| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.8 L+₹5,879.94 (0.67%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹9.0 L+₹23,006.46 (2.62%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹9.0 L+₹25,665 (2.93%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹9.1 L
EMD Value
₹9,100
Closing Date
13 Feb 2024, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER VP KAVERIPAKKAM
BLOCK DEVELOPMENT OFFICE KAVERIPAKKAM
Construction of Threashing Floor at Sirukarumbur Colony H/O Sirukarumbur Panchayat
2024_RDTN_421092_1
A4/2835/2022
Open Tender
Civil Works
Item Wise
180 days
BLOCK DEVELOPMENT OFFICE KAVERIPAKKAM
Construction of Threashing Floor at Sirukarumbur Colony H/O Sirukarumbur Panchayat
3 documents required · 3 mandatory
₹0
₹9,100
Yes
BLOCK DEVELOPMENT OFFICE KAVERIPAKKAM
21 Mar 2024
8 Feb 2024
13 Feb 2024
8 Feb 2024
13 Feb 2024
8 Feb 2024
8 Feb 2024
Amount
1.Construction of Threashing Floor at Sirukarumbur Colony H/O Sirukarumbur Panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Brick work in CM 1:5mix using country bricks ground molded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5,12mm thick. over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats using ready mixed Plastic Emulsion paint inlcuding priming coat and cost and conveyance of paint and all labour charges etc complete
Provision For Bitumenpad
Provision For Naneboard charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.Raghavan Contractor
M VELU
Gomathi G
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .