| Sl No | Description | Qty | Unit | M/s Bright Engineering L3 | Shree ram engineering works L2 | M/S R L ENGINEERING L1 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: 1. Cleaning of power rail path. 2. Cleaning of Gearboxes for both Main and Auxiliary cranes. 3. Cleaning of Brake Assemblies of Main and Auxiliary cranes. 4. Changing of Gear oil of Both Main and Auxiliary cranes. 5. Tightening and alignment of Rail Line Bolts and Nuts. 6. Repairing and overhauling Brake assembly of both Main & Auxiliary hoist systems. 7. Overhauling Gearbox of both Main & Auxiliary hoist systems. 8. Dismantling, greasing and fitment of couplings of gearbox assembly. 9. Dismantling, greasing and fitment of brake spares of Brake assembly. 10. Calibration and testing of crane for safe and proper operation of EOT cranes. | ||||||
| 2.00Material required for Repairing / Overhauling of EOT crane of BWS of ER Shovel Section of Khadia Project. | ||||||
| 2.01 | Cost of C.T Tripping Brake Assembly. | 2 | Nos. | 16,400 ₹32,800 | 14,250 ₹28,500 Lowest | 16,000 ₹32,000 |
| 2.02 | Cost of Brake Shoes Changing. | 2 | Nos. | 3,750 ₹7,500 Lowest | 11,700 ₹23,400 | 3,800 ₹7,600 |
| 2.03 | Cost of HLC Auxiliary Contactor. | 2 | Nos. | 18,400 ₹36,800 | 13,500 ₹27,000 Lowest | 14,600 ₹29,200 |
| 2.04 | Cost of Auxiliary Contactor 3TA-22-10. | 2 | Nos. | 14,995 ₹29,990 | 12,000 ₹24,000 | 10,995 ₹21,990 Lowest |
| 2.05 | Cost of Hoist Drum Brake Coupling 20402/05. | 2 | Nos. | 9,500 ₹19,000 | 9,000 ₹18,000 Lowest | 9,500 ₹19,000 |
| 2.06 | Cost of Main Shaft Coupling 20407/350/3. | 2 | Nos. | 9,000 ₹18,000 | 8,700 ₹17,400 Lowest | 9,300 ₹18,600 |
| 2.07 | Cost of Thyristor Brake Assembly. | 4 | Nos. | 13,600 ₹54,400 | 11,200 ₹44,800 Lowest | 14,500 ₹58,000 |
| 3.00 | Labour charges for repairing/overhauling the EOT Service Crane including contractor's profit.
Note : It includes a group of 01 No. Supervisor, 02 Nos. Skilled Electrician, 02 Nos. Skilled Fitter, , 02 Nos. Semi- Skilled Manpower and 02 Nos. Un-skilled Manpower for 01 shift per day for 06 days. | 1 | Job | 38,800 ₹38,800 | 42,000 ₹42,000 | 38,500 ₹38,500 Lowest |
Tender Value
₹3.4 L
EMD Value
₹4,300
Closing Date
30 Apr 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR,SONEBHADRA, U.P-231222
Repairing / Overhauling of EOT crane of BWS of ER Shovel Section of Khadia Project.
2025_NCL_334290_1
KHD/G.M. (Excv)/E-Tender/25-26/70
Open Tender
Excavation Department Work
Item Rate
6 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,300
20 Aug 2025
18 Apr 2025
1 May 2025
18 Apr 2025
30 Apr 2025
19 Apr 2025
18 Apr 2025 - 26 Apr 2025
Amount
Scope of Work/Technical Specifications etc: 1. Cleaning of power rail path. 2. Cleaning of Gearboxes for both Main and Auxiliary cranes. 3. Cleaning of Brake Assemblies of Main and Auxiliary cranes. 4. Changing of Gear oil of Both Main and Auxiliary cranes. 5. Tightening and alignment of Rail Line Bolts and Nuts. 6. Repairing and overhauling Brake assembly of both Main & Auxiliary hoist systems. 7. Overhauling Gearbox of both Main & Auxiliary hoist systems. 8. Dismantling, greasing and fitment of couplings of gearbox assembly. 9. Dismantling, greasing and fitment of brake spares of Brake assembly. 10. Calibration and testing of crane for safe and proper operation of EOT cranes.
Material required for Repairing / Overhauling of EOT crane of BWS of ER Shovel Section of Khadia Project.
Cost of C.T Tripping Brake Assembly.
Cost of Brake Shoes Changing.
Cost of HLC Auxiliary Contactor.
Cost of Auxiliary Contactor 3TA-22-10.
Cost of Hoist Drum Brake Coupling 20402/05.
Cost of Main Shaft Coupling 20407/350/3.
Cost of Thyristor Brake Assembly.
Labour charges for repairing/overhauling the EOT Service Crane including contractor's profit. Note : It includes a group of 01 No. Supervisor, 02 Nos. Skilled Electrician, 02 Nos. Skilled Fitter, , 02 Nos. Semi- Skilled Manpower and 02 Nos. Un-skilled Manpower for 01 shift per day for 06 days.
Labour charges for overhauling of crane (gearbox of hoisting system) including contractor's profit. Note : It includes a group of 01 No. Supervisor, 02 Nos. Skilled Electrician, 02 Nos. Skilled Fitter, , 02 Nos. Semi- Skilled Manpower and 02 Nos. Un-skilled Manpower for 01 shift per day for 06 days.
Total impact of GST for the purpose of CTC
Shree ram engineering works (BID ID -1150410)
M/s Bright Engineering (BID ID -1149964)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_346532.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .