Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GAYTRI CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00 | Operation and maintenance of tube well/open well Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells. It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge. | 180 | Per tubewell per month | 4,800 ₹8,64,000 Lowest |
| 2.00 | Operation and maintenance of pump house Regular operation and maintenance of pump houses located at WSS Complex/Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Areaat supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pumpsets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | 72 | Per pump house per month | 5,000 ₹3,60,000 Lowest |
| 3.00 | Maintenance of Distribution / Rising Main Pipe Line Network : Repair & maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline / PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P, however the pipe line and jointing materials, sluice valves, etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation. | 60 | Complete Job per month | 2,280 ₹1,36,800 Lowest |
Tender Value
₹12.1 L
EMD Value
₹24,100
Closing Date
17 Jul 2025, 5:00 pmClosed
Senior Regional Manager
RIICO OFFICE ABU Road
Operation and Maintenance work of water supply scheme of various Industrial areas Abu Road
2025_RIICO_485560_1
2025-26/Abu Road/07
Open Tender
Civil Works
Percentage
365 days
RIICO Abu Road
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
RIICO
₹24,100
8 Aug 2025
7 Jul 2025
18 Jul 2025
7 Jul 2025
17 Jul 2025
7 Jul 2025
Amount
Operation and maintenance of tube well/open well Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells. It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge.
Operation and maintenance of pump house Regular operation and maintenance of pump houses located at WSS Complex/Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Areaat supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pumpsets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge.
Maintenance of Distribution / Rising Main Pipe Line Network : Repair & maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline / PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P, however the pipe line and jointing materials, sluice valves, etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .