Tender Value
₹51.5 L
EMD Value
₹51,546
Closing Date
9 Oct 2026, 5:00 pm
Superintending Engineer
O/o the S.E, RandB Division, Nayagada
Construction of Meeting Hall and Conference Hall at District Employment Exchange Office in the District of Nayagarh Buildings.
2026_EICCL_141621_1
SE-13/2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
Nayagarh
2 documents required · 2 mandatory
₹10,000
₹51,546
Yes
24 Sept 2026
24 Sept 2026
12 Oct 2026
24 Sept 2026
9 Oct 2026
24 Sept 2026
24 Sept 2026 - 9 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick masonry in cement mortar 3m. Height including stacking the useful materials for reuse and removing the debris within 50m. Lead. | 4.27 | sqm | 1,646.62 | ₹7,031.07 |
| 2 | Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect for the work as directed by the Engineer-in-charge. | 6 | cum | 282.88 | ₹1,697.28 |
| 3 | Dismantling and removing lime concrete flooring 7.5 cm to 10 cm thick including stacking the useful materials for reuse and removing the debris within 50m lead. | 50.62 | cum | 162.11 | ₹8,206.01 |
| 4 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect and as per direction of Engineer-in-Charge. | 6.08 | cum | 541.31 | ₹3,291.16 |
| 5 | Cement Concrete (1:3:6) using 4cm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete. | 2.51 | cum | 5,830.79 | ₹14,635.28 |
| 6 | R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement.RCC work of M-25 grade Column Base Fotting | 1.2 | cum | 6,680.56 | ₹8,016.67 |
| 7 | RCC work of M-25 grade concrete in Column Super Structure First Floor | 5.43 | cum | 18,139.71 | ₹98,498.63 |
| 8 | RCC work of M-25 grade concrete in Lintel Band First Floor | 2.35 | cum | 16,136.63 | ₹37,921.08 |
| 9 | RCC work of M-25 grade concrete in Floor Beam First Floor | 11.89 | cum | 18,139.71 | ₹2,15,681.15 |
| 10 | RCC work of M-25 grade concrete in Chajja Head Room | 4.6 | sqm | 1,433.3 | ₹6,593.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 1.98 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_610764.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .