Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹17.5 L+₹1.2 L (7.36%)Rejected-AOC | L2 | Rejected-AOC Admitted | |
| 3 | l3₹20.0 L+₹3.7 L (22.6%)Rejected-AOC | l3 | Rejected-AOC Admitted | |
| 4 | Rejected-Technical | - | Rejected-Technical Not in Category | |
| 5 | Rejected-Technical | - | Rejected-Technical Not in Category |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
19 Dec 2020, 6:00 pmClosed
GE (I) Campbell Bay
Garrison Engineer (I), Military Engineer Services, Army Land, Great Nicobar Islands, Campbell Bay, Pin 744 302
MANNING AND OPERATION AND COMPREHENSIVE MAINT OF WATER SUPPLY INSTALLATIONS AND ALLIED WORKS AT INS BAAZ 3U DET AND COTS RADAR CAMPBELL BAY UNDER GE (I) CAMPBELL BAY
2020_MES_378329_5
8709/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE (I) Campbell Bay
As per tender documents
9 documents required · 9 mandatory
₹500
Yes
GE (I) Campbell Bay
₹36,000
Yes
29 Dec 2020
3 Dec 2020
21 Dec 2020
4 Dec 2020
19 Dec 2020
4 Dec 2020
Amount
Daily Maintenance, Manning & Operation of Water Supply Installation at INS Baaz comprising with pumping sets and operation of electric panels, sluice valve and electric panels for pumping and supply of potable water during supply hrs with ONE OPERATOR Skilled (FGM) daily in TWO SHIFTS PER DAY (Morning, Evening ) (8 Hour Per Shift) including Sundays and Holidays, complete all as specified and as directed by Engineer-in-Charge. Details of Plants:- (a) 7.5 HP Electric driven Pump set -02 Nos (01W+01S) (for Shallow Well) (b) 7.5 HP Electric driven Pump set-02 Nos (01W+01S) (c) 5 HP Pump set -02 Nos ( 01 Engine Driven + 01 Electric Driven) (for DSC Line) (d) 15 HP submersible Pump Set - 02 Nos (01W+01S) (for Shallow Well)
Daily Maintenance, Manning & Operation of RO Plant at INS Baaz comprising with pumping sets and operation of valve and supply of potable water during supply hrs with ONE OPERATOR Skilled (FGM) daily in TWO SHIFTS PER DAY (Morning, Evening ) (8 Hour Per Shift) including Sundays and Holidays, complete all as specified and as directed by Engineer-in-Charge. Details of Plants:- RO Plant - 01 No @ 1000 LPH near DSC Line
Daily Maintenance, Manning & Operation of Water Supply Installation at 3U Det comprising with pumping sets and operation of electric panels, sluice valve and electric panels for pumping and supply of potable water during supply hrs with ONE OPERATOR Skilled (FGM) daily in TWO SHIFTS PER DAY (Morning, Evening ) (8 Hour Per Shift) including Sundays and Holidays, complete all as specified and as directed by Engineer-in-Charge. Details of Plants:- (a) 5 HP Electric driven Pump set -01 Nos (b) 5 HP Submersible Pump Set - 01 Nos (c) 25 HP Submersible Pump Set - 01 Nos
Supply only the following materials required for day to day maintenance of water supply installations : -(a) Bleaching Powder in per kg bags for disinfection of water
(b) Ferric alum in 10 kg Blocks for sedimentation of water.Note:- The above item no 4&5 will be operated through the labours deployed under item 1&3
Servicing / over hauling of 3 Phase 415 Volts 1440 RPM upto 20/7.5/5 HP capacity induction motor installed at Pump houses in Baaz along with following others repairs. a) Taking out Motor from its Position by decoupling from Pump and disconnecting all cable connections b) Dismantaling of induction Motor complete part by part carefully , testing all coils , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c) Heating & varnishing to stator with super quality varnish and dried out properely with external heat as ordered & directed d) Reassembeling the motor complete with all existing serviceable parts obtained greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under relevant Item here-in after) e) Reinstall the Motor at its existing Position, couple with the Pump connecting all cable connections and testing on completion
Servicing / over hauling of Electric driven Vertical / Horizontal split casing Pump sets Installed at 3 U DET Pump House coupled with upto20/7.5/5 HP Motor along with following others repairs. a). Taking out Pump from its Position by decoupling from Motor and disconnecting all suction /delivery water connections , setting aside Pump from base plate , b).Dismantaling of Pump complete part by part carefully , degreasing bearing and display all the parts without damaging any portion for inspection of Engineer-in- Charge to ascertain the serviceability of existing parts. c). Replacement of Gasket set and gland packing rope . d). Reassembeling the Pump complete with all existing serviceable parts obtained against Item 6 &7, greasing the bearing with bearing grease , and new parts as ordered by Engineer in Charge.( New parts shall be measured and paid separately under appropraite Item here-in-after) e) Reinstall the Pump at its existing Position , couple with the Motor and connecting all suction delivery water connections and testing on completion Note for Item 6 & 7:- (i). Any Parts required for replacement shall be measured and paid seperately under appropriate item as ''Supply only'' (s) of this schedule. However labour element involved in replacement is included in unit rate quoted against this Item. (ii). Any unforeseen minor repair and minor parts that are not covered under Item No-6 & 7, but required to complete the repair work / smooth functioning of Motor / Pump shall be deemed to be included with the unit rate .Transportation of Stator / Rotor parts for machining & rewinding, shaft impeller bushing for machining , welding , turning at lathe shop at Port Blair are also deemed to be included with unit rate. iii). Rewinding of stator / rotor of motor, any machine work where involved shall be measured and paid separetely against relevant item of this schedule.
Supply only the following Items of Pumpset capacity upto 20/7.5/5 HP Motor to incorporate against each Item No-2 Schedule 'A' Part-II here-in-above (a) Gun metal Impeller for 7.5 HP
(b) Gun metal Impeller for 5 HP
(c) MS Coupling for 7.5/5 HP
(d) DE ( Driver End ) bearing as per existing size Make- SKF, NBC
(e) NDE ( Non Driver End ) as per existing size Make- SKF, NBC
(f) Bakelite Terminal connection plate with brass nuts bolts and washers
(g) Plastic Rotar Fan
(h) GI Flange 100 mm bore
(i) GI Flange 80 mm bore
(j) Pump Shaft suitable for existing pumpsets
(k) Rewinding burnt coils of Induction Motor stator cap 7.5 HP obtained here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM alongwith replacement of suitable bearings including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
(l) Rewinding burnt coils of Induction Motor stator cap 5 HP obtained here-in-above with super enamelled copper winding wire as per existing size and guage to achieve the required /specified RPM alongwith replacement of suitable bearings including taking out old unserviceable winding ,cleaning/ repairing damaged slots , complete as directed
(m) Rewinding stator of submersible motor of capacity 15 /25 HP obtained here-in-above with water proof insulated copper wire of existing guage and size to achieve the specified / required RPM including taking out old unserviceable winding , cleaning/ repairing damaged slots , complete all as specified and as directed.
(n) Rewinding stator of submersible motor of capacity 5 HP obtained here-in-above with water proof insulated copper wire of existing guage and size to achieve the specified / required RPM including taking out old unserviceable winding , cleaning/ repairing damaged slots , complete all as specified and as directed
(o) MS Channel base frame for 20/7.5 HP Pump set
(p) MS Channel base frame for 5 HP Pump set
Supply & Fix the following items under repairs complete all as specified & directed (a)DOL starter for 7.5 HP
(b)Sluice valve,PN 1.6, 100 mm size
(c)Sluice valve,PN 1.6, 80 mm size
(d) Leather gasket for Flange 100 mm bore
(e) Leather gasket for Flange 80 mm bore
(f)Single phase preventer for 20/7.5 HP Pump set
(g) PCC Foundation for 20/10 HP Pump set
(h) PCC Foundation for upto 5 HP Pump set
Scraping old paint of Electric induction Motor 20/15/7.5/5 HP Motor , NC Vertical/ Horizontall / Multi staging Pump , Suction , delivery Pipes, sluice valves , NRV Valves at INS Baaz & 3U Det Pump house,(Approx coverage area-8-10 Sqm) and Painting with one coats of red oxide paint and two coat of synthetic enameal paint of shade as directed by Engnr-in-Charge including writing Sm No. , MES No.complete as all specified and as directed
M/S Sudhir Kumar Gupta
M/S G S GREWAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .