Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹77.7 LAccepted-Finance | ₹77.7 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹91.2 LRejected-Finance | ₹91.2 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹93.8 LRejected-Finance | ₹93.8 L | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹93.9 LRejected-Finance | ₹93.9 L | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹93.9 LRejected-Finance 49 | UNNAO | UTTAR PRADESH | 209801 | ₹93.9 L | L-5 | Rejected-Finance L-5 |
Tender Value
₹95.3 L
EMD Value
₹6.8 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE, Unnao Circle, Unnao
SE, Unnao Circle, Unnao
Construction of Tirva to Jahagirabad via Akbrapur link road
2026_CEUCZ_1121808_4
1002MT/1MT/E-Tender/UC/2025-26 date27-02-2026
Open Tender
Civil Works
180 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹6.8 L
Yes
8 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (Including labour Cess & Excluding GST)
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Providing, laying and spreading Material on a prepared sub base,cement@4% by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to for
Construction of shoulder with approved material obtaind from borrow pits with all lift and lead transportion to site spreading grading to required slop and compacting to meet requirement of table 300.1and 300.2 as per technical specification clause 301.5
Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared ba
Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .
Const of 1000mm hume pipe culvert
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets1000.00mm(Including Labour Cess And Excluding G.S.T.)
Road Furniture km stone bord
Maintenance of constructed road for next five year after the actual date of complition. The Contractor shall be paid total maintenance cost as Rs. 8072533 for five year in the form of installment as given below. Payment shall be done as per PWD Specification (Rates are including labour Cess but Exculiding GST) 1 st to 2nd Year after the Actual Date of Completion Maintenece @ 0.75% of Rs.
(ii) IInd year to IIIrd year 1.5% of Rs.
(iii) IIIrd year to IVth year 2.25% of Rs.
(iv) IVth year to Vth year 3% of Rs.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2087640.pdf
techsummary_2087640.pdf
finance_2087640.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
Tendernotice_2.pdf
PDF • 0.31 MB
BOQ_2087640.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid