Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 241 2ND MAIN STREET LAKSHMIPURAM PALANI DINDIGUL DISTRICT 624 601 | DINDIGUL | TAMIL NADU | 624601 | Admitted-Finance |
Tender Value
₹56.4 L
EMD Value
₹57,000
Closing Date
7 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer ( VP )
Panchayat Union , Guziliamparai
Guziliamparai Block AGAMT 2024-25 TN-05-03
2024_RDTN_438318_1
3657/2023/A10
Open Tender
Civil Works
Item Wise
Panchayat Union, Guziliamparai
Guziliamparai Block AGAMT 2024-25 TN-05-03
4 documents required · 4 mandatory
₹0
₹57,000
Yes
7 Mar 2024
4 Mar 2024
7 Mar 2024
4 Mar 2024
7 Mar 2024
4 Mar 2024
Amount
Part 1 : Deepeening and Strengthening of Chinnakulam Pond at Pream nagar ( Baby pond + Bathing Ghatt ) H/O Koombur Estimate Amount Rs.9.45 lakhs
Bund Strengthening
Clearing the Scrubed jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete
a) Bund Strengthening ( With Compaction )
Silt area ( Without Compaction )
Baby pond ( Without Compaction )
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete
Channel area
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} ( for Earthwork 12% )
Construction of Bathing Ghatt
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} ( for Civil work 18% )
Part 2 : Providing Paver block pavement at Vairampalayam South street H/O Koombur Estimate Amount Rs.3.45 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Part 3 : Providing Paver block pavement at Chinnaputhur Golden nagar North street H/O Koombur Estimate Amount Rs.5.29 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Part 4 : Construction of 3.00 m span RCC Slab Culvert at Chinnaputhur Golden nagar near Sekar house H/O Koombur Estimate Amount Rs.9.00 lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherev
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
( i ) Below sill level
( ii ) Above sill level
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Part 5 : Providing Paver block pavement at Chettiyapatty puthur AD Colony East street H/O Koombur Estimate Amount Rs.3.72 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Part 6 : Providing Paver block pavement at Chettiyapatty puthur AD Colony West street H/O Koombur Estimate Amount Rs.3.31 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Paving interlocking Paver Blocks of 60mm thick including all cost and conveyance of all materials and all albour charges etc complete
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Part 7 : Construction of Anganwadi building at Koombur in Koombur panchayat Estimate Amount Rs.16.55 lakhs
Earthwork excavation and depositing on bank with initial lead and lift in hard gravelly soil for foundation etc. complete.
Supplying and Filling foundation and basement with good M Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting shuttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations
( i ) Below Basement
( ii ) Above Basement
( iii ) Sunshade
Supplying, fabricating and placing in position mild steel or ribbed to steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete.
RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete 25mm thickness
Paving the floor with Vertified tiles of any colour and any size laid in CM 1:2 20mm thick and pointing with white cement 0.4kg/sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joint neatly complying with std specification.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complete
Weathering course with best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime (no M.Sand to be listed) over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid over into a single layer and cons
Finishing the top of the roof with one course of Machine PressedTiles of size 20 cm x 2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three M.Sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement us
Plastering with CM 1:3 mix 10mm thick including cost and conveyance of all materials to site and labour charges etc. complete.
Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials to site and labour charges etc. complete.
Colour washing two coats with approved quality of oil bound distemper with good colour pigments with primer including all charges etc.
Painting two coats with best quality of Ready mixed Plastic emulison of Ist class paint With appd. colour approved by the departmental officers including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. Steel Door (0.90 x 2.40m)
Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. Steel Door (0.75 x 1.50m)
Supply and fixing of mild Steel Doors of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. Steel Door (1.10 x 2.40m)
Supply and fixing of mild Steel Windows of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. Steel window (1.20 x 1.60m)
Supply and fixing of mild Steel Ventilator of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. Steel ventilator (0.60 x 0.45m)
Supply and fixing of mild Steel Ventilator of any size with standard specification including cost and conveyance of all materials and all labour charges etc complete. Steel ventilator (0.90 x 0.45m)
Painting two coats over new iron work using synthetic enamel paint without primer including cost and conveyace of all materials to site etc. complete.
Cost, supply and fixing of Cuddappah slab 38/40mm thick for Shelf, Cupboard and Kitchen top including cost and conveyance of all materials and labour charges etc., complete
Providing and fixing of PVC rain water down fall pipe 110mm dia with necessary T W Clamps, Plug, Shoes, bend, Screws, nails etc., complete
Electrification arrangements
Wiring with 2 x 1.5 Sq.mm PVC uncheated SC cu.cable of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with T.W. Switch box in flush with wall, covered with nylon sheet of 3mm thick with painting of suitable colour for open Light point & Fan Point SD 18
Supply and Fixing of Ceiling fan(crompton make) including cost and conveyance of all materials and labour cherges etc complete.Ceiling Fan SD 110
Supply and fixing of 4'4" Flu fitting complete with copper choke and condensor (Data - B) SD 88
Supply and fixing of 4'18" W LED Tube light SOR - M 1211
Supply and Fixing of AC Exhaust fan 300mm sweep complete without provision of hole in the wall Exhaust Fan 300mm SD 114
Wiring with 2 x 2.5 Sq.mm PVC uncheated SC alu.cable of 650V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150 x 100 x 113mm T.W. switch box in flush with wall, covered with nylon sheet of 3mm thick 5 Amps 3 pin non - inte Plug point. SD 38
Supply and run of 2 of 6 sq. mm ( 84/0.30) polythene insulated and PVC unsheeted S.C. Alu cable of 1100 V on 7/20 Gi bearer wire for Service Connection Main - SD.62
Supply and fixing of 16 Amps DPIC switch of 500V grade with Fuse and Nutral on suitable T.W. board with painting of suitable colour with PWD Earthing (SD No.125)
Supply and fixing of Main Service board. etc complete. (SD No.145)
Paid for EB Deposit amount
Supplying & Fixing in position of Indian type Baby Water closet including cost and conveyace of all materials to site etc. complete.
Baby frindly IWC
Supplying & Fixing in position of White hand wash basin of good quality including cost and conveyance of all etc., complete
Construction of Rain Water Harvesting Including all cost and conveyance of allmaterials and all labour charges etc complete
Provision for Cartoon paintings Including all cost and conveyance of allmaterials and all labour charges etc complete
Provision for Handrails Including all cost and conveyance of allmaterials and all labour charges etc complete
Supply and fixing of 500 lit HDPE Tank
Provision for Pipe line and Sanitary arrangements Including all cost and conveyance of allmaterials and all labour charges etc complete
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Part 8 : Improvements to the Samathuva Buriyal ground at Chinnaputhur in Koombur panchayat ( Cremation shed + CC Road - 20m + Compound wall - 15m + Water supply arrangements ) Estimate Amount Rs.5.64 lakhs
Construction of Cremation shed
Earthwork excavation for foundation in all clauses of soils and subsoils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, struting and bailing out water wherever necessary and refilling the sides of foundation.
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifications and as directed.
Brickwork in C.M. 1:5 mix using country bricks ground moulded of size 23x11x7 cu.cm including cost and conveyance of all materials and all labor charges etc.,
Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Supplying, fabricating and placing of mild steel or ribbed for steel rods and all RCC works as per the design given including cost steel and binding wire in all floors etc., & convayence of steel as per std. specification and directed.
RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.
Finishing the exposed surface of RCC items of work such as slabs, beams, sunshed faica, canopy slab, staircase waist and landing slab, etc., with cement morter 1:3 mix to 10mm thick including cost and convayense of all materials and labour charges etc..,
Plastering with C.M. 1:5 mix using 12mm thick including curing, cost and conveyance of all materials and all labor charges etc., complete
Providing Granolithic pattern floor finish with c.c 1:2:4 mix using 10 to 12mm ISS metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Distembering two coats with best quality of distember and the colour approved by the departmental officers including cost & conveyance of all materials to site and all labour charges etc., complete.
Colour washing with Exterier Emulsion Painting two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Towards the cost of Chimny arrangements including cost & conveyance of all materials to site and all labour charges etc., complete.
Construction of Compound wall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and errection of centering and shuttering charges for all RCC works including all cost and conceyance of all matrials and all labour charges etc complete
Supply and fabrication of steel rod in placing of proper position including all cost and conceyance of all matrials and all labour charges etc complete
RCC 1:1 1/2:3 mix using 20mm HBG ISS metal including all cost and conceyance of all matrials and all labour charges etc complete
Brick work in CM 1:5 mix using country bricksl including all cost and conveyance of all materials and all labour charges as per standard specification.
Plastering in CM 1:5 mix to 12mm thick including all cost and conveyance of all materials and all labour charges etc complete
Painting two coats with extwrior emulsion paint using good quality and approved colour of paint including all cost and conveyance of all materials and all labour charges etc complete
Construction of CC Road
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and errection of centering and shuttering charges for all PCC Works including all cost and conveyance of all materials and all labour charges etc complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal including all cost and conveyance of all materials and all labour charges etc complete
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal including all cost and conveyance of all materials and all labour charges etc complete
Provision for bitumenpad charges including all cost and conveyance of all materials and all labour charges etc complete
Water supply arrangements
63mm PVC pipe 4KSC
63mm PVC MTA
63mm PVC Bend
Solvent oil
1000 lit HDPE tank
Labour charges for Construction of 1000 lit HDPE tank pedastal in CM 1:5 mix using RR masonry work including all cost and conveyance of all materials and all labour charges etc complete
Earth work excavation hard stiff clay and hard rock earth soils including all cost and conveyance of all materials and all labour charges etc complete
Pipe line
Supply and fixing of Citizen / Information board including all cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
P VIJAYAKUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .