| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC Lowest Amount Quoted by S.RAVICHANDRAN |
| 2 | L2₹16.1 LRejected-AOC | ₹16.1 L | L2 | Rejected-AOC Reject |
| 3 | L3₹16.3 LRejected-AOC | ₹16.3 L | L3 | Rejected-AOC Reject |
| 4 | L4₹17.4 LRejected-AOC | ₹17.4 L | L4 | Rejected-AOC Reject |
| 5 | L5₹18.2 LRejected-AOC | ₹18.2 L | L5 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | MAHASAKTHI CONSTRUCTION L5 | I.Vetharathinam L2 | P. PasupathiBalamurugan L4 | S Ravichandran L1 | Saravanan Thirumalai L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 234 | Sqm | 7 ₹1,638 | 6 ₹1,404 | 7 ₹1,638 | 4.47 ₹1,045.98 | 5 ₹1,170 |
| 2.00 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER | 146.25 | Cum | 4,000 ₹5.8 L | 3,900 ₹5.7 L | 4,310 ₹6.3 L | 4,007.6 ₹5.9 L | 4,554 ₹6.7 L |
| 3.00 | Providing and laying tack coat over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification. | 1,950 | Sqm | 75 ₹1.5 L | 67 ₹1.3 L | 70 ₹1.4 L | 46.44 ₹90,558 | 46 ₹89,700 |
| 4.00 | Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete. | 1,950 | Sqm | 400 ₹7.8 L | 325 ₹6.3 L | 345 ₹6.7 L | 292.4 ₹5.7 L | 305 ₹5.9 L |
| 5.00 | Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400. | 19.5 | Cum | 1,500 ₹29,250 | 1,380 ₹26,910 | 1,555 ₹30,322.50 | 1,384.6 ₹26,999.70 | 1,525 ₹29,737.50 |
| 6.00 | Provision for Name board | 1 | each | 2,000 ₹2,000 | 1,500 ₹1,500 | 4,500 ₹4,500 | 1,000 ₹1,000 | 2,500 ₹2,500 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity | 1 | GST Amount (in Rupees) | 2,77,945 ₹2.8 L | 2,45,626 ₹2.5 L | 2,65,689 ₹2.7 L | 2,29,661 ₹2.3 L | 2,49,098 ₹2.5 L |
Tender Value
₹17.7 L
EMD Value
₹17,700
Closing Date
2 Mar 2026, 11:00 amClosed
Block Development officer (vp), vedaranyam
Block Development officer (vp), vedaranyam
Strengthening of road at Voimedu Udaiyathevankadu Agni Veeran Kovil salai Km 0/0-0/650
2026_RDTN_666704_1
122/2026/B1
Open Tender
Civil Works
Vedaranyam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,700
12 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
25 Feb 2026 - 2 Mar 2026
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying tack coat over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_800905.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid