Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC C141 SUN CITY SECTOR 35 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹5.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹5.6 Cr+₹62.2 L (12.4%)Rejected-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹5.6 Cr+₹62.2 L (12.4%) | L2 | Rejected-AOC Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹9.9 L
Closing Date
8 Feb 2022, 3:00 pmClosed
Rohit
PHED No 2 Rohtak
Design, construction, testing commissioning of 1.00 MLD capacity water treatment plant, 1 raw water pumping station comprising sump well, pump chamber, boundary wall, laying the rising main balance pipe lines in village, repairing the existing st
2022_HRY_206496_1
Mokhra Kher, Prov Functional Household Tap Connect
Open Tender
Civil Works
Works
540 days
Rohtak
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹9.9 L
24 Feb 2022
3 Feb 2022
8 Feb 2022
3 Feb 2022
8 Feb 2022
3 Feb 2022
Amount
WATER TREATMENT PLANT (WTP ) Design, construction, testing & commissioning of 1.00 MLD capacity Water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT & Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVC/VAG) .
RAW WATER PUMPING MACHINERY Supplying, erection, testing and commissioning of Horizontal motor pumping set for raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHPMake: KSB, CRI, Kirlosker, Crompton Greeve, Lubi) RAW WATER PUMPING STATION3900 LPM X 20 M. Head
WATER WORKS 800 LPM X 15 M. Head
PANEL BOARD FOR MOTORS: Supply, erection, testing & commissioning of wall mounted electrical L.T. Panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of suitable size deep having follwing items For Clear Water Pumping Sets of 30 BHP. = 2 No. a) Main switch suitable amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No.d) SPP = 1 No. of approved make e) Motor starter Star delta for 3900LMPx 20 Mtr. = 2 No (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each)
For Clear Water Pumping Sets of 5 BHP. = 2 No. a) Main switch suitable amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter Star delta for 800 LMPx 15 Mtr. = 2 No (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make.g) Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each)
For Clear Water Pumping Sets of 30 BHP. = 2 No. a) Main switch suitable amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter Star delta for 2000 LMPx 40 Mtr. = 2 No (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make.g) Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each)
Supply, erection, testing & commissioning of IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc.10mm2 3core
25mm2 3core
Supply & Fixing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 100 mm i/d
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects.
Operation & Maintenance Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. (Will be charged to A/mtc estimate)."Defect liability period (Operation only)
Operation & maintenance during 1st year
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
Lalit Kumar(GSTN-06ALGPB5309Q1ZY)
suresh kumar(GSTN-06AIPPK4333B1ZJ)
suresh kumar
suresh kumar
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .