Loading…
Loading…
Tender Value
₹23.9 L
EMD Value
₹47,900
Closing Date
25 Aug 2026, 5:00 pm2d left
EE RDSD CHATRA
RDSD CHATRA
Construction of Boundary wall UPG P.S. Chilhiya Village- Chilhiya, Panchayat- Tulbul, Block- Kanhachatti, District- Chatra.
2026_RDSPL_117543_1
RDD/SD/CHATRA/22/2026-27/Gr_13
Open Tender
Civil Works
Percentage
90 days
CHATRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹47,900
18 Aug 2026
18 Aug 2026
27 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in all kinds of soil -do- -do- all complete job as per specification and direction of E/I. (5.1.1 + 5.1.2) | 1 | M3 | 167.33 | ₹167.16 |
| 2 | Providing sand filling in foundation trenches -do- -do- all complete job as per specification & direction of E/I.(5.1.10) | - | M3 | 589.51 | - |
| 3 | Providing Class 75B brick flat soling joint filled with local sand -do- -do- all complete as per specification and direction of E/I. (5.6.3) | - | M2 | 330.34 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) In Foundation (5.3.1.2) | 1 | M3 | 4,598.23 | ₹4,593.63 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
In Column(5.3.10) | 1 | M3 | 6,082.45 | ₹6,076.37 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.(5.3.17.1) | - | M2 | 194.5 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts.(5.3.17.6) | - | M2 | 465.38 | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)(5.3.9.1) | - | M3 | 5,218 | - |
| 9 | Providing 75B brick work in C.M. (1:6) in super structure -do- -do- all complete job as per specification and direction of E/I.(5.2.14) | - | M3 | 5,244.08 | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). In Band at Lintel Level(5.3.11) | - | M3 | 6,308.87 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_158864.xls
BOQ • 0.28 MB
SBD13.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].