| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹17.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.3 LAdmitted-Fee/PreQual/Technical/Finance PERAMBALUR | TAMIL NADU | 621101 | ₹17.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹17.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SN ENTERPRISES L1 | Panneerselvam L2 | P S CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling existing RCC in Drain including all the labour charges for dismantling by manual/by using deploying machineries and clearing debris from work site etc complete | 19 | M3 | 4,610 ₹87,590 | 5,000 ₹95,000 | 1,000 ₹19,000 Lowest |
| 2.00 | Dismantling existing PCC in Drain including all the labour charges for dismantling by manual/by using deploying machineries and clearing debris from work site etc complete | 57 | M3 | 520 ₹29,640 Lowest | 530 ₹30,210 | 700 ₹39,900 |
| 3.00 | Sand and silt under water (SS-20B)Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in slush and silt under water up to 0.75m depth requiring the aid of basket and vessels (SS 20B)as per Rates of works C.Earth work | 71 | M3 | 199 ₹14,129 Lowest | 200 ₹14,200 | 250 ₹17,750 |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) including all the cost and conveyance of materials to work site and including all labour charges for filling in layers not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 24 | M3 | 1,741 ₹41,784 Lowest | 1,750 ₹42,000 | 2,500 ₹60,000 |
| 5.00 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidental charges such as water providing etc., complete as per standard specification | 24 | M3 | 5,595 ₹1,34,280 Lowest | 5,595 ₹1,34,280 Lowest | 6,000 ₹1,44,000 |
| 6.00Centering charges for plain cement concrete works including all the hire and labour chrages form works and including removal of all the labour charges for removal of form works etc complete asper standard specification | ||||||
| 6.01 | Wall | 423 | m2 | 665 ₹2,81,295 Lowest | 669 ₹2,82,987 | 850 ₹3,59,550 |
| 6.02 | Slab | 82 | m2 | 1,010 ₹82,820 | 1,010 ₹82,820 | 950 ₹77,900 Lowest |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 3,315 | Kg | 96 ₹3,18,240 | 96 ₹3,18,240 | 90 ₹2,98,350 Lowest |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 29 | M3 | 6,775 ₹1,96,475 Lowest | 6,778 ₹1,96,562 | 7,000 ₹2,03,000 |
Tender Value
₹20.8 L
EMD Value
₹20,800
Closing Date
19 Aug 2026, 3:00 pmClosed
The Commissioner, Tambaram City Municipal Corporat
1, Muthuranga Mudali St, West Tambaram, Tambaram, Chennai, Tambaram, Tamil Nadu 600045
Construction of Storm Water Drain in kivraj flats 2nd street And Strom water drain with cover slab in kulakarai 4th cross street at ward no 30 Zone No.01 TCMC
2026_DMA_690732_3
1932/2026/E1
Open Tender
Civil Works
Item Rate
zone 1
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,800
Yes
19 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling existing RCC in Drain including all the labour charges for dismantling by manual/by using deploying machineries and clearing debris from work site etc complete | 19 | M3 | - | - |
| 2 | Dismantling existing PCC in Drain including all the labour charges for dismantling by manual/by using deploying machineries and clearing debris from work site etc complete | 57 | M3 | - | - |
| 3 | Sand and silt under water (SS-20B)Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in slush and silt under water up to 0.75m depth requiring the aid of basket and vessels (SS 20B)as per Rates of works C.Earth work | 71 | M3 | - | - |
| 4 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) including all the cost and conveyance of materials to work site and including all labour charges for filling in layers not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 24 | M3 | - | - |
| 5 | Plain Cement Concrete 1:5:10 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidental charges such as water providing etc., complete as per standard specification | 24 | M3 | - | - |
| 6Centering charges for plain cement concrete works including all the hire and labour chrages form works and including removal of all the labour charges for removal of form works etc complete asper standard specification | |||||
| 6.01 | Wall | 423 | m2 | - | - |
| 6.02 | Slab | 82 | m2 | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 3,315 | Kg | - | - |
| 8 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 29 | M3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_830480.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].