Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹8.6 CrAdmitted-Finance | ₹8.6 Cr | H1 | Admitted-Finance |
| 2 | H2₹7.4 CrAdmitted-Finance | ₹7.4 Cr | H2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIVAM BUILDERS H1 | SHIV BOREWELL COMPANY H2 |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 1.3 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs including survey, design, Providing , Supplying, erection and construction of 1 No. of Pumping stations and all appurtenant structures and allied works;
3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 1600 m of dia 80 mm and DI K-7 pipe having length of 1365 m and dia 150 mm (ii) Treated water pumping main of DI K-7 pipe having length of 52 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Treated Water Sump with Pump House
5. Providing , Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipments and fittings complete in all respect | 1 | nos | 4,38,00,000 ₹4,38,00,000 Lowest | 4,60,45,155 ₹4,60,45,155 |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - |
| 1.03 | 1st Year | 1 | nos | 13,01,000 ₹13,01,000 | 9,50,000 ₹9,50,000 Lowest |
| 1.04 | 2nd Year | 1 | nos | 13,79,000 ₹13,79,000 | 10,07,000 ₹10,07,000 Lowest |
| 1.05 | 3rd Year | 1 | nos | 14,61,803 ₹14,61,803 | 10,67,420 ₹10,67,420 Lowest |
| 1.06 | 4th Year | 1 | nos | 15,49,511 ₹15,49,511 | 11,31,465 ₹11,31,465 Lowest |
| 1.07 | 5th Year | 1 | nos | 16,42,481 ₹16,42,481 | 11,99,353 ₹11,99,353 Lowest |
| 1.08 | 6th Year | 1 | nos | 17,41,030 ₹17,41,030 | 12,71,314 ₹12,71,314 Lowest |
| 1.09 | 7th Year | 1 | nos | 18,45,492 ₹18,45,492 | 13,47,593 ₹13,47,593 Lowest |
| 1.10 | 8th Year | 1 | nos | 19,56,222 ₹19,56,222 | 14,28,449 ₹14,28,449 Lowest |
Tender Value
₹4.9 Cr
EMD Value
₹2.4 L
Closing Date
6 May 2026, 5:30 pmClosed
CMO BIJAWAR
OFFICE OF NAGAR PARISHAD BIJAWAR WARD NO.07 BIJAWAR DISTT. CHHATARPUR M.P.
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR BIJAWAR TOWN
2026_UAD_496049_1
NIT/316/DATE/31.03.2026
Open Tender
Civil Works - Others
Lump-sum
360 days
Bijawar
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
Yes
₹2.4 L
25 May 2026
1 Apr 2026
8 May 2026
1 Apr 2026
6 May 2026
1 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 1.3 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs including survey, design, Providing , Supplying, erection and construction of 1 No. of Pumping stations and all appurtenant structures and allied works;
3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 1600 m of dia 80 mm and DI K-7 pipe having length of 1365 m and dia 150 mm (ii) Treated water pumping main of DI K-7 pipe having length of 52 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Treated Water Sump with Pump House
5. Providing , Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipments and fittings complete in all respect | - | nos | - | - |
| 1.02 | Operation and Maintenance Cost next 10 Years | - | nos | - | - |
| 1.03 | 1st Year | - | nos | 11,70,600 | - |
| 1.04 | 2nd Year | - | nos | - | - |
| 1.05 | 3rd Year | - | nos | - | - |
| 1.06 | 4th Year | - | nos | - | - |
| 1.07 | 5th Year | - | nos | - | - |
| 1.08 | 6th Year | - | nos | - | - |
| 1.09 | 7th Year | - | nos | - | - |
| 1.1 | 8th Year | - | nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tender_Doc.pdf
Tender Documents • 1.82 MB
SpecificationsforSewage.pdf
Other Document • 2.61 MB
BOQ_594744.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].