| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹53.4 L+₹58,695.19 (1.11%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹54.5 L+₹1.6 L (3.10%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹58.0 L+₹5.1 L (9.71%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹66.3 L+₹13.4 L (25.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gyana Ranjan Mohanty L3 | M/s. P N Construction L5 | M/s.SAI SHREYASI CONSTRUCTION L4 | M/s.Bula Bilash Construction L1 | M/S JAYADEV BEHERA L2 | LAXMIDHAR ROUT L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing single under reamed bored compaction pile foundation of 300mm dia & 9m length long with reinforced cement concrete of CC (1:1.5:3) propertion using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes etc.complete by excluding GST as directed by the Engineer-in-charge.(Excluding cost of reinforcement steel and binding wire). | 36 | Each Nos | 6,500 ₹2,34,000 | 7,800 ₹2,80,800 | 7,400 ₹2,66,400 | 7,000 ₹2,52,000 | 5,909.2 ₹2,12,731.2 Lowest | 9,000 ₹3,24,000 |
| 2.00 | Cutting pile head up to cut off level including disposing of the dismantled material out of work site with supply of all materials, labour, T&P, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 36 | Each Nos | 50 ₹1,800 | 80 ₹2,880 | 30 ₹1,080 Lowest | 50 ₹1,800 | 42.5 ₹1,530 | 450 ₹16,200 |
| 3.00 | Empty boring of 450mm dia up to 15 M depth from Ground level including supply of rig, tripod & other accessories required for boring and to ascertained the soil strata up to 20M depth and submitting the report in every 1.00m the status of soil should be collected & submitted to the Office with supply of all labour, materials, safety arrangements for labours, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes etc.complete by excluding GST as direction of Engineer-in-charge.. . | 1 | Each Nos | 1,500 ₹1,500 | 1,500 ₹1,500 | 2,000 ₹2,000 | 2,000 ₹2,000 | 1,145.8 ₹1,145.8 Lowest | 9,000 ₹9,000 |
| 4.00 | Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed byEngineer-in-charge | 87 | Each Cum | 150 ₹13,050 | 200 ₹17,400 | 100 ₹8,700 Lowest | 200 ₹17,400 | 219.3 ₹19,079.1 | 306 ₹26,622 |
| 5.00 | Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge | 58 | Each Cum | 150 ₹8,700 | 140 ₹8,120 | 60 ₹3,480 Lowest | 100 ₹5,800 | 121.55 ₹7,049.9 | 72 ₹4,176 |
| 6.00 | Filling the low laying area with saline sand/dredged spoil and conveying the same by private trucks with all lead and lifts, including spreading, leveling, watering, ramming, consolidating with supply of all material, labour, transportation , T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge. (NB 10% voids will be deducted from the measured quantity) | 272.5 | Each Cum | 180 ₹49,050 | 150 ₹40,875 Lowest | 220 ₹59,950 | 210 ₹57,225 | 388.45 ₹1,05,852.62 | 333 ₹90,742.5 |
| 7.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge | 48 | Each Cum | 3,600 ₹1,72,800 Lowest | 5,000 ₹2,40,000 | 4,300 ₹2,06,400 | 4,000 ₹1,92,000 | 4,171.8 ₹2,00,246.4 | 6,300 ₹3,02,400 |
| 8.00Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge. | |||||||||
| 8.01 | For Ground Floor | 68.1 | Each Cum | 5,500 ₹3,74,550 Lowest | 6,500 ₹4,42,650 | 6,400 ₹4,35,840 | 6,000 ₹4,08,600 | 5,904.1 ₹4,02,069.21 | 6,300 ₹4,29,030 |
| 8.02 | For First Floor | 17 | Each Cum | 5,700 ₹96,900 Lowest | 7,000 ₹1,19,000 | 6,900 ₹1,17,300 | 6,500 ₹1,10,500 | 6,232.2 ₹1,05,947.4 | 6,300 ₹1,07,100 |
Tender Value
₹62.8 L
EMD Value
₹1.3 L
Closing Date
24 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE,ECM,PPA
Office of E and CM Division, Engineering Department, Paradip Port Authority, Ground Floor, Administrative Building, Mob 9937675479
Construction of New Badminton Court at Officers Club premises, Paradip Port.
2025_MoS_875914_1
CE/E and CM/Accts-01/25/506
Open Tender
Civil Works
Works
270 days
paradip
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
Yes
As per eTCN and TD
₹1.3 L
Yes
20 Oct 2025
3 Sept 2025
26 Sept 2025
3 Sept 2025
24 Sept 2025
3 Sept 2025
Amount
Providing single under reamed bored compaction pile foundation of 300mm dia & 9m length long with reinforced cement concrete of CC (1:1.5:3) propertion using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream at appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes etc.complete by excluding GST as directed by the Engineer-in-charge.(Excluding cost of reinforcement steel and binding wire).
Cutting pile head up to cut off level including disposing of the dismantled material out of work site with supply of all materials, labour, T&P, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
Empty boring of 450mm dia up to 15 M depth from Ground level including supply of rig, tripod & other accessories required for boring and to ascertained the soil strata up to 20M depth and submitting the report in every 1.00m the status of soil should be collected & submitted to the Office with supply of all labour, materials, safety arrangements for labours, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. transportation charges all taxes etc.complete by excluding GST as direction of Engineer-in-charge.. .
Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed byEngineer-in-charge
Filling in foundation and plinth with excavated all kind of soil including watering and ramming with supply of all material labour transporation , taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge
Filling the low laying area with saline sand/dredged spoil and conveying the same by private trucks with all lead and lifts, including spreading, leveling, watering, ramming, consolidating with supply of all material, labour, transportation , T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by the Engineer-in-charge. (NB 10% voids will be deducted from the measured quantity)
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge.
For Ground Floor
For First Floor
Supply Tor/TMT rebar of minimum grade of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient).
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge.
R.C.C. foundation and footing bases of columns mass concrete & pre-cast slab etc.
Beam, column, girder (GF)
Lintel (GF)
Roof slab, landing, projection Chajja upto 4.30 mtr. (GF)
Beam, column, girder (FF)
Brick work in Fly Ash Bricks of size 25cmx12cmx8cm having crushing strength not less than 75 Kg/Cm² to 99Kg/Cm² with C.M (1:6) including splay/cutting, racking out the joints curing, hoisting, staging at any height with cost and supply of all materials, labour, T&P, taxes, royalties, transportation charges, curing, testing charges etc. all complete but excluding GST as per direction of Engineer-in-charge
For F&P
For Ground Floor
For First Floor
12 MM thick Cement plaster with cement mortar (1:6) proportion, over brick work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge
For Ground Floor
For First Floor
16 MM thick Cement plaster with cement mortar (1:6) proportion, over brick work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge.
For Ground Floor
For First Floor
6 MM thick Cement plaster with cement mortar (1:4) proportion, over RCC work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc. complete but excluding GST & as per direction of Engineer-in-charge
For Ground Floor
C.C(1:2:4) of using 20 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope consolidating, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes , tollage , royalties etc all complete but excluding GST as directed by Engineer-in-charge
Providing, supplying, fitting, fixing of M.S./GI grills for windows of approved quality & design including fabrication charges, with supply of labour and material,machinery, cost of fuel, electrode, gas, consumables hire and running charges of all kind of equipments,taxes,tollages etc all complete but excluding GST as per direction of Engineer-in-charge.
Supplying,fitting fixing of GI Pipe Gate & shed of approved design with 50mm, 40mm and 25mm dia pipe of heavy duty quality of approved design & necessary fittings,clamps,locking arrangement etc.with cost of loading & un-loading, stacking, all complete including cost and supply of all materials, T&P, all taxes, transportation etc. complete excluding GST as per direction of Engineer -in- charge.
100mm dia GI pipe (Heavy Duty)
50mm dia GI pipe (Heavy Duty)
40mm dia GI pipe (Heavy Duty)
Fabrication Charges
Supplying, fitting & fixing of precoated Galvalume metal sheet or its equivalent of 1000 mm width with total coated thickness of 0.5mm. for roof approved quality, drilling hole fixing of wind tie and ridges or valley including supply of all EPDM screw, ridge pieces, eve board, wind ties, cutting the sheet to proper profile with supply of all materials, labour, transportation, loading and unloading at both ends, T&P, etc. all complete but excluding cost of GST & as per the direction of Engineer-in-charge.
Providing and applying termite treatment to soil under floors at junction of floors and walls, floor surface where construction defects are noticed, at construction joint and at expansion joint in all floor by drilling 12mm holes vertically at 300mm interval to reach the soil below and squirted chemical emulsion as approved into these hole using a hand operated pressure pump and the holes then sealed with white cement. The existing wood work in the building in contact with floor and walls which is inticted by termites willbe treated by spraying chemical emulsion at the point of contact with adjoining machinery by drilling 6mm hole at the choukaths angle about 450 at the joint of wood work including all cost of insecticide, test report of chemicals, labour, transportation with supply of all materials, labour, transportation, loading and unloading at both ends, T&P, etc. all complete but excluding cost of GST & as per the direction of Engineer-in-charge.
Providing, fitting, fixing up false ceiling of approved design and drawing in all floors with G.I section on 4 walls to be fixed by means of steel screw and PVC plug and the G.I grid 2'-00" x 2'-00" to be suspended from ceiling by using 12.5 mm thick Fire line Gypsum Board/ PVC Laminated board with suspension ceiling Grid Flat T-grid including all fitting including supply of all labour, materials, scaffolding up to any height transportation charges T&P, all taxes etc. complete by excluding GST as directed by the Engineer-in-charge. (N.B. PVC Laminated Board with suspension ceiling Grid flat T-Grid use for false ceiling work.)
Providing with fitting , fixing of klin seasoned white oak wood/Maple wood sports floor surface board finished with 21 mm thick, 60 mm to 70 mm width in random length in tongue & groove shape.The edge of board will have a finger lock groove & bottom side with air pass groove and applied with poly urithane lacquer.The under frame is made out of commercial quality fir/spruce/pinewood runners of 70 mm X 45 mm treated with antitermite solution & fixed on the bottom side with 10 mm thick air cushioning pads by stapple through the two wings at 300mm C/C. The Installation a vapour barrier of 6ml (600 Micron) thick will placed on the leveled sub-floor before laying the under frame .The runners having air cell cushioning pads will be placed on the vapour barrier in perfect level at 300mm C/C in one direction. The surface boards will be screwed to the runners through the tongue only and will lock the screwed tongue by the groove of the adjoining board. The ends of the boards will be locked by inserting the wooden fingers through the edge grooves and fixed with suitable adhesive. An expension gap of 8mm to 10mm will be left open between the wooden flooring and the surrounding tiled area /wall . The finishing-After installation the floor will be machine sanded in uniform level and finished with Polyurethene lacquer. Game line marking will be carried out in required colors before applying the finish coat. Preparation of base-The sub-floor , Troweled and finishedsmooth, leveled to a tolerance of 3mm is to be provided for installation of flooring system . The total height of the floor assembly including runners will be app.76mm and therefour the surface of the under-floor should be brought to 76mm below the level of the upper surface of the finised floor.Note-1-The timber used for Oak will be free from looseknots,bee or borerholes splits,cracks 7 fungal attack .All timber will be Klin seasonede with moisture content maxmium of 12% Warranty-The Warranty priod of work is 36Months from Complete handing over of side. During the Waranty priod/Maintenance priod the contractor has to maintain the court at his won cost if any defects found during use of the court.with supply of all mterials,labour,T&P,taxes,all transporttation charges,staging,scaffolding,curing,etc.all complete but excluding cost of GST & as per the direction of Engineer-in-charge.
Providing & laying 6.5mm.PVC/Vinyl flooring is a premium cushioned sports flooring designed keeping in mind the mordern day requirement of a floor that is heavy duty but soft enough for a comfortable and jerk free workout in a gym,sports court or aq fitness center. The high strenght wear layer takes care of the heavy loads, the "impregnated Glass Fibre Tissue" reinforcent provide a very high dimensional stability and lay flat properties to the product in any weather conditions.The densely compacted cushioned base layer absorbs the jerks and also adds to the acoustical property of the floor with supply of all materials , labour,T&P, taxes ,all transporttation chargs,staging , scaffolding,curing, ect.complete as directed by Engineer-In-Charges.(Excluding cost of GST).N.B: 1. The warranty period will be 03 years. 2. 10% amount of the above amount will be kept withheld towords perfarance warranty. 3. The withheld amout will be release after 03 years.
Line marking Total Badminton Court with supply of all materials,labour,T&P,taxes,all transporttation charges,staging,scaffolding,curing,etc.all complete but excluding cost of GST & as per the direction of Engineer-in-charge.
Supplying, fitting, fixing up AL window (sliding type) made up aluminum Section 9778 as window fram, section No. 4095, 4096 & 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber bending including locking arrangement including all fitting including supply of all labour, materials, scaffolding up to any height transportation charges T&P, all taxes etc. all complete by excluding GST as directed by the Engineer-in-charge.
Supplying, fitting & fixing of WPC door and window frames of 65mm x 100mm with density 900kg/cum as per requirment with required staging, scaffolding, including all leads & lifts, transportation charges with supply of all labour, T&P, all taxes etc. all complete by excluding GST as directed by the Engineer-in-charge.
Supplying fitting and fixing of 32mm thick WPC door/ window shutters of density 800kg/cum including cost of loading & un-loading charges, stacking at departmental stores with supply of all labour, materials like hinges, towe bolt, handle, aldrop etc. T&P, all taxes, transportation, etc. .all complete but excluding GST as per direction of Engineer-in-charge.
Supplying fitting fixing of chequred tiles as apporved premimum Quality in floors , treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including supply of all materials, labour, T&P, taxes, tollage, royalties, transportation charges, etc. complete but excluding GST asdirected by Engineer-in-charge.etc .all complete but excluding GST as per direction of Engineer-in-charge.
Dismantling brick or stone masonry in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m cleaning the debrises with supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, testing charges, tollage, royalties, etc all complete but excluding GST as directed by Engineer-in-charge
One coat Priming with water bond cement primer to the newly plaster surface of the exterior Wall or over the exisitng putty surface of the interior wall of approved make & shade manufactured by reputed manufacturer or equivalent to make an even finished surface in all heights with all scaffolding and staging charges including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Painting two coat with acrylic base plastic emulsion paint of approved quality shade including scraping, cleaning, washing the old paint with scraper filling the holes with plaster of paris preparing the surface by sand papering, applying paint uniformly including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
For Ground Floor
For First Floor
Exterior painting two coats to wall surface with acrylic based weather coat paint of approved quality & shade having resistance to Fungus, Fading, including scraping, cleaning, brushing, washing the old paint, with bio wash, removing the flakes applying uniformly two coats including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Painting two coats with approved quality & shade enamel paint on new iron work / old wood work k over one coat of red oxide primer including scraping, cleaning, the old paint surface sand papering, filling the holes with wax putty etc. all complete including supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Providing and fixing double scaffolding system ( Cup lock type) on the exterior & interior side upto seven story height made with 40 mm dia MS tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with MS tubes, challies, MS clamps and MS staircase sysytem in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. . The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made of scaffolding etc. all complete including supply of all materials, labour, T&P, all taxes, transportation charges, staging, etc.all complete but excluding GST as per direction of Engineer-in-charge.
Engagement of following machineries, including hire & running charges of machineries, fuel , lubricants , operator expenses , T & P , safety of operator, all taxes excluding GST etc.all complete as directed by the Engineer-in-charge.(N.B : No idle charges shall be paid )
Hydra
Hydraulic Excavator of 1cum bucket
Supply & Engagement of Unskilled labour for cutting the tree branches & Cleaning the area, providing all protective safety measures including T&P, safety of labours, all taxes if any excluding GST etc. all complete as per the direction of Engineer-in-charge.
M/S JAYADEV BEHERA (BID ID -3286548)
Gyana Ranjan Mohanty (BID ID -3284939)
M/s.SAI SHREYASI CONSTRUCTION (BID ID -3288159)
M/s. P N Construction (BID ID -3287203)
LAXMIDHAR ROUT (BID ID -3288145)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .