| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹16.1 LAccepted-AOC | ₹16.1 L | I | Accepted-AOC Rank I |
| 2 | II₹18.6 LRejected-AOC | ₹18.6 L | II | Rejected-AOC Rank II |
| Sl No | Description | Qty | Unit | J MOHANA KUMAR H2 | C KRISHNANWORKS CONTRACTOR H1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | 285 | m³ | 168.36 ₹47,982.60 | 150 ₹42,750 |
| 2.00 | Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 143 | m³ | 4,556.82 ₹6.5 L | 5,400 ₹7.7 L |
| 3.00 | Supplying and erecting steel centering including necessary supports for plain surfaces for Reinforced Cement Concrete works such as Column footing, Column pedestals, plinth beams, grade beams, staircase steps, etc which requires only nominal strutting using mild steel sheets of size 90mm x60mm and 10Bg stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc complete in all floors Complying with standard Specification( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII | 173 | m² | 416.16 ₹71,995.68 | 330 ₹57,090 |
| 4.00 | Plain Cement Concrete 1:2:4 (One Cement, two sand and four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 143 | m³ | 5,720.84 ₹8.2 L | 6,750 ₹9.7 L |
| 5.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 51 | m² | 412.74 ₹21,049.74 | 480 ₹24,480 |
Tender Value
₹23 L
EMD Value
₹23,000
Closing Date
25 Feb 2026, 3:00 pmClosed
Executive Officer
Kappiyarai Town Panchayat
Providing Cement Concrete Road at Kundukulam to Pottakulam Road, KandanKuzhi vilai to Vattavilai Anganvadi Road Thenkankuzhi to Nedunkulam Road St.Antony Church in Kappiyarai Town Panchayat
2026_DTP_655305_1
07/2026/A1
Open Tender
Civil Works
180 days
Kappiyarai Town Panchayat
Class IV
2 documents required · 2 mandatory
₹0
₹23,000
Yes
KappiyaraiTown Panchayat
2 Mar 2026
11 Feb 2026
25 Feb 2026
11 Feb 2026
25 Feb 2026
11 Feb 2026
11 Feb 2026 - 25 Feb 2026
16 Feb 2026
Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10
Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Supplying and erecting steel centering including necessary supports for plain surfaces for Reinforced Cement Concrete works such as Column footing, Column pedestals, plinth beams, grade beams, staircase steps, etc which requires only nominal strutting using mild steel sheets of size 90mm x60mm and 10Bg stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc complete in all floors Complying with standard Specification( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII
Plain Cement Concrete 1:2:4 (One Cement, two sand and four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Please Enable Macros to View BoQ information
Compatibility Report for BOQ-3.
Run on 10/5/2024 12:20
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Significant loss of functionality
Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped.
'BoQ1'!A1:II33
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
KNMT2526Bid.pdf
Tender Documents • 0.98 MB
BOQ_785731.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid