Loading…
Loading…
Tender ID
Tender Value
₹3.6 L
EMD Value
₹7,000
Closing Date
12 Mar 2026, 4:00 pmClosed
SE ECC(D)Agra
220 KV Sub Station 64 Khamba Sikandra Agra
172/ECC(D)Ag/2025-26
2026_DVVNL_1111668_1
172/ECC(D)Ag/2025-26
Open Tender
Civil Works
Item Wise
30 days
Agra
As Per Tender Documents
3 documents required · 3 mandatory
₹1,180
DVVNL
₹7,000
2 Feb 2026
2 Feb 2026
13 Mar 2026
2 Feb 2026
12 Mar 2026
2 Feb 2026
Contouring of sub-station/land for line with help of leveling instrument/total station instrument & staff including plotting of trees and structure if any including preparation of contour plan in 6 copies including marking periphery including all labour, Supervisor, instrument, T&P materials complete as per direction of Engineer I/C. (CSI No. 28.11)
Marking of building/Tower foundation in new sub-station (132/220 KV) in UPPCL land as per approved layout drawing with help of Theodolite/ total station instrument and closing of Travers for main Gantry etc including cost of all labour, Supervisor, instrument, T&P materials complete as per direction of Engineer I/C. (CSI No. 28.12)
Making borehole in all type of soil by any method required as per site conditions in accordance with IS specification No 1982-1979 and 1498- 1970 and conducting standard penetration test in accordance with IS specification No 2131 – 1981 at every 1.5 M approx . or as per strata during making borehole and also collecting undisturbed and disturbed soil samples at a depth of approx. 1.5 M depth or change of strata of soil as per site requirements in each borehole in accordance with IS specification 1892-1978. (Depth of water table as detemine from borehole or from nearest waterwell ) Each Boreholes to be bored upto 15.00 depth. (CSI No. 28.13)
Undisturbed soil samples collected in field will be tested in Laboratory and preparation of samples for tests mentioned below, will be done/governed in accordance with IS 2720 (Part 1)-1983 i) Tri axial compression test and determination of shear parameters as per ISS –2720 (Part ix) ISS 2720-(Part xii) ISS 2720-(Part xiii) on silty/sandy soil . or Consolidation Test as per ISS-2720( Part xv )on clay soil ii)-Sieve analysis test as per ISS 2720 (Part iv) iii)-Atterberg’s limit tests as per ISS –2720 (Part v) iv)-Particle size analysis test as per ISS 2720 (Part iv) v)- Natural moisture content test as per ISS 2720 (Part vi) vi)-Wet density test and dry density test as per ISS 2720 (Part vi) vii)-Specific gravity test as per ISS 2720 (Part iii) section 2 Disturbed soil samples will be prepared in accordance with ISS 2720 (Part I) 1983 and tested as follows i)- Sieve analysis test as per ISS – 2720 (part iv) ii)- Atterberg’s limit tests as per ISS- 2720(Part v). (CSI No. 28.14)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
TenderDocuments.rar
Tender Documents • 2.17 MB
BOQ_2054553.xls
BOQ • 0.23 MB
OM1271.pdf
PDF • 0.35 MB
OM172.pdf
PDF • 0.36 MB
1205.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .