Tender Value
Refer Docs
EMD Value
₹10,600
Closing Date
29 Sept 2026, 2:00 pm2d left
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
bay at Pallikaranai 110/33-11 KV Substation
2026_EB_704759_1
OT-30/2026-27 of SE/GCC-II/CNI
Open Tender
Civil Works
Works
120 days
Pallikaranai
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹10,600
Yes
15 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Plain cement Concrete inside the yard area at Existing old Substation and clearing the area free from debris and without hindrance to the work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. | 4.5 | M3 | - | - |
| 2 | Dismantling of Reinforced Cement Concrete inside the yard area at Existing old Substation and clearing the area free from debris and without hindrance to the work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. | 1 | M3 | - | - |
| 3 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. | 42 | M3 | - | - |
| 4 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 4 | M3 | - | - |
| 5 | Laying plain cement concrete 1:3:6 using 20mm using HBG (MB) including cost of all materials, lead, lift and labour, etc., complete and as per std.specification. | 4 | M3 | - | - |
| 6 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 30 | M3 | - | - |
| 7 | P:C:C 1:2:4 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 20 | M3 | - | - |
| 8 | R:C:C M20 using 12 to 20mm HBG metal with minimum cement content of 315kg per cum without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 6 | M3 | - | - |
| 9 | R:C:C M20 using 12 to 20mm HBG metal with minimum cement content of 315kg per cum with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 2 | M3 | - | - |
| 10 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc. complete. | 560 | Kgs | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_847128.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .