Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹11.1 L (9.59%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.3 Cr+₹11.1 L (9.59%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹61.5 L (53.3%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹1.8 Cr+₹61.5 L (53.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 Cr+₹66.1 L (57.3%)Admitted-Finance | ₹1.8 Cr+₹66.1 L (57.3%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹83.2 L (72.1%)Admitted-Finance KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | ₹2.0 Cr+₹83.2 L (72.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C.GOVINDAN L5 | ASAITHAMBI.M L4 | H.Venkateswaran L1 | MSS CONTRACTORS L6 | JD ENTERPRISES L3 | K DHINAKARAN L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Fabrication and supply of GI tower extension and special cross arm as per standard specification including cost of materials, labour, lead, galvanising, fabrication, lift, etc., complete and as dircted by the Department Engineer at site. | 2 | MT | 83,000 ₹1,66,000 | 90,000 ₹1,80,000 | 75,000 ₹1,50,000 | 8,000 ₹16,000 Lowest | 15,000 ₹30,000 | 1,00,000 ₹2,00,000 |
| 2.00 | Supply of Hot dipped galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification of various size including cost of materials, labour, lead, galvanising, fabrication, lift, etc., complete and as dircted by the Department Engineer at site. | 0.3 | MT | 1,05,000 ₹31,500 | 90,000 ₹27,000 Lowest | 90,000 ₹27,000 Lowest | 1,00,000 ₹30,000 | 1,00,000 ₹30,000 | 1,00,000 ₹30,000 |
| 3.00 | Supplying and fixing of Number Plate 200mmx200mm including cost of all necessary tools, labour, lead and lift etc., complete. | 67 | Nos | 250 ₹16,750 | 250 ₹16,750 | 500 ₹33,500 | 150 ₹10,050 Lowest | 500 ₹33,500 | 200 ₹13,400 |
| 4.00 | Supplying and fixing of Phase Board containing 3 nos phase plates including cost of all necessary tools, labour, lead and lift etc., complete. with colour sequence | 67 | Nos | 250 ₹16,750 | 500 ₹33,500 | 500 ₹33,500 | 150 ₹10,050 Lowest | 500 ₹33,500 | 200 ₹13,400 |
| 5.00 | Supplying and fixing of Danger Board 500mm x 500mm including cost of all necessary tools, labour, lead and lift etc., complete. | 67 | Nos | 350 ₹23,450 | 250 ₹16,750 | 500 ₹33,500 | 800 ₹53,600 | 500 ₹33,500 | 200 ₹13,400 Lowest |
| 6.00 | Supplying and fixing of Name Board 900mm x 450mm including cost of all necessary tools, labour, lead and lift etc., complete. | 67 | Nos | 900 ₹60,300 | 1,500 ₹1,00,500 | 500 ₹33,500 | 1,800 ₹1,20,600 | 500 ₹33,500 | 200 ₹13,400 Lowest |
| 7.00 | Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer | 67 | Loc | 1,500 ₹1,00,500 | 1,500 ₹1,00,500 | 1,500 ₹1,00,500 | 1,000 ₹67,000 Lowest | 1,200 ₹80,400 | 1,000 ₹67,000 Lowest |
| 8.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B | 2,028 | M3 | 200 ₹4,05,600 | 300 ₹6,08,400 | 100 ₹2,02,800 Lowest | 150 ₹3,04,200 | 100 ₹2,02,800 Lowest | 300 ₹6,08,400 |
| 9.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Soft disintegrated rock not requirng blasting | 145 | M3 | 250 ₹36,250 | 400 ₹58,000 | 100 ₹14,500 | 150 ₹21,750 | 1 ₹145 Lowest | 300 ₹43,500 |
| 10.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Medium rock and dense medium rock not requiring blasting | 145 | M3 | 250 ₹36,250 | 500 ₹72,500 | 200 ₹29,000 | 200 ₹29,000 | 1 ₹145 Lowest | 300 ₹43,500 |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
12 Oct 2020, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru Vi Ka Indl Estate, Guindy, Chennai 32
Stub setting, Concreting, Erection, Stringing of ACSR Panther Conductor and GI earth wire for Conversion of existing 110 KV SC Singarapet - Arani feeder I on SC tower with Leopard conductor by 110 KV DC line on DC towers with ACSR panther conductor
2020_EB_180289_1
TP1-034/2020-21
Open Tender
Civil Works - Others
Works
120 days
Singarapet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.0 L
Yes
24 Nov 2020
18 Sept 2020
13 Oct 2020
18 Sept 2020
12 Oct 2020
18 Sept 2020
Amount
Fabrication and supply of GI tower extension and special cross arm as per standard specification including cost of materials, labour, lead, galvanising, fabrication, lift, etc., complete and as dircted by the Department Engineer at site.
Supply of Hot dipped galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification of various size including cost of materials, labour, lead, galvanising, fabrication, lift, etc., complete and as dircted by the Department Engineer at site.
Supplying and fixing of Number Plate 200mmx200mm including cost of all necessary tools, labour, lead and lift etc., complete.
Supplying and fixing of Phase Board containing 3 nos phase plates including cost of all necessary tools, labour, lead and lift etc., complete. with colour sequence
Supplying and fixing of Danger Board 500mm x 500mm including cost of all necessary tools, labour, lead and lift etc., complete.
Supplying and fixing of Name Board 900mm x 450mm including cost of all necessary tools, labour, lead and lift etc., complete.
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Soft disintegrated rock not requirng blasting
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Medium rock and dense medium rock not requiring blasting
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Removal of hard rock by wedging and chiselling and trimming to proper shape
Sinking well rings in loose soils,black cotton soil,sandy loam and ordinary soil including the cost of materials, labour etc., complete 0-2 m First depth
Sinking well rings in loose soils,black cotton soil,sandy loam and ordinary soil including the cost of materials, labour etc., complete 2-4 m Second depth
Supplying and placing of Pre cast RCC well rings having inner dia 1.80 m, thickness 50mm and 0.30m depth including cost of 8mm RTS rods -3 nos longitudinally and 20cm c/c vertically including cost of all materials, dewatering, lead and lift, etc., complete.
Supplying and placing of Pre cast RCC well rings having inner dia 2.40 m, thickness 75mm and 0.30m depth including cost of 8mm RTS rods -3 nos longitudinally and 20cm c/c vertically including cost of all materials, dewatering , lead and lift, etc., complete.
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete.
Sand filling including cost of sand ,filling charges , labour for watering and consolidation leads and lift etc.complete.
Providing PCC 1:3:6 using 20 mm HBG metal for padding without form work including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete as per the direction of the Engineer at site. Without form box.
Providing PCC 1:2:4 using 20 mm HBG metal including cost of all materials, labour, curing,frustrum form box, mixture machine, lead, lift, etc., complete. Without form box.
Providing PCC 1:2:4 using 20 mm HBG metal including cost of all materials, labour, curing,frustrum form box, mixture machine, lead, lift, etc., complete. With form box
Providing RCC 1:1.5:3 using 20 mm HBG metal including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete without form work for foundation raft
Providing RCC 1:1.5:3 using 20 mm HBG metal including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete with form work for wall
Providing steel reinforcement and placing in position including cost of reinforcement, binding wire, including cost of all materials, labours, lead and lift, etc., complete.
Back filling of pits by the excavated earth including cost of all materials, labour charge, lead, lift, etc., complete.
Spreading of surplus earth around the area including cost of allmaterials, labour charge, lead, lift, etc., complete.
Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete.
Labour Charges for cutting and removing small Palmira / Coconut stumps and other trees in all respects
Arranging road block for stringing of power conductor and earth wire across major road/ Railway crossing including cost of sign boards and all incidental charges etc., complete.
Supply and fixing Anti climbing device by providng and tying Barbed wire alround tower with necessary angles etc, lead, lift etc complete as instructed by department engineer at site.
Providing special type earthing in Railway crossing tower with 2 Nos 50mm dia GI "C" class pipe as per standard specification, approved drawing and as directed by the Engineer incharge including lowering the earth wire from earth peak to the ground and connecting to the earth pipe, connecting the tower legs and earth pipes by 7/3.55 mm GI earth wire with suitable clamps and providing 2 Nos 150mm dia. bore for a depth of 3.6m for each tower location and placing of GI pipes 50mm dia C class 3m long into the bore, filling with Charcoal and salt in the annular space, providing 2 Nos RCC rings 60cm dia, 50mm tk for each earth pipe and anti climbing arrangements using GI barbed wire and evice including cost of all materials ,lead,lift etc., complete.
Providing pipe type earthing including cost of 40 mm GI earth pipe B class of length 3 m,earth strip, cutting of earth work to the required length and connecting to the earth pipe and stub including cost of all materials ,lead,lift etc., complete.
PCC 1:2:4 using 12 to 20mm HBG metal for muffing and coping including cost of all materials labour, form work, all lead lift etc., complete.
Providing plastering C:M 1 : 3 using 12 mm thick including cost of all materials labour lead, lift, etc., complete in all respect
Transporting & erection of tower parts including sorting out of tower parts at store and site, tightening, punching of bolts and nuts transport charges to each and every location, final checking, cost of T&Ps labour, lead, lift etc, complete., The defects pointed out during final checking for handing over and commissioning the line must be attended by the contractor without any extra cost to the board (Under Normal Condition)
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete
Transporting and paying out of 6 Nos. panther conductor with fittings including cost of loading and unloading, transporting, sorting out of drums at store and at site accoring to drum schedule, providing tressels, paying out, etc., complete
Labour charges for stringing of 6 Nos. Panther conductor with fittings including rough sagging, tensioning using tensioner/puller as per specfication, trussels cost of T&P lead and lift etc., complete. For Continuous Span
Labour charges for stringing of 6 Nos. Panther conductor with fittings including rough sagging, tensioning using tensioner/puller as per specfication, trussels cost of T&P lead and lift etc., complete. For Single Span
Transporting & Hoisting of 14 Nos ordinary 120KN disc insulators with tension fittings including T&P all labour, lead, lifts etc., complete
Transporting & Hoisting of 2 x 14 Nos ordinary 120KN disc insulators with double tension fittings including T&P all labour, lead, lifts etc., complete
Transporting & Hoisting of 13 Nos ordinary 90KN disc insulators with tension fittings including T&P all labour, lead, lifts etc., complete
Labour charges for transporting, Paying out, jointing, rough sagging, tensioning of 1 No. 7/3.55 mm HTGS GI earth wire including cost of tensioning to correct sag and fixing to towers as per specification also, hoisting of fittings, providing jumpering in tension points and transport of all materials from stores to site, all labour, leads and lifts etc., complete. For Continuous Span
Labour charges for transporting, Paying out, jointing, rough sagging, tensioning of 1 No. 7/3.55 mm HTGS GI earth wire including cost of tensioning to correct sag and fixing to towers as per specification also, hoisting of fittings, providing jumpering in tension points and transport of all materials from stores to site, all labour, leads and lifts etc., complete. For Single Span
Providing temporary stay (3 Nos) during rough sagging and tensioning including necessary excavation for burying RSJ cut bits/ concrete block with pipe turn buckle/ concreting the anchor in slushy area fixing stay wire and turn buckle, refilling and removal of stays after tensioning including cost of all materials, labour, leads, lifts, etc., complete.
Arranging and availing shutdown on HT/LT, dismantling and restringing of HT/LT lines to the original position after stringing operation including all labour charges , T&Ps, etc., complete.
Providing bamboo/Casuarina trustles during conductor and earth wire stringing work wherever necessary and as directed by the Board Engineer for telecom lines roads, railway rorssingetc., including cost of all materials transport, T&Ps labour leads and lifts etc., completeand dismantling after completion of stringing works in the crossing as above. Special type Trustles for Highway Crossings
Providing bamboo/Casuarina trustles during conductor and earth wire stringing work wherever necessary and as directed by the Board Engineer for telecom lines roads, railway rorssingetc., including cost of all materials transport, T&Ps labour leads and lifts etc., completeand dismantling after completion of stringing works in the crossing as above. Bamboo/Casuarina Trustles
Supply and operating 15KVA Open Generator with 5 Flood lamps 500w focusing tension towers in the NH crossings and special type trussles scaffolded for NH crossing during LC work after sunset and before sunrise including lead, lift, transporting of D.G.set, diesel and required cable arrangements etc., complete as directed by the department Engineer at site.
Cleaning the tower legs and Painting tower leg using best quality anti corrosive paint-black color-1m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. complete.
Labour charges for dismantling the existing 110 KV lines consisting of various types of towers including cost of loading and unloading with necessary tools and plants with safety norms . Dismantling Tower
Labour charges for lowering of Leopard conductor including cost of all materials, labour, lead, lift, complete, etc., and devoluted to stores as directed by the Dept. Engineer at site.
Labour charges for lowering of GI Earth wire including cost of all materials, labour, lead, lift, complete, etc., and devoluted to stores as directed by the Dept. Engineer at site.
Labour charges for lowering of 120KN insulators including cost of all materials, labour, lead, lift, complete, etc., and devoluted to stores as directed by the Dept. Engineer at site.
Labour charges for lowering of 90KN insulators including cost of all materials, labour, lead, lift, complete, etc., and devoluted to stores as directed by the Dept. Engineer at site.
Less Credit Taking the towers with bolt and nuts as is where is condition including cost of transport, lead, lift, etc., complete as directed by the department engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K DHINAKARAN
JD ENTERPRISES
ASAITHAMBI.M
C.GOVINDAN
MSS CONTRACTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_216057.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .