Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance | ₹7.5 L | L1 | Accepted-Finance accept |
| 2 | Not Admitted-Finance BHARAHADNA SADAR MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | - | - | Not Admitted-Finance Price Bid not complied |
Tender Value
₹7.7 L
EMD Value
₹77,000
Closing Date
18 Feb 2026, 12:00 pmClosed
EE CD2 PWD MIRZAPUR
EE CD2 PWD MIRZAPUR
SR
2026_CEMRZ_1114566_4
189/2A dt 17-01-2026
Open Tender
Civil Works
60 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Yes
₹77,000
Yes
EE CD2 PWD MIRZAPUR
22 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
11 Feb 2026
Providing, laying, spreading and compacting stone aggregates of 53 to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD Specification Clause 405.
Construction of un-reinforced,construction joint only,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 20 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 Technical Specification Clause 303.1. in Patri for earth work to painting portion
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_2068143.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid