Loading…
Loading…
Tender Value
₹6.2 Cr
EMD Value
₹12.5 L
Closing Date
10 Jul 2026, 11:00 am
Similar tender results from the same govt authority in the past 3 years.
Hubballi DIvision-LD-MRJ (Londa-Miraj) section-Construction of RUB in lieu of LC.No.413 at Km 643/300-400 in between SUL-PCH (Suldal-Pachapur) station respectively by Air/Box pushing method (Maintenance period-12 Months)
11UBL26-27DT100626ITEM01
11UBL26-27DT100626ITEM01
Open
12 Months
Dharwad, Karnataka
₹0
₹12.5 L
15 Jun 2026
15 Jun 2026
26 Jun 2026
Item Breakup - A-SCH-A
Plate size 60cm x 60cm Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock (not requiring blasting)
Hard rock (requiring blasting)
Hard rock (blasting prohibited ) Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand (zone- cum III) : 3 graded stone aggregate 20 mm nominal size) HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
Providing and laying in position machine cum batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Wing wall and Return wall HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
Providing and casting machine batched, cum machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in- Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Providing and applying two coats of coal Sqm tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, e.g. Sqm pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required.
With two cover coats of ready-mixed paint Sqm conforming to IS:13607 with colour/shades, as decided by Engineer-in charge Note: DFT of each coat shall be 20-25 microns HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
Supplying fabricating and erecting welded MT and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only.
Supplying of stone boulders weighing not cum less than 35 kg each at specified bridge locations.
Providing and laying of filter media cum consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines.
Providing cast in situ bridge number Each plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts.
Supplying, spreading and filling coarse cum sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant.
Providing Boulder Backing behind wing cum wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
Dewatering of natural or accumulated HP Hour water from any location. Payment to be done for Horse power of pump multiplied by pumping hours.
Boxing and profiling of ballast as per TRM procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS- GE-1) with latest correction slips at R a i l w a y depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
When distance of nearest quarry is more cum than 40 km and up to 50 km First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
For PSC Sleeper Density of 1660 Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
For PSC Sleeper Density of 1660 Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in- charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
60 Kg - 110/90 UTS - On Running Line HUBLI DIVISION-ENGG/SOUTH WESTERN RLY Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
On Running Line
Dismantling existing lifting barrier along Set with winch assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set. Painting speed breakers with paint of approved quality & colour over the Bituminous/ Concrete surface near approaches to level crossing.
With Hot melt thermoplastic road marking Sqm paint
Manufacturing sleepers/blocks required for matting and bearing as per approved design for use below and above CC Crib for insertion of Temporary Girder etc.. Note: The item is for one time use and released wooden sleepers/blocks shall be the property of the Contractor. Erection or removal of temporary Engineering Indicator Board or any other board at specified locations without causing infringement to track etc. complete and as directed.
Supply, filling and stacking of sand bags Each layer by layer filled with Railway Sand/railway quarry dust in Contractor's empty polythene cement bags of 50 kg bags with all contractors labour, tools, plants, lead, lift etc., including stitching the same with machine using polythene thread complete as directed by Engineer- in charge at site. Total 19542840.62
Item Breakup - B-SCH-B
"Sealing t h e joints of Pre cast RCC box Running units after placing it in to the correct Metre position, with cement mortar 1 : 2 Mix with Contractor's Cement of Approved quality including labours ,tool & plants , loading , unloading ,lead & lift etc complete as per the direction of the Engineer - in - charge. Refer : Approved vide #Note03 of Eoffice File No.93433"
"Supplying , providing, laying & fixing Sqm 5mm thick concrete canvas (flexible concrete impregnated fabric that hardens when hydrated to form a thin, durable water proof and fire resistance concrete layer within 24 hours) in limited height subway and other required work of Hubballi division, South Western Railway. N o t e : 1) Contractor shall submit all relevant test certificates of the materials. 2) The adopted rates are deemed to include to all taxes (Direct or indirect), royalty, octoral etc. of Central Govt./State Govt. /Local body etc. and all the incidental charges. 3) Mass or unset concrete canvas should be 7Kg/M2. 4) The rate includees all the cost of lead, lift, loading, unloading, all type of transportation, ascent, descent, crossing of railway track, road, nullah wherever required, all contractor's labour, material to complete in all respect. Refer : Approved vide #Note03 of Eoffice File No.93433"
"Carrying out design for PSC or RCC slab Per Unit 118000.00 /RCC Box Sub structure, super structure to suit for latest loading standard through a qualified and registered designer/ consultant (Structural Engineer) based on the approved GAD/ TADs by structural drawing in the format acceptable to the Railways administration, resubmitting with necessary changes as directed by the railways [if any], duly signed by the consultant. The cost includes submission of design booklets in 3 copies along with soft copies, tracing copies with 3 blue prints etc and as directed by engineer in charge. [Rates are inclusive of taxes] "
"Preparation Preparation of completion plan and submission of the same to Railways with bridges completion certificate duly obtaining signature of SSE/Works or SSE/P.Way and ADEN incharge of the work. The drawing to be submitted in original tracing paper or Tracing film with one soft copy. Refer : Approved vide #Note03 of Eoffice File No.93433" Total 190026.00
Item Breakup - C-SCH-C
Casting and installation of single/twin RCC cum box of all sizes with or without common web section after supporting the track on temporary girders including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as per approved drawings/scheme, in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement f o r all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental w o r k s to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. N o t e : (1) The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. (2) The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms.
Above 5 km up to 10 km
Above 10 km up to 15 km
Above 15 km up to 20 km
Above 20 km up to 25 km
Above 25 km up to 30 km
Above 30 km up to 35 km
Above 35 km up to 40 km
Above 40 km up to 60 km Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
Above 60 km up to 80 km
Above 80 km up to 100 km
Above 100 km up to 150 km
Above 150 km up to 200 km
Above 200 km HUBLI DIVISION-ENGG/SOUTH WESTERN RLY Launching in position, by any approved method, pre-fabricated Steel Girders, precast PSC girders/slabs, casted at casting bed developed at site, to correct alignment and level over the bed block / pedestal with all required arrangements, complete in all respect.
Structural steel plate girders Delaunching of all types of Steel girders, PSC girders/Slabs and stacking away from river stream or passage as directed by Engineer in charge with all labour, tools and plant, equipment etc., complete.
Structural steel plate girders. Total 2886311.42
Item Breakup - D-SCH-D
Item Breakup - A1-SCH-A1
Ordinary Portland Cement approved brands/makes Total 8828676.82
Item Breakup - A2-SCH-A2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
LC413DivapprovedGAD.pdf
ATTACHMENT
TenderDocument6.1newasperACS.pdf Tender Document
ATTACHMENT
IRGCCApril2022newasperACS.pdf
ATTACHMENT
JPOCirculardated22.05.2024.pdf
ATTACHMENT
NEFTFORM.pdf
ATTACHMENT
AnnexureVGCCcorrespondence.pdf
ATTACHMENT
ACSItoXI_compressed.pdf
ATTACHMENT
BGverificationletter_compressed.pdf
ATTACHMENT
TenderDocument6.1newasperACS.pdf
ATTACHMENT
Download all tender documents and submit your bid