| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC Low level quoted rate |
| 2 | L2₹10.1 LRejected-Finance | ₹10.1 L | L2 | Rejected-Finance High level quoted rate |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-1.Machinery Details not Sufficient2.Current Renewal Certificate after 31.03.2025 not submitted3.Renewal copy of solvancy certificate not submitted4.Attested copy of certificates not submitted5.Latest copy of GST Certificate not submitted |
| Sl No | Description | Qty | Unit | PVMG TRADERS L1 | V.YOGANATHAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 13.68 | Cum | 237 ₹3,242.16 | 264 ₹3,611.52 |
| 2.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III | 41.8 | Cum | 2,205 ₹92,169 | 2,448 ₹1.0 L |
| 3.00 | Supplying and centering shuttering including necessary supports for plane and conveyance of all materials to site and all labour charges etc complete | 193.8 | Sqm | 493 ₹95,543.40 | 547 ₹1.1 L |
| 4.00 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 46.93 | Cum | 4,845 ₹2.3 L | 5,378 ₹2.5 L |
| 5.00 | Cement concrete 1:2:4mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc. | 24.23 | Cum | 6,029 ₹1.5 L | 6,692 ₹1.6 L |
| 6.00 | Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc. | 31.36 | Cum | 6,496 ₹2.0 L | 7,211 ₹2.3 L |
| 7.00 | Supplying and fixing of Bitumen pad for expansion joints | 6.36 | Sqm | 202 ₹1,284.72 | 224 ₹1,424.64 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,38,494.22 ₹1.4 L | 1,53,728.07 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹10,200
Closing Date
3 Mar 2026, 3:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Providing for Cement Concrete Road in Chithalapakkam Pillaiyar Koil Street at Sirumailur Panchayat,Uthiramerur Union in Kanchipuram District under MINES FUND 2025-26
2026_RDTN_666420_1
KPM Collector Pro.No 179/2026/A6 Dt 19.02.2026
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,200
18 Apr 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .GSB Grading III
Supplying and centering shuttering including necessary supports for plane and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
Cement concrete 1:2:4mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc.
Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and labour charges etc.complete . Complying with standard specification etc.
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_800488.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_800488.xls
BOQ • 0.24 MB
Schedule.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid