ambient Air Monitoring: At pre-maintenance Stage: At minimum 2 locations (twice a week) (Once before the beginning of the maintenance work) i) Br. No. 3/1 on Kukurmara Kandalpara Road
Implementation of Environmental and Social Management Plan: Ambient Air Monitoring: After maintenance Stage: At 2 locations (Two consecutive day) (Twice a week) (Once after the completion of the maintenance work) i) Br. No. 3/1 on Kukurmara Kandalpara Road
Implementation of Environmental and Social Management Plan: Water Monitoring: At pre-maintenance Stage: At minimum 2 locations (2 samples) i) Br. No. 3/1 on Kukurmara Kandalpara Road
Implementation of Environmental and Social Management Plan: Water Monitoring: After maintenance Stage: At 2 locations (except monsoon) (Once after the completion of the maintenance work) (Total 2 samples) i) Br. No. 3/1 on Kukurmara Kandalpara Road
Implementation of Environmental and Social Management Plan: Soil Monitoring At pre-maintenance Stage: At minimum 2 locations (Once before the beginning of the maintenance work) (Total 2 samples) i) Br. No. 3/1 on Kukurmara Kandalpara Road
Implementation of Environmental and Social Management Plan: Soil Monitoring After maintenance Stage: At 2 locations (except monsoon) (Once after the completion of the maintenance work) (Total 2 samples) i) Br. No. 3/1 on Kukurmara Kandalpara Road
Community meetings in village, 2 times. i) Br. No. 3/1 on Kukurmara Kandalpara Road
A Provisional sum (Fixed Amount) for the items of Occupational Health & Safety of Rs. 1,022.00 (not to be changed by the Bidders in BOQ) i) Br. No. 3/1 on Kukurmara Kandalpara Road
DIGANTA BURAGOHAIN (BID ID -275989)
SRI PRANAB BARMAN (BID ID -275861)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
SBDKamrup24.pdf
Tender Documents • 2.64 MB
BOQ_72030.xls
BOQ • 0.28 MB
Technical_Specification.pdf
Additional Documents • 3.77 MB
Kamrup_24_ESMP.pdf
Additional Documents • 1.42 MB
LOTB.pdf
Additional Documents • 0.13 MB
LOFB.pdf
Additional Documents • 0.16 MB
ANNEXURE_X.pdf
Additional Documents • 0.12 MB
Download all tender documents and submit your bid