| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | L1 | Accepted-AOC Awarding Letter issued | |
| 2 | L2₹3.1 L+₹14,487 (4.85%)Rejected-Finance | L2 | Rejected-Finance L2 Tender Not Accepted |
| Sl No | Description | Qty | Unit | ADITHYA CONSTRUCTIONS L1 | DR Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Removing the roots of jungle and, other plants with uprooting, and stacking at one point near by carefully using JCB and disposing off as directed by the Engineer at site & levelling the site including cost of labour charges, loading, unloading lead, lift, hire charges of T&P’s etc. Complete. | 24 | 1hour | 897 ₹21,528 Lowest | 900 ₹21,600 |
| 2.00 | Excavating the Mill reject from the dumping yard, loading, transporting by vehicle with a lead of 0-3km and unloading at site, spreading, leveling and ramping to a required thickness. This rate is inclusive of loading & unloading, spreading, levelling, cost of all materials, all labour charges, lead, ift, T&Ps, etc., and as directed by the department engineer in charge complete.(Mill reject will be supplied by the department at free of cost) | 965 | 1m³ | 249 ₹2,40,285 Lowest | 262 ₹2,52,830 |
| 3.00 | Brick work in CM 1:4 using fly ash bricks for tree protection wall as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&P etc., complete. | 2.5 | 1m³ | 7,030 ₹17,575 Lowest | 7,050 ₹17,625 |
| 4.00 | Plastering in C.M 1:5,12 mm thick for tree protection wall including cost of all materials, labour charges ,curing, lead, lift etc complete. | 70 | 1m² | 274 ₹19,180 Lowest | 300 ₹21,000 |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
11 Nov 2024, 2:00 pmClosed
CE/MTPS-II
Chief Engineer / MTPS-II / Mettur Dam-6
Providing Mill rejects in the portion between eastern side compound wall and Silo road from MTPS II Silo gate to Skew bridge from Ch.0.00-Ch.210.00 to curtail jungle growth.
2024_EB_497612_1
CE/MTPS-II/SE/Civil/OT.No. 31 / 2024-25.
Open Tender
Civil Works
Works
60 days
MTPS-II- Mettur Dam
Tender Specification
4 documents required · 4 mandatory
₹0
₹3,100
Yes
1 Sept 2025
29 Oct 2024
12 Nov 2024
29 Oct 2024
11 Nov 2024
29 Oct 2024
Amount
Removing the roots of jungle and, other plants with uprooting, and stacking at one point near by carefully using JCB and disposing off as directed by the Engineer at site & levelling the site including cost of labour charges, loading, unloading lead, lift, hire charges of T&P’s etc. Complete.
Excavating the Mill reject from the dumping yard, loading, transporting by vehicle with a lead of 0-3km and unloading at site, spreading, leveling and ramping to a required thickness. This rate is inclusive of loading & unloading, spreading, levelling, cost of all materials, all labour charges, lead, ift, T&Ps, etc., and as directed by the department engineer in charge complete.(Mill reject will be supplied by the department at free of cost)
Brick work in CM 1:4 using fly ash bricks for tree protection wall as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&P etc., complete.
Plastering in C.M 1:5,12 mm thick for tree protection wall including cost of all materials, labour charges ,curing, lead, lift etc complete.
DR Construction (BID ID -1181969)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .