Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC 01 G K ENTERPRISES DONE DARAULI ROAD DONE BUZURG SIWAN BIHAR 841235 UDYAM BR 35 0033284 | SIWAN | BIHAR | 841235 | ₹2.7 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹2.9 L+₹17,237.44 (6.33%)Rejected-Finance 29 PUCCA HOUSE MAIN ROAD MAHAGAMA GODDA 814154 JHARKHAND INDIA | GODDA | JHARKHAND | 814154 | ₹2.9 L+₹17,237.44 (6.33%) | L2 | Rejected-Finance Rejected being L2 |
| Sl No | Description | Qty | Unit | M/S JUGA WELDING WORKS L2 | M/S G.K ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Grinding Disc (140MM) | 2 | no. | 250 ₹500 | 175 ₹350 Lowest |
| 2.00 | Air Carbon Holder | 1 | no. | 3,650 ₹3,650 | 2,950 ₹2,950 Lowest |
| 3.00 | Carbon Rod | 10 | kg | 850 ₹8,500 | 450 ₹4,500 Lowest |
| 4.00 | Cleaning & dismantling of Crowd Transmission | 4 | shifts | 5,990 ₹23,960 | 5,780 ₹23,120 Lowest |
| 5.00 | Removing of Saddle Bolck & Dipper Handle | 5 | shifts | 5,990 ₹29,950 | 5,780 ₹28,900 Lowest |
| 6.00 | Replacing of Bull Gear in Shipper Shaft | 10 | shifts | 5,990 ₹59,900 | 5,780 ₹57,800 Lowest |
| 7.00 | Fitting of Boom Bushing | 4 | shifts | 5,990 ₹23,960 | 5,780 ₹23,120 Lowest |
| 8.00 | Assembling of Crowd Transmission | 8 | shifts | 5,990 ₹47,920 | 5,780 ₹46,240 Lowest |
| 9.00 | Fitting of Saddle Block & Dipper Handle | 4 | shifts | 5,990 ₹23,960 | 5,780 ₹23,120 Lowest |
| 10.00 | Contractor’s Profit (10% of Service Charges) | 1 | no. | 22,990 ₹22,990 | 20,582 ₹20,582 Lowest |
Tender Value
₹2.6 L
EMD Value
₹3,400
Closing Date
27 Feb 2026, 9:00 amClosed
Area Engineer(Excv)
Rajmahal Area, Dhankunda, PO-Bara Simra, Dis-Godda
DISMANTLING AND OVERHAULING OF CROWD TRANSMISSION GEAR RETAINER AND BOOM BUSHING OF PH 2300XPA LR SHOVEL NO RS15 OF RAJMAHAL PROJECT
2026_ECL_353572_1
ECL/RJML/AE(EXCV)/ 25-26/E-TEN/083 dated 11.02.2026
Open Tender
Excavation Department Work
Item Rate
20 days
Rajmahal Area, Dhankunda, PO-Bara Simra, Dis-Godda
As per NIT
2 documents required · 2 mandatory
₹3,400
22 Jun 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
20 Feb 2026 - 25 Feb 2026
Grinding Disc (140MM)
Air Carbon Holder
Carbon Rod
Cleaning & dismantling of Crowd Transmission
Removing of Saddle Bolck & Dipper Handle
Replacing of Bull Gear in Shipper Shaft
Fitting of Boom Bushing
Assembling of Crowd Transmission
Fitting of Saddle Block & Dipper Handle
Contractor’s Profit (10% of Service Charges)
GST @18% on all above
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_366374.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .