| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 304 MAGIZHAMPOO STREET GOMATHIPURAM 6TH MAIN ROAD MADURAI 21 | MADURAI | TAMIL NADU | 625001 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.9 L (1.92%)Admitted-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹1.5 Cr+₹2.9 L (1.92%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. LUCKY ASSOCIATES L1 | Suganya Constructions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening and Black Topping of Nilaiyur - Soorakkulam Road Km 2/3-3/3 (R48) | |||||
| 2.00Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | |||||
| 3.00 | KM 2/3-3/3 | 720 | m2 | 4.1 ₹2,952 Lowest | 5 ₹3,600 |
| 4.00Picking exiting BT Surface including all materials and labour charges etc complete | |||||
| 5.00 | KM 2/3-3/3 | 1,263.75 | m2 | 15.31 ₹19,348.01 Lowest | 25 ₹31,593.75 |
| 6.00Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers | |||||
| 7.00 | KM 2/3-3/3 | 630 | m3 | 89.5 ₹56,385 Lowest | 100 ₹63,000 |
| 8.00Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | |||||
| 9.00 | KM 2/3-3/0 | 157.5 | m3 | 470.84 ₹74,157.3 Lowest | 500 ₹78,750 |
| 10.00 | KM 3/0-3/3 | 67.5 | m3 | 470.84 ₹31,781.7 Lowest | 500 ₹33,750 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
29 Jan 2021, 3:00 pmClosed
ADDITIONAL COLLECTOR DRDA MADURAI -20
DRDA MADURAI -20
MADURAI DISTRICT STRENGTHENING AND BLACK TOPPING OF 3 NOS OF ROAD IN THIRUPPARANKUNDRAM BLOCK AT MADURAI DISTRICT UNDER SCPAR 2020 21 PACKAGE NO 09
2021_RDTN_192252_1
d13/2322/2020/MDU/Tpk09
Open Tender
Civil Works
Item Rate
180 days
Thirupparankundram
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.5 L
15 Jun 2022
26 Jan 2021
29 Jan 2021
26 Jan 2021
29 Jan 2021
27 Jan 2021
Amount
Strengthening and Black Topping of Nilaiyur - Soorakkulam Road Km 2/3-3/3 (R48)
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking exiting BT Surface including all materials and labour charges etc complete
Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
BITUMINOUS MACADAM 50 MM Thick including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Provision for Name board Charges etc Complete
Provision for Sign Board Charges
Strengthening and Black Topping of Eliyarpathi - Anaikulam Road KM 5/6-6/3 ( R37 )
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking exiting BT Surface including all materials and labour charges etc complete
Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS MACADAM 50 MM Thick including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Provision for Name board Charges etc Complete
Provision for Sign Board Charges
Construction of 1.50m Span Slab Culvert @ Ch-5/620
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Filling with good river sand including cost and conveyance from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Below GL
Above GL
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire will be supplied by the contractor as per clause MOST specification.
Cement concrete 1:2:4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Bed Block.
Reinforced Cement concrete 1:11/2:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Deck Slab.
well Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
provision for wheep holes 75mm dia PVC pipe
Construction of 1.50m Span Slab Culvert @ Ch-6100m
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Filling with good river sand including cost and conveyance from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Below GL
Above GL
Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire will be supplied by the contractor as per clause MOST specification.
Cement concrete 1:2:4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Bed Block.
Reinforced Cement concrete 1:11/2:3 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer for Deck Slab.
Gritty Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
provision for wheep holes 75mm dia PVC pipe
Construction of Retaining wall @6100m
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Plain Cement concrete 1:3:6 mix usin 20 mm HBGS including all charges
Provision for Wheep holes 75 mm pvc pipe
Strengthening and Black Topping of Srinivasa Colony to Melakuilkudi Road Km 0/7-2/40 ( R100 )
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking exiting BT Surface including all materials and labour charges etc complete
Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
BITUMINOUS MACADAM 50 MM Thick including cost and conveyance of all materials to site and all labour charges for mixing ,laying etc complete
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Provision for Name board Charges etc Complete
Provision for Sign Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Suganya Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .