Tender Value
₹4.2 L
EMD Value
₹4,700
Closing Date
30 Aug 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.Pt), Valangaiman
BDO Office, Valangaiman, Tiruvaru District
Renovation of School Building, Toilet and Kitchen Shed at Manalur in Manalur Pt_Package No. 2
2022_RDTN_248556_1
1972/2022/A2_VLG SIDS_2
Open Tender
Civil Works
Item Rate
180 days
Valangaiman block
As per Document
4 documents required · 4 mandatory
₹0
₹4,700
19 Sept 2022
25 Aug 2022
30 Aug 2022
25 Aug 2022
30 Aug 2022
25 Aug 2022
Amount
1.Repairs to PUM School Building west Facing in Manalur Habitation ,
Dismantaling of Wall Plastering Including all labour Charges and removing depris from the work site etc, complete.,…
Towards Povision Doors Replacement/Repair Charges Etc., Complete
Towards Povision Windows Replacement/Repair Charges Etc., Complete
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling Of Old Flooring Surface In Cement Mortor Including All labour Charges As Per Standard Specifications
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Cement Concrete 1:4:8 Mix Using 40mm ISS Metal Including cost and Conveyance of All materials to site and all labour charges for mixing, laying and curing etc complete for 10cum
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Wooden works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard Specifications etc., Complete
Black Board Painting using black board paint all other convence
Electrification
Tube Light Fitting
Ceiling Fan
Bulket Fitting 100W
Service Wire
Provision for Name Board
2.Repairs to PUM School Building (Single Class Room) North Facing in Manalur Habitation ,
Clean removal of plastering surface and racking out joints including cost and Conveyance of all Materials to site and labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick with water proff cement 10%by weight of cement including cost and conveyance of all materilas to site and labour charges etc complete
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Dismantling existing flooring including cost and conveyance and all other labour charges etc complete
Flooring granolethic floor finish in cement concrete 1:2 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with CM 1:3 using 10mm thick including cost and conveyance of all materilas and all labour charges etc complete
Towards Repair charges window/Door
Window
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting Two Coats Approved Distemper Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Plastic Emulsion Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Ready Mixed Enamel Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Black Board Painting Two Coats Approved Ready Mixed Enamel Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Provision For Electrical Arrangement
Tube Light Fitting
Ceiling Fan
Provision for Name board charges
3.Repairs to PUM School Boys Toilet in Manalur Habitation ,
Clean removal of plastering surface and racking out joints including cost and Conveyance of all Materials to site and labour charges etc complete
Dismantaling And Clearing The Existing Cement Concrete Flooring Including Cost and Conveyance Of all materials to site and labour charges etc complete.,,,
Cement Concrete 1:4:8 Mix Using 40mm ISS Metal Including cost and Conveyance of All materials to site and all labour charges for mixing, laying and curing etc complete for 10cum
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Flooring granolethic floor finish in cement concrete 1:2 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting Two Coats Approved Distemper Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Plastic Emulsion Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Ready Mixed Enamel Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Provision For Repair Charges Dorrs And Windows
Provision For Washbasin Charges
Provision for Name board
4.Repairs to PUM School Girls Toilet in Manalur Habitation ,
Clean removal of plastering surface and racking out joints including cost and Conveyance of all Materials to site and labour charges etc complete
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3,10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting Two Coats Approved Distemper Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Plastic Emulsion Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Ready Mixed Enamel Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Provision For Repair Charges Dorrs And Windows
Provision For Washbasin Charges
Provision for Name board
5.Repairs to School Kitchen Shed In PUE School in Manalur Habitation
Clean removal of plastering surface and racking out joints including cost and Conveyance of all Materials to site and labour charges etc complete
Dismantaling And Clearing The Existing Cement Concrete Flooring Including Cost and Conveyance Of all materials to site and labour charges etc complete.,,,
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Flooring granolethic floor finish in cement concrete 1:2 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Cement Concrete 1:4:8 Mix Using 40mm ISS Metal Including cost and Conveyance of All materials to site and all labour charges for mixing, laying and curing etc complete for 10cum
Painting Two Coats Approved Distemper Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Plastic Emulsion Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Painting Two Coats Approved Ready Mixed Enamel Paint With one Coat primer over new cement plastered surface including cost and coveyance of materials and labour charges etc complete
Provision For Repair Charges Dorrs And Windows
Provision For Electrical Arrangement
Tube Light Fitting
Ceiling Fan
CFL bulb
Service Wire
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
AKS Traders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .