Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance 0 DHARAMBUGH KRALPORA BAGI MEHTAB B K PORA BUDGAM JAMMU KASHMIR 190019 | SRINAGAR | JAMMU AND KASHMIR | 190019 | ₹6.8 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 LAdmitted-Finance | ₹6.8 L | L2 | Admitted-Finance |
| 3 | L3₹7.1 LAdmitted-Finance | ₹7.1 L | L3 | Admitted-Finance |
| 4 | L4₹7.5 LAdmitted-Finance | ₹7.5 L | L4 | Admitted-Finance |
| 5 | L5₹8.0 LAdmitted-Finance | ₹8.0 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MIR IRFAN ELECTRICAL/SUPPLIERS L1 | M/S QADRI ELECTRICALS L3 | M/S KHAN ENTERPRISES L5 | BUDOO ELECTRICALS AND SUPPLIERS L4 | AL FALAH ELECTRICAL WORKS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Supply, installation, testing & commissioning of 200 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | Nos | 3,19,200 ₹3.2 L | 3,50,000 ₹3.5 L | 4,43,000 ₹4.4 L | 3,50,000 ₹3.5 L | 3,85,000 ₹3.9 L |
| 1.02 | Supply, installation, testing & commissioning of Gapless Surge Arrestor, 9kv,10kv, Lighting Arrestor set heavy duty with polymer Housing station type | 1 | set | 3,200 ₹3,200 | 4,000 ₹4,000 | 4,000 ₹4,000 | 7,000 ₹7,000 | 2,000 ₹2,000 |
| 1.03 | Supply, installation, testing & commissioning of 11 kv 200 Amperes, Triple pole switches Gang operated (G.O Set) | 1 | set | 10,500 ₹10,500 | 13,000 ₹13,000 | 13,000 ₹13,000 | 15,000 ₹15,000 | 9,500 ₹9,500 |
| 1.04 | Supply, installation, testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | set | 4,200 ₹4,200 | 4,500 ₹4,500 | 4,000 ₹4,000 | 7,000 ₹7,000 | 3,000 ₹3,000 |
| 1.05 | Supply, installation, testing & commissioning of 300 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type | 40 | Mtr | 15,600 ₹15,600 | 2,000 ₹2,000 | 26,640 ₹26,640 | 28,000 ₹28,000 | 20,000 ₹20,000 |
| 1.06 | Supply, installation, testing & commissioning of 9 Mtr. Long ST Poles (410, SP-33) | 2 | Nos | 35,600 ₹35,600 | 34,000 ₹34,000 | 31,000 ₹31,000 | 40,000 ₹40,000 | 28,000 ₹28,000 |
| 1.07 | Supply, installation, testing & commissioning of 11 Mtr. Long ST Poles (410, SP-34) | 1 | Nos | 24,100 ₹24,100 | 1,800 ₹1,800 | 19,000 ₹19,000 | 20,000 ₹20,000 | 20,000 ₹20,000 |
| 1.08 | Supply, installation, testing & commissioning of 11 KV Polymeric Composit disc insulator 12 KV,5KN, light impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm | 2 | set | 1,800 ₹1,800 | 300 ₹300 | 290 ₹290 | 200 ₹200 | 2,400 ₹2,400 |
| 1.09 | Providing and fixing of G.I. Channel iron (75x40x6)mm 5.5ft long 8No's alongwith braces | 280 | Kg | 36,400 ₹36,400 | 37,800 ₹37,800 | 44,240 ₹44,240 | 30,800 ₹30,800 | 26,600 ₹26,600 |
| 1.10 | Providing and fixing of Galvanized Nuts and Bolts of sizes. | 20 | Kgs | 2,400 ₹2,400 | 3,000 ₹3,000 | 3,000 ₹3,000 | 6,000 ₹6,000 | 2,000 ₹2,000 |
Tender Value
₹9.2 L
EMD Value
₹18,500
Closing Date
16 Feb 2026, 4:00 pmClosed
Executive Engineer EDI
Office of Executive Engineer EDI Basantbagh
Creation of 200 kva Dedicated substation alongwith HT/LT Network atAzad Filling Station Munwar
2026_PDD_302136_1
E-NIT No 053/EDI
Open Tender
Electrical Works
20 days
Office of Executive Engineer EDI
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
Executive Engineer EDI
₹18,500
Yes
21 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
3 Feb 2026 - 5 Feb 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: Executive Engineer, Electric Division I ,Srinagar
Name of Work: Creation of 200 kva Dedicated substation alongwith HT/LT Network atAzad Filling Station Munwara.
NIT No: ED I 053 of 2025-26; Dated: 03.02.2026
Sl.No Item Description (SITC) Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rate Inclusive of all taxes & duties Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Supply, installation, testing & commissioning of 200 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate item1 1 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of Gapless Surge Arrestor, 9kv,10kv, Lighting Arrestor set heavy duty with polymer Housing station type item2 1 set Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 11 kv 200 Amperes, Triple pole switches Gang operated (G.O Set) item3 1 set Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A item4 1 set Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 300 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type item5 40 Mtr Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 9 Mtr. Long ST Poles (410, SP-33) item6 2 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 11 Mtr. Long ST Poles (410, SP-34) item7 1 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 11 KV Polymeric Composit disc insulator 12 KV,5KN, light impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm item8 2 set Excess(+) Full Conversion INR
Providing and fixing of G.I. Channel iron (75x40x6)mm 5.5ft long 8No's alongwith braces item9 Kg Excess(+) Full Conversion INR
Providing and fixing of Galvanized Nuts and Bolts of sizes. item10 20 Kgs Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of LT Distribution Box for 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits item11 1 Nos Excess(+) Full Conversion INR
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover item12 3 Nos Excess(+) Full Conversion INR
Providing and fixing of 11 KV Polymeric Composit pin with insulator insulator 12 KV, 5 KN,Light Impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm item13 9 Nos Excess(+) Full Conversion INR
Providing and fixing of Danger Plates with clamps with writing in English and Regional Language item14 4 Nos Excess(+) Full Conversion INR
Providing and fixing of Anti Climbing Device with Clamps item15 4 Nos Excess(+) Full Conversion INR
Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) item16 3 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of ACSR 0.05 Conductor item17 0.02 Km Excess(+) Full Conversion INR
Providing and fixing of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm item18 3 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) item19 65 Mtr Excess(+) Full Conversion INR
Supply, installation, testing & commissioning Heat Shrinkable outdoor cable Termination Kit for 11 kv ABC 50-95mm² item20 2 Nos Excess(+) Full Conversion INR
Providing and fixing of SL Clamps item21 4 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of biometallic Clamps item22 3 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of Al. thimbles 120mm² item23 8 Nos Excess(+) Full Conversion INR
Supply and fixing of suspension/Tension clamp with eye hook including Back clamp/Collar for pole item24 4 Nos Excess(+) Full Conversion INR
Providing and laying of Cement bottoming 1:2:4 mix as per Standards 0.5 cum per pole item25 3 Nos Excess(+) Full Conversion INR
Supply, installation, testing & commissioning of 11kv CT/PT Unit complete job item26 1 Nos Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Quoted Rate in Words
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD053.pdf
Other Document • 0.73 MB
TECH053.pdf
Other Document • 18.80 MB
BOQ_980333.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid