| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.6 LAdmitted-Finance | ₹29.6 L | L1 | Admitted-Finance |
| 2 | L2₹30.2 LAdmitted-Finance 1 82 ANNA NAGAR 5TH STREET DHARMAPURI MAIN ROAD KOTTAMETTUPATTI VILLAGE OMALUR 636455 | OMALUR | SALEM | TAMIL NADU | 636455 | ₹30.2 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical 8 171 VANDIDHATAM KAMALAPURAM POST OMALUR TK SALEM 636309 | SALEM | SALEM | TAMIL NADU | 636309 | - | - | Rejected-Technical Contractor Withdrawed the E Tender Application |
| 4 | Rejected-Technical | - | - | Rejected-Technical Contractor Withdrawed the E Tender Application |
| Sl No | Description | Qty | Unit | M.VIJAYAKUMAR L1 | Pownambal Construction L2 |
|---|---|---|---|---|---|
| 1.00Strengthening The Road From NH7 to Chinnasamy Thottam KM 0/0 - 0/765 H/O Vellakkalpatti | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 367.2 | Sqm | 6.3 ₹2,313.36 | 6.49 ₹2,383.13 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | 1,020 | Sqm | 23.3 ₹23,766 | 23.83 ₹24,306.60 |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 137.7 | Cum | 341 ₹46,955.70 | 347.89 ₹47,904.45 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 459 | Cum | 2,715 ₹12.5 L | 2,769.39 ₹12.7 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 2,868.75 | sqm | 86.5 ₹2.5 L | 88.28 ₹2.5 L |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 2,868.75 | sqm | 20.2 ₹57,948.75 | 20.67 ₹59,297.06 |
| 8.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 2,868.75 | sqm | 308.4 ₹8.8 L | 314.65 ₹9.0 L |
| 9.00 | Provision for Hecta Metre Stone - Nos | 3 | N | 574 ₹1,722 | 586.14 ₹1,758.42 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 4,52,117 ₹4.5 L | 4,61,287 ₹4.6 L |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO (VP)
BDO Office, Omalur
Salem District - Omalur Block - Road from NH7 to Chinnasamy Thottam H/O Vellakkalpatti Panchayat Omalur Block in Salem District Peri Urban Panchayat - 2025-26
2026_RDTN_661192_2
Roc.No.1094/2025/T2
Open Tender
Civil Works
120 days
BDO Office, Omalur
As per tender document
3 documents required · 3 mandatory
₹0
₹30,000
4 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Strengthening The Road From NH7 to Chinnasamy Thottam KM 0/0 - 0/765 H/O Vellakkalpatti
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for Hecta Metre Stone - Nos
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
02.pdf
Tender Documents • 1.29 MB
BOQ_793657.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid