Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹27.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹27.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹27.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹27.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.8 L
EMD Value
₹27,835
Closing Date
31 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMISSIONER, SMC
Commissioner Sambalpur Municipal Corporation
Construction of 10 seated Toilet at Hirakud Colony (Jawan-E Hind Club near Nallah) in Ward No-32
2026_ORULB_143313_5
31/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
Sambalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹27,835
Yes
3 Nov 2026
22 Oct 2026
2 Nov 2026
22 Oct 2026
31 Oct 2026
22 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum stoney earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and leveling the bed upto the required depth and depositing the excavated materials away from the work site with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | 56.9 | cum | 282.89 | ₹16,096.19 |
| 2 | Filling in foundation, trenches and plinth with river sand, well watered and compacted in layers with top surface dressed and leveled to proper gradient including cost of all labours, materials, conveyance, loading and unloading, all taxes and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge | 53.87 | cum | 867.9 | ₹46,753.77 |
| 3 | Providing and laying of cement concrete of grade (1:3:6) of size 25mm to 40mm hard granite crusher broken metal mixed with concrete mixture,lowering and compacting in proper thickness,watering and curing for the required period including cost of all labour,materials,conveyance,loading and unloading,all taxes and royalties,sundries and t&p etc comp as per direction of EIC | 21.3 | cum | 6,007.4 | ₹1,27,957.62 |
| 4 | Brick work with fly ash. bricks (23cm x11cm x 8cm) size having crushing strength not less than 35kg / cm2 with dimensional tolerance ± 8 percent in C.M. (1:6) in F&P ,immersing the bricks in water before use,splays cutting and watering etc including all cost of labour,materials,conveyance,loading and unloading,all taxes and royalties,sundries and T&P etc comp. as per direction of EIC | 35.48 | cum | 5,439.2 | ₹1,92,982.82 |
| 5 | Providing and laying in position machine batched/ machine mixed concrete of specified grade for reinforced cement concrete eork including laying of concrete using 10mm to 20mm size crusher broken hard granite chips including the cost of centering,shuttering and reinforcement,improvement workability without impairing strength and durability as per direction of EIC including cost of all materials,conveyance,royalties and taxes,loading and unloading,cost of labour,sundries,T&P etc comp. Column footing | 8.82 | cum | 6,489.5 | ₹57,237.39 |
| 6 | Plinth beam horizontal wall | 3.75 | cum | 7,379.3 | ₹27,672.38 |
| 7 | Column | 2.39 | cum | 15,445.4 | ₹36,914.51 |
| 8 | Lintel band | 1.87 | cum | 14,203.2 | ₹26,559.98 |
| 9 | Wall Beam | 1.87 | cum | 15,445.4 | ₹28,882.9 |
| 10 | Slab & Chajjah | - | cum | 13,806.7 | - |
stage.html
html • 0.04 MB
finance_614483.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_614483.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .