Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 69 A KACHERI VALASU VELLAKOIL 638111 | TIRUPPUR | TAMIL NADU | 638111 | ₹4.9 L | L1 | Accepted-AOC LOWEST QUOTED AMOUNT ACCEPTED |
| 2 | L2₹5.8 LRejected-Finance 638 111 | TIRUPPUR | TAMIL NADU | 638111 | ₹5.8 L | L2 | Rejected-Finance ABOVE THE ESTIMATE RATE |
| Sl No | Description | Qty | Unit | Arthy M H2 | SUBBIAH NAICKER SUBBIAH H1 |
|---|---|---|---|---|---|
| 1.00Air Compressor Motor | |||||
| 2.00 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP | 1 | Each | 5,932.2 ₹5,932.2 Lowest | 6,000 ₹6,000 |
| 3.00 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP | 1 | Each | 7,203.4 ₹7,203.4 Lowest | 7,250 ₹7,250 |
| 4.00 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP | 1 | Each | 2,245.8 ₹2,245.8 Lowest | 2,250 ₹2,250 |
| 5.00 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP | 1 | Each | 3,008.5 ₹3,008.5 Lowest | 3,010 ₹3,010 |
| 6.00 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP | 1 | Each | 1,483.1 ₹1,483.1 Lowest | 1,490 ₹1,490 |
| 7.00 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP | 1 | Each | 1,483.1 ₹1,483.1 Lowest | 1,490 ₹1,490 |
| 8.00 | Labour charges for Cylinder Boring work 5 HP | 1 | Each | 847.5 ₹847.5 Lowest | 850 ₹850 |
| 9.00 | Labour charges for Cylinder Boring work 7.5 HP | 1 | Each | 1,271.2 ₹1,271.2 Lowest | 1,300 ₹1,300 |
| 10.00 | Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete.., | 2 | Each | 1,271.2 ₹2,542.4 Lowest | 1,300 ₹2,600 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
7 Jul 2026, 3:00 pmClosed
The Municipal Commissioner
The Municipal Commissioner, Vellakovil Municipality, Uppupalayam Road, Vellakovil.
Motor maintenance 11 TO 21
2026_MAWS_683214_1
1174/2026/E1
Open Tender
Maintenance Works
Works
120 days
Vellakovil
Motor maintenance
2 documents required · 2 mandatory
₹0
₹5,000
20 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
30 Jun 2026 - 7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Air Compressor Motor | |||||
| 2 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 5 HP | 1 | Each | - | - |
| 3 | Motor Rewinding charges including cost of necessary winding materials and all labour charges etc., complete including cost of copper coil (Less the cost of old burnt copper coil)(Less the Cost of Old Materials) 7.5 HP | 1 | Each | - | - |
| 4 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 5 HP | 1 | Each | - | - |
| 5 | Labour charges for the Rectification of Loose connect in the Motor winding and wiring varnishing the winding including cost of materials 7.5 HP | 1 | Each | - | - |
| 6 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 5 HP | 1 | Each | - | - |
| 7 | Labour charges for Removing Air Pipe & water line rectifying the Leakage of blockingd in the pipe line and Re-erection of 7.5 HP | 1 | Each | - | - |
| 8 | Labour charges for Cylinder Boring work 5 HP | 1 | Each | - | - |
| 9 | Labour charges for Cylinder Boring work 7.5 HP | 1 | Each | - | - |
| 10 | Labour Charge for Dismandling of Air Compressor with Motor, Removing of Damaged parts and new sparts fixing including conveyance lathe works and all labour charges etc complete.., | 2 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_821278.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_821278.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].