Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹1.8 L+₹34,025.30 (22.7%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
25 Nov 2022, 11:05 amClosed
EE SDW IX
RITHALA STP SEC-11 ROHINI DELHI 110085
Repairing renovation of 4.4 MGD Pump set no. 1 Beacon weir Make installed at Rohini Sector- 17 SPS Re-invite
2022_DJB_232267_2
NIT No. 13 (2022-23)
Open Tender
Miscellaneous Works
Works
30 days
RITHALA STP SEC-11 ROHINI DELHI
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
As per NIT
₹3,800
2 Jan 2023
16 Nov 2022
25 Nov 2022
16 Nov 2022
25 Nov 2022
16 Nov 2022
Decoupling and disconnection of motor from pump dismantling of pump by opening of fasteners & cutting the old rusted fasteners with the help of gas cutter and required tool tackles at the site and taking out the pump from its casing.
Isolation the suction & delivery system by closing of valves & fixing dead flange on the pump casing to stop the leakage.
Dismantling of complete rotating assembly by taking out impeller, sleeve , shaft and allied connected mechanical with the help of tool and manual labour.
Replacement of SS Shaft sleeve as required in the pump
Supply of pump Bearing No. N-216 & 6416 Make FAG/SKF DJB approve Make
Supply of CI Gland Plate
Gasket for Complete Pump ( Casing & Housing )
Supply of New SS Impeller Nut
Repairing of pump shaft by remetalling machining and polishing for making bearing seat as per size of Bearing.
Repairing of SS Impeller by remetalling from damage portions and grinding, machining polishing from wedges to proper balance for smooth operation.
Providing of fasteners including studs, graphite packing and other requisite cleaning, fabricating and packing material required for complete assembling of pump this job includes fixing of all the material into the pump after replacing the same.
Reinstallation of back pull out assembly in the pump casing at site after removing the dead flange from suction and delivery pipe line, fixing the coupling tightening the complete body of pump and making realignment with motor
Testing of pump On Load at site.
Raj Engineering Co.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .