Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.9 LAccepted-AOC OFFICE NO 2 GROUND FLOOR CO OP HSG SOCIETY SBS ROAD COLABA MARKET MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L1 | Accepted-AOC Being lwest | |
| 2 | L2₹98.6 L+₹18.4 L (23.0%)Rejected-Finance FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L2 | Rejected-Finance Being other than Lowest | |
| 3 | L3₹1.2 Cr+₹36.6 L (45.7%)Rejected-Finance 15 281 CHHILI INT ROAD GHATIYA AZAM KHAN AGRA UTTAR PRADESH 282003 | AGRA | UTTAR PRADESH | 282003 | L3 | Rejected-Finance Being other than Lowest | |
| 4 | L4₹1.2 Cr+₹36.9 L (46.0%)Rejected-Finance | L4 | Rejected-Finance Being other than Lowest | |
| 5 | L5₹1.2 Cr+₹42.7 L (53.2%)Rejected-Finance 302 SIDDHIVINAYAK APPT A WING MUMBAI K K MARG JACOB CIRCLE MUMBAI CITY MAHARASHTRA 400 011 | MUMBAI | MAHARASHTRA | 400011 | L5 | Rejected-Finance Being other than Lowest |
Tender Value
Refer Docs
Closing Date
16 Apr 2021, 6:00 pmClosed
CWE NW MUMBAI
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar ColabaMumbai 05
SPECIAL REPAIR TO SHAFT AREA PIPE LINE R15 R17 R18 AND R21 BIDGS AND SPECIAL REPAIRS FOR REPLACEEMENT OF DAMAGED MS GRILLS IN BUILDING R 14 AND R 16 AT RS COLABA UNDER GE (NW) NAVY NAGAR COLABA MUMBAI
2021_MES_430029_1
8207/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
Item Rate
270 days
GE (NW) NAVY NAGAR
Class B and above
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
Exempted
27 May 2021
12 Mar 2021
19 Apr 2021
12 Mar 2021
16 Apr 2021
2 Apr 2021
12 Mar 2021 - 2 Apr 2021
Amount
Taking down CI /PVC soil/waste/rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fixing CI soil/waste/vent pipe in any length with or without ears 100 mm bore (sand cast) with cement joints fixed to walls complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fix CI soil/waste/vent pipe in any length with ears 75 mm bore (sand cast) with cement joints fixed to walls complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fixing PVC (SWR) pipes 160mm bore single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fix PVC (SWR) bends/shoes 160mm bore any radius complete all as specified and directed
Height upto and including 4th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fixing CI bends (any radius) for soil/waste pipes 100 mm bore diminishing pieces or tapers on walls making good the surfaces complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fixing CI branch pieces single 'Y' (equal or unequal) ordinary or inverted (spigot or socket type) with parallel branches for 100mm bore pipe with ovel access door and making good the surfaces complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply & fix CI branch pieces single 'T' (equal or unequal) ordinary or inverted (spigot or socket type) with parallel branches for 75 mm bore pipe with ovel access door complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Demolition of cement concrete of any description and in any position not otherwise specifically provided for including tiling complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Material & labour for cement concrete (1:7:12) F2 type (using 40mm graded stone coarse aggregate) in sunken floor all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Material & labour for non skid ceramic tiles coloured of size 300 x 300 x 6 to 7mm thick laid in floors over cement mortar, screeding, set and jointed in white cement mixed with pigment including bedding layer of mortar 20mm thick in CM (1:4) for laying floor finishes all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Material & labour for Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment over backing layer of 10mm thick in CM (1:4) all as specified and as directed.
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Material & labour for CI Nahani trap dia of outlet 75mm fixed in repairs including jointing to waste pipe in runlead complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Material & labour for vitreous china squatting pan Orissa pattern of size 580 x 440 mm white with back inlet and integral footrest and anti syphonnage pipe including 'P' or 'S' trap and provn of lime concrete in repairs complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Taking down cement plaster, any description on brick or stone walls, etc including racking out joints hacking for key scrubbing down with water etc complete all as specified and directed
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Supply only water proofing compound of approved make
Material & labour for preparation of walls & applying two coats of chemical waterproofing treatment (601 raincoat of pidilite or Dr Fixit of equivalent) as approved by GE of approved colour on wall such as Make:- flexcoat, Beckcoat Exshield etc or equivalent over a coat of primeseal/primers complete as per manufactures Instructions, complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to, upto and including 8th floor.
Height from 9th floor to, upto and including 12th floor.
Height from 13th floor to, up to and including 14th floor.
Treatment of sunken floor slab comprises of the following specifications and all as specified directed. (i)Material & labour for cleaning of the sunken /lowered portion of the RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chiesel out any mortar sticking to the surface and brooming / washing completely. 40 mm avg thick PCC (1:2:4) type B-0 using 12.5 mm graded aggregate as in padding concrete to achieve proper slope including 50 mm dia 350 mm long medium grade GI pipe spouts with wire guage on inside mouth to be fixed (ii) Rendering of uneven surfaces with 6 mm thick CM (1:4) mixed with integral WPC @3% of weight of cement consumed. Fillup it with water and check dampness and seepage. where dampness and seepage noticed nozzles shall be fixed and grouting carried out (iii) All junctions points of side walls where CI/GI pipes are passing through shall be sealed with epoxy putty
(iv) After drying putty wash the slab and sides of sunken portion with water and make it clean and clear (v) Material & labour for applying two coat of polymer modified cementious water proofing coating as per manufactures instructions to bottom and vertical sides up to finished floor level +100 mm height. The thickness of two layer shall be 1 mm. When the second layer is still sticky , coarse sand spray shall be carried out or vertical and bottom surface of the sunken portion all as specified and directed. (vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20 mm thick cement mortar 1:4 mixed with integral WPC 3 % of cement consumes as per manufacures specification including rounding of corners and junctions sloping towards spout ( WPC shall be measured and paid seperately (vii) All pipes laid in sunken portion shall be covered with 50 mm thick PCC (1:3:6) all around after painting with anticorrossive black japan paint (viii) Height up to and including 14 th floor Note :-Test the water proofed area (ponding test) by filling water for atleast 72 hours and tested for leakage seepage and to the entire satisfaction of GE. Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. the treatment shall be carried out by authorised applicators of chemicals.
Chipping ,removing carefully concrete work by low impact hammer ,breaker without damaging the structure & cleaning and disposal of debris out side the premises etc. complete as directed by Engr-in-Charge. Hard concrete should not be removed by force complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for applying the rust remover alkaline in natrue having specific gravity of 1.1 kg/ltr to the existing/additional rebars including wire brushing manually or by mechanical tools, after cleaning the disturbed surface etc. complete by draining water. Rust remover shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite) Note :- Measurement shall be taken on the basis of area of concrete exposed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for applying two coats of anti-rust protective coating in the form of Acrylic Polymer with a minimum solid content to 40% solids mixed with cement in 1:1.5 proportion (1 part polymer and 1.5 parts cement) on rebars after cleaning of rust scales as per manufacturer's instruction. Anti-rust protective shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite) NOTE: Measurement shall be taken as the basis of area of concrete exposed
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for TMT bars 10mm dia. and over, Cut to length, bent to shape required including cranking, spirally and binding with MS wire (annealed) not less than 0.9mm dia.by placing in position new reinforcement bars including tack welding to existing reinforcement bars all complete as specified and as directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for Providing bonding coat of SBR polymer over the exposed steel/welded mesh/concrete in ratio 1:1 to 1:1.5 of polymer and cement complete all as specified and directed by Engr-in-Charge. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite)
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for repairing the damaged concrete portion by SBR Polymer with a minimum solid content to 40% cement mortar in proportion 1:5:15 i.e. (1 part SBR polymer : 5 parts OPC cement and 15 parts of graded quartz aggregate (sand) )upto 25mm thickness as directed by the manufacturer's instruction including necessary curing etc. complete all as specified & as directed. (Make of SBR polymer : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite).
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for casting and repairing of excessively damaged members with micro concrete at all levels with all leads and lift as directed including mixing, laying, levelling, finishing including curing complete. Grade of Micro-concrete to be M-40 and same shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite).
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Use waste of form work to pour the concrete/micro-concrete using waterproofing film coated ply wood complete all as specified and as directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM (1:6) and 5 mm thick setting coat in CM (1:4) mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net etc all complete as directed by Engr-in-Charge. (Note :- WPC shall be measured and paid separately)
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for plastering in CM (1:3), 5mm thick finished even and smooth for ceiling complete all as specified & directed by Engr-in-Charge.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for preparing newly plastered or unplastered surfaces and applying two coats of acrylic based exterior paint over a coat of primer & bio wash on walls incl necessary scaffolding complete.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for preparation of old decorated surfaces of wall including washing and applying two coat of Acrylic emulsion paint exterior grade (100% Acrylic) over one coat of primer incl necessary scaffolding, Safety net etc at any height all complete as directed by Engr-in-Charge.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
All as per item 30 above but on ceiling.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Dismantling of MS grill of any description and position etc complete all as specified and directed by Engineer-inCharge
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for fabrication of framed work as MS grills. with ends of bars shouldered and or riveted or forged into spikes, framed guard bars barred iron doors, ladders framed balusters, walk ways, railings, framework of water tanks and similar work conform to Fe 290 Gde-E-165 & fixed in position as directed etc complete.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Writing letter or figures n exc 30 cm high (Block,Roman, Italic or Indian) per cm height of letters complete all as specified and directed by Engineer-inCharge
Demolition of RCC chajjas (Reinforcement cut as reqd to facilitate to demolition) etc with diamond cutter. complete all as specified and directed by Engineer-in-Charge
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Supply and Fixing in position Pre painted galvalume sheet aluminium zinc coating GI based corrugated steel sheet 0.50mm thick of any colour as in roof covering/claddig to wall, fixed with self tapping screws, having tensile strength of 550 Mpa yield strength and zinc (galvanised) + Aluminium combined coating of 150 GSM/PM2(AZ-150) of 50mm TCT having top colour coat of regular modified polyester/silicon modified polyester/HDEP polyester of 18 to 20 micron and back coat of 5 to 7 micron Epoxy primer fixes. RMR 1040 profile width 1125mm complete all as specified and as directed by Engr-In -charge.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for preparation of new steel surfaces exc 10 cm width or girth and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and as directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
S&F MS angle framed for brackets cut to shape drilled and counter sunk for screws incl bending welding angles as necessary confirming to Fe-410-0 or Fe-310-0 brackets shall be fixed with 10mm dia 150 mm long ( 04 Nos in each brackets) dash through fastners in concrete or brick work all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
S&F MS rolled section as in purlin cut to shape including welding to angle iron bracket as necessary cleats complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
S&F MS Wind ties, bands, clamps, plain angle cleats for securing purlins, plate washers and similar small articles conforming to Fe-290 Gde-E-165 complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
S & F 10mm dia 100 mm long dash through fastners bolts in concrete and brick work complete all as specified and as directed by Engr-In -charge.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for preparation of new steel surfaces n.exc 10 cm width or girth and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and as directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Cutting grooves 75mm wide & 65 mm deep in brick wall / RCC surfaces at any location shaping horizontal face with mechanical cutter and grooves filled with PCC( 1:2:4) type B-0 (using 12.4mm graded stone aggregate) mixed with chemical compound mixed with proportion 200 ml per 50 Kgs cement as per manufacturers instruction all as specified & directed. Make: SUPER LATEX OR DR FIXIT OF PIDILITE INDUSTRIES LTD or SBR LATEX of STP LTD
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Material & Labour for filleting in any position and to any shape of section area n. exc 25 sqcm in cement sand mortar 1:4 including all mitres, stops etc complete all as specified and directed.
Height upto and including 4th floor.
Height from 5th floor to upto and including 8th floor.
Height from 9th floor to upto and including 12th floor.
Height from 13th floor to up to and including 14th floor.
Removing demolished material outside MOD land to a distance exc 5 Km but n.exc 15 Km and depositing where directed (Note:- For item No 1 to 45, Work to be carried out at G+14 bldg including top roof and lift machine room parapet walls with scaffolding & safety measures in repairs and in patches).
RAMESH ENTERPRISES
Garima Construction Co
ORIENT ELECTRIC CO
the bhimani group of companies
SHREE JAGDISH FURNITURE CO.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .