| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 LAccepted-AOC | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as L-3 | |
| 3 | Rejected-Technical CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹2.1 L
EMD Value
₹2,600
Closing Date
12 Jan 2024, 5:00 pmClosed
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 04 nos Retaining wall to 5R development section VI bottom seam at Damini UG mine of Sohagpur Area
2023_SECL_297363_1
SECL/SGP/ET/23-24/644 dt30/12/2023
Open Tender
Civil Works - Others
Item Rate
30 days
Damini UG Mine
As per NIT
8 documents required · 8 mandatory
₹2,600
22 Feb 2024
1 Jan 2024
15 Jan 2024
1 Jan 2024
12 Jan 2024
2 Jan 2024
1 Jan 2024 - 8 Jan 2024
Amount
Item Description/ Heading Part (A) labour Cost
Cleaning/ removal of malma/ muck from UG sump and stacking within 50m distance 4.0X4.30X4.00X0.20=13.76M3
Groove cutting in coal/shale - In side – 4X2 (1.50m.x0.30m.X0.50 m.)= 1.80m3 In floor – 4X (5.30m.x0.30m.X0.30 m.)= 1.91m3 Total 3.71M3
Reinforced cement concrete (1:2:4) in Wall /roof ceiling of air crossing/stopping (any thickness)in u/g(Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials). Wall – 4X 5.30m. X 1.80.m X 0.30m.= 11.45m3
Centring, shuttering, finishing and reinforce- Ment including cutting, bending, placing in position and binding and strutting, propping etc complete. 4X 2.00m. X 4.30m. X 1.50m.= 51.60 m2
Loading of all kind building materials in to tub at Inc. mouth- a) Stone chips - 10.19 m³ b) Sand - 5.10 m³ c) Cement - 2.55 m³ d) Steel rod(12) -0.06 m³ TOTAL = 17.90 m³
Transportation of all kind of building material from surface to u/g through haulages with tram ing and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface
Unloading of all kind building materials in to tub at destination
Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75m
Pushing of tub for every 30m after free pushing of first 30m upto 480m 480-30=450/30=15X4.33=64.95/M3
Part-B Material Cost supply and stacking of building materials Cement
Stone chips(20mm)
Steel rod( 12mm)
Total impact of GST for the purpose of CTC
RAVI KUMAR JAISWAL
AMIT KUMAR JAISWAL
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .