| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC 532 KAJORA GRAM DURGAPUR KAJORA 713363 WEST BENGAL | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.7 L+₹23,788.80 (5.38%)Rejected-AOC PANDIT SHIVDUT LANE RANIGANJ BARDHAMAN WEST BENGAL 713347 | RANIGANJ | BARDHAMAN | WEST BENGAL | 713347 | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.7 L+₹1.3 L (29.4%)Rejected-AOC 0 KALIKAPUR KALIKA PUR CHAMPAHATI SOUTH 24 PARGANAS WEST BENGAL 743330 | 24 PARAGANAS SOUTH | WEST BENGAL | 743330 | L3 | Rejected-AOC L3 |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
9 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer (EnM), Kajora Area
OFFICE OF THE GENERAL MANAGER KAJORA AREA PIN 713338
Fabrication and Installation of keps girder assy at Pit no. 2 of Madhabpur Colliery
2024_ECL_302773_1
GM/KAJ/AE(EnM)/TENDER /23-24/134 Date 20.02.202
Open Tender
Miscellaneous Works
Item Rate
30 days
Kajora
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,300
17 Apr 2024
27 Feb 2024
11 Mar 2024
27 Feb 2024
9 Mar 2024
27 Feb 2024
27 Feb 2024 - 2 Mar 2024
Amount
Item Description/ Heading
Transporting/ carrying of required material from Area store to colliery site with loading and unloading - Un Skilled
Opening of both side cages from keps and placing at same distance from working site - Semi skilled
Opening of both side cages from keps and placing at same distance from working site - Un skilled
Dismantling of linkage like tie-road, lever and opening of pins both side keps asembly and old used (damaged) steel structure with platform - Semi Skilled
Dismantling of linkage like tie-road, lever and opening of pins both side keps asembly and old used (damaged) steel structure with platform - Un Skilled
Making temporary platform below keps girder for ventilation and execution, required job for duggi cutting both side in proper condition for placing girders and then placing of MS Plate etc. - Semi Skilled
Making temporary platform below keps girder for ventilation and execution, required job for duggi cutting both side in proper condition for placing girders and then placing of MS Plate etc. - Un Skilled
Breaking of concrete on all 04 (four) corners and taking out of old & used (damaged) girders, through air compressor at the site - Semi Skilled
Breaking of concrete on all 04 (four) corners and taking out of old & used (damaged) girders, through air compressor at the site - Un Skilled
Making / fabricating and blending of 04 sets of keps assembly (joist 300 X 140mm) - Semi Skilled
Making / fabricating and blending of 04 sets of keps assembly (joist 300 X 140mm) - Un Skilled
Making/ fabricating and blending kabja assembly through (MS plate 10mm/ 12mm) with proper hole - 8 nos pairs - Semi skilled
Making/ fabricating and blending kabja assembly through (MS plate 10mm/ 12mm) with proper hole - 8 nos pairs - Un skilled
Making/ fabricating threading of tie rod and drive handle assembly and brackets (MS round 32mm dia) sockets assembly -Semi Skilled
Making/ fabricating threading of tie rod and drive handle assembly and brackets (MS round 32mm dia) sockets assembly -Un Skilled
Making/ fabricating of cage receivers and brackets (MS Channel 125 X 65mm) - 8 Nos- Semi Skilled
Making/ fabricating of cage receivers and brackets (MS Channel 125 X 65mm) - 8 Nos- Un Skilled
Fitting and jamming of keps girders after centering & labeling on technical point of view -Semi Skilled
Fitting and jamming of keps girders after centering & labeling on technical point of view -Un Skilled
Fitting and setting in proper place of both side linkage with tie-rod, cage receivers and other etc.- Semi Skilled
Fitting and setting in proper place of both side linkage with tie-rod, cage receivers and other etc.- Un Skilled
Making/ fabricating top platform both side of mine shaft and at placing of both side cage on keps and fitting and trial & alignment of cage with up and down pit no 2 - Semi Skilled
Making/ fabricating top platform both side of mine shaft and at placing of both side cage on keps and fitting and trial & alignment of cage with up and down pit no 2 - Un Skilled
Oxygen Gas
DA Gas
Welding Rod
Primer and Paint
Nut Bolt (D/Size)
Pins assembly for Kabja (as per sample)
Pins assembly for tie rod (as per sample)
Cement
20mm stone chips
Quick F/b material
Total impact of GST for the purpose of CTC
Indra Deo Prasad
M/S GHOSH ENTERPRISE
techsummary_313730.pdf
PDF • 0.85 MB
finsummary_313730.pdf
PDF • 0.85 MB
PO.pdf
PDF • 0.67 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .