| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.2 LAccepted-AOC 86 B INDIRA NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹27.2 L Quoted ₹24.9 L | 1 | Accepted-AOC accepted |
| 2 | 2₹27.5 LRejected-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | SALEM | TAMIL NADU | 636456 | ₹27.5 L | 2 | Rejected-AOC Lowest 2 |
| Sl No | Description | Qty | Unit | SSRAJA ENGINEERING PRIVATE LIMITED L1 | LENIN ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the existing rails after removing the steel keys, fish plates bolts and nuts in order to provide accessibility for grinding the edges. | 700 | mtr | 294 ₹2.1 L | 315 ₹2.2 L |
| 2.00 | Charges for grinding the elongated edges to right angle to provide the expansion gap in between rails. | 130 | edges | 384 ₹49,920 | 406 ₹52,780 |
| 3.00 | Charges for Pre-assembling and reversing the grounded rails in to its position fixing the Elastic railclip, fishplates, bolts and nuts etc. | 700 | mtr | 264 ₹1.8 L | 278 ₹1.9 L |
| 4.00 | Deep screening the existing ballast to remove the broken / damaged ballast for proper drainage of track line. | 350 | mtr | 285 ₹99,750 | 299 ₹1.0 L |
| 5.00 | Lifting of track lines to the specific limit by through packing. | 350 | mtr | 136 ₹47,600 | 141 ₹49,350 |
| 6.00 | Charges for Levelling the track rail to zero, by checking and aligning the track rail with piano wire on one side and parallelism of another side rail and gauge correction to the RDSO standards etc.. | 350 | mtr. | 766 ₹2.7 L | 815 ₹2.9 L |
| 7.00 | Ballast hard broken stone 40mm size | 100 | m3 | 1,734 ₹1.7 L | 1,850 ₹1.9 L |
| 8.00 | Charges for dumping and spreading the ballast to the track. | 100 | m3 | 618 ₹61,800 | 659 ₹65,900 |
| 9.00 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 100 | m3 | 130.2 ₹13,020 | 148 ₹14,800 |
| 10.00 | Charges for dismantling and refixing the PSC sleepers T2946 after providing PCC concrete 1:4:8 this work includes leading of PSC sleepers from stock area to track line area | 80 | Nos. | 4,461 ₹3.6 L | 4,739 ₹3.8 L |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
9 Dec 2025, 2:00 pmClosed
CE / MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP I Removing wornout damaged rails dismantling the PSC concrete sleepers with fittings removing coal powder on the track line providing bed PCC mix WT V inhaul
2025_EB_629686_1
CE SE M II MTPS I CHPI OT 49 2025 2026
Open Tender
Miscellaneous Works
45 days
MTPS-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹29,000
Yes
13 May 2026
6 Dec 2025
10 Dec 2025
6 Dec 2025
9 Dec 2025
6 Dec 2025
Amount
Charges for dismantling the existing rails after removing the steel keys, fish plates bolts and nuts in order to provide accessibility for grinding the edges.
Charges for grinding the elongated edges to right angle to provide the expansion gap in between rails.
Charges for Pre-assembling and reversing the grounded rails in to its position fixing the Elastic railclip, fishplates, bolts and nuts etc.
Deep screening the existing ballast to remove the broken / damaged ballast for proper drainage of track line.
Lifting of track lines to the specific limit by through packing.
Charges for Levelling the track rail to zero, by checking and aligning the track rail with piano wire on one side and parallelism of another side rail and gauge correction to the RDSO standards etc..
Ballast hard broken stone 40mm size
Charges for dumping and spreading the ballast to the track.
HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B
Charges for dismantling and refixing the PSC sleepers T2946 after providing PCC concrete 1:4:8 this work includes leading of PSC sleepers from stock area to track line area
Charges for cleaning the mud, sand, grawal etc. in Wagon tippler V inhaul and leveling the ground dumping the waste materials in the rejected area.
Providing PCC 1:4:8 mix using 40mm HBG stone for foundation base conerete as directed by the department Engineer at site, including cost of all materials, all lead and lift, curing etc. complete in Wagon Tippler V inhaul.
Providing PCC 1:2:4 concrete pavement in between railway track line including deep screening hard broken ballast in between track line, earth work excavation, providing well gravel bed, centering and shuttering, thermacool cost and transport of concrete mixture by using JCB in Wagon Tippler V inhaul.
Charges for breaking the rail base plate concrete for removing the broken/ wornout bolt and fixing the new bolt by welding with existing bar and providing Conbextra GP2 special cement Concrete etc.
LENIN ENGINEERING WORKS (BID ID -1529519)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_752982.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid