Tender Value
₹5.0 L
EMD Value
₹10,020
Closing Date
8 Sept 2026, 6:00 pm
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Construction of Culvert near Anganwadi Centre at Nar Batpora (PWDDC2627100000)
2026_HAUDD_321168_2
NOTICE INVITING ETENDER No. 28 of 2026-2027 Dated 17.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
near Anganwadi Centre at Nar Batpora
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹300
Yes
FA/CAO AC NO 0216010200000007
₹10,020
Yes
17 Aug 2026
17 Aug 2026
9 Sept 2026
18 Aug 2026
8 Sept 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Diversion of Water during execution of work including dewatering all complete | 1 | LS | 20,000 | ₹20,000 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge | 8.15 | Cum | 479.3 | ₹3,906.3 |
| - | Supplying and laying of stone soling hand packed tightly including ramming, watering andn carriage complete | 1.35 | Cum | 850 | ₹1,147.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.67 | Cum | 5,202.9 | ₹3,485.94 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 11.89 | Cum | 7,104.35 | ₹84,470.72 |
| - | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.25 | Cum | 9,395.7 | ₹1,05,701.63 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,634.5 | Kgs | 123.2 | ₹2,01,370.4 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 46.65 | Sqm | 628.95 | ₹29,340.52 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 25.09 | Sqm | 718.2 | ₹18,019.64 |
| - | Supplying and filling of Nalllah Muck/GSB filling including levelling, dressing, watering and Ramming by hand Rammers in layers not exceeding 20mm thick, all carriage complete | 16.99 | Cum | 850 | ₹14,441.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1071505.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].