Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance R O VILLAGE NAINA NIWAS CHAKKAR SHIMLA TEHSIL AND DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹1.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.5 Cr+₹1.9 L (1.29%)Rejected-Finance | ₹1.5 Cr+₹1.9 L (1.29%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 Cr+₹3.1 L (2.04%)Rejected-Finance | ₹1.5 Cr+₹3.1 L (2.04%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.6 Cr+₹11.6 L (7.72%)Rejected-Finance GUNAI RUHA DHARGHAT KUNANA ROAD IN KM 0 00 TO 2 300 SH C O ROAD JEEPABLE STANDARD TO 5 7 MTR IN KM 0 00 TO 2 300 900MM DIA RCC HPC AT RD 1 800 UNDER MNP TENDER ID 2024 PWD 88502 1 | ₹1.6 Cr+₹11.6 L (7.72%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical VILLAGE NER PO MANJHU TEHSIL ARKI DISTT SOLAN H P | ARKI | SOLAN | HIMACHAL PRADESH | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
8 Aug 2026, 10:00 amClosed
Executive Engineer HPPWD Solan
near new bus stand Solan
C/o building portion, water supply and sanitary installation, Rain water harvesting tank, septic tank and site development etc
2026_PWD_140276_1
No. 5425-32 dated 29.07.2026
Open Tender
Civil Works
Percentage
184 days
Solan
as per SBD
13 documents required · 13 mandatory
₹5,000
₹3.5 L
12 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. All kinds of soil. disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour if required. Any loss to the public, private / property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be compensated by him in all cases including carriage of matereials within all leads and lifts and other incidentals. The rate is excluding GST, but including octroi, royality, Malkhana, toll tax, and any other taxes imposed by the Government. | 641.89 | Per Cubic Meter | - | - |
| 2 | Filling in plinth with stone filling under floors including watering ramming consolidating and dressing complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 31.04 | Per Cubic Meter | - | - |
| 3 | Filling in plinth with sand under floors including watering ramming consolidating and dressing complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 20.68 | Per Cubic Meter | - | - |
| 4Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 0.9 | Foundations, footings, bases of columns, etc. for mass concrete complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 82.41 | Per Square Meter | - | - |
| 0.0 | Suspended floors, roofs, landings, balconies and access platform complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 371.88 | Per Square Meter | - | - |
| 0.9 | Columns, Pillars, Piers, Abutments, Posts and Struts Circular complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 220.62 | Per Square Meter | - | - |
| 0.0 | Lintels, beams, plinth beams, girders, bressumers and cantilevers complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 414.33 | Per Square Meter | - | - |
| 0.0 | Edges of slabs and breaks in floors and walls Under 20 cm wide complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 174.2 | Per running meter | - | - |
| 0.9 | Cornices and mouldings etc. complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. | 19.32 | Per Square Meter | 1 | ₹19.3 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_208046.xls
BOQ • 0.50 MB
SBD.pdf
Tender Documents • 3.17 MB
corr.pdf
PDF • 0.60 MB
corr.pdf
PDF • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .