Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹3.0 L+₹5,352.48 (1.80%)Accepted-Finance | 2 | Accepted-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
16 Aug 2022, 3:15 pmClosed
EE(EandM)TYRSV
140 M.G.D. WATER TREATMENT PLANT SONIA VIHAR
Plugging the leakage from 03 Nos. expansion joints in 1900 mm dia South Delhi Rising Main emanating from Sonia Vihar WTP. (Re-Invited)
2022_DJB_227547_1
NIT No.-06(2022-23)item no.1/Re-invited
Open Tender
Repair and Maintenance Works
Works
2 days
140 M.G.D. WATER TREATMENT PLANT SONIA VIHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Delhi Jal Board
₹6,000
18 Aug 2022
8 Aug 2022
16 Aug 2022
8 Aug 2022
16 Aug 2022
8 Aug 2022
8 Aug 2022 - 16 Aug 2022
Hiring of DG set 62 KVA with consideration of 1 DG set standby with fuel and operator etc. for lightning purpose only
Supply of 50% Neoprene Rubber Ring (Hard) 22 mm dia required to make the joint as leak proof.
Supply of Gland Packing Greased & Graphite (non-metallic) style no. 101 of 25 mm dia to make the joint as leak proof.
Supply of SS Studs, Nuts, Washers (20 mm x 400 mm long) 4 Nos. Nuts + 4 Nos. washers + 1 No. Stud (16 sets x 3 Joints).
Safety precaution for safe working of men & machinery at site, as the work is to be carried out at the height (approx. 20 ft.) i/c scaffolding work for making suitable platform for smooth working, for cutting the old rusted studs and attending the leakage by tightening the studs form expansion joints and arrangements like Face Mask, Helmet, Gum Boots, Hand Gloves, Portable Ladder, First Aid Box etc. arranged by firm at site of work for safe working.
Dismantling, Grinding & fixing charges of gland plate & removing old gland and fill the joints with new gland by using men and machinery i/c lighting arrangement at site.
Charges for cutting the existing studs and replacing the same with new studs to make it leak proof as per site requirement with the help of manpower and machinery i/c transport arrangement loading unloading at site.
Testing of expansion joints by running line on full capacity and trial run of complete system after completion of work.
Phoenix Construction Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .