Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC AOC UPLOADED | |
| 2 | L2₹5.5 L+₹78,790.74 (16.7%)Rejected-Finance KASHYABPUR MAHISHREKHA P S ULUBERIA HOWRAH 711303 | HOWRAH | HOWRAH | WEST BENGAL | 711303 | L2 | Rejected-Finance L-2 BIDDER. | |
| 3 | L3₹5.6 L+₹91,987.59 (19.5%)Rejected-Finance VILL BAIGACHI JAGADISHPUR HOWRAH 711114 | HOWRAH | HOWRAH | WEST BENGAL | 711114 | L3 | Rejected-Finance L-3 BIDDER. | |
| 4 | L4₹5.8 L+₹1.0 L (22.0%)Rejected-Finance NABGHAPA NH 6 ANKURHATI 711322 | ANKURHATI | HOWRAH | WEST BENGAL | 711322 | L4 | Rejected-Finance L-4 BIDDER | |
| 5 | L5₹5.8 L+₹1.1 L (23.3%)Rejected-Finance | L5 | Rejected-Finance L-5 BIDDER |
Tender Value
₹5.9 L
EMD Value
₹11,869
Closing Date
22 May 2025, 4:00 pmClosed
Regional Manager, Howrah Region WBSEDCL
13 Netaji Subhash Road Howrah Pin 711101
DRAWL OF 33 KV 3C400 SQ MM XLPE CABLE BY MANUAL LAYING ASND MICROTUNNELLING THROUGH 200 MM DIA HDPE PIPE FOR BULK POWER SUPPLY TO M/S ELLENBARIE INDUSTRIAL GASES LTD AT MOUJA AMRABERIA MAHISHREKHA UNDER ULUBERIA DIVISION
2025_WBSED_840132_1
RM/HRO/E/e-T/25-26/02 dated 29.04.2025
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Amraberia
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,869
12 Dec 2025
5 May 2025
26 May 2025
7 May 2025
22 May 2025
9 May 2025
Amount
Survey of 33 KV Cable route as per instruction of site Engineer and submission of route survey drawing (in two copies) inscribing different land marks
Micro-tunnelling work with laying of 200 mm did HDPE pipe (PE-100, PN-10) as per instruction of site Engineer and as per site condition for laying of UG cable including supply of HDPE pipe as per IS:4984-1995 including prepartion and submission of drawing for such cable laying
Laying and dressing of 33 KV XLPE 3 X 400 Sq. MM UG as per instruction of site engineer
Making and fixing of end termination joint indoor/outdoor type for 33 KV 3 CX400 Sq. MM cable without jointing materials as per instruction of site engineer
Supply and fixing of 150 MM dia GI Pipe (medium) for cable riser arrangement as per instruction of site engineer
Fixing of 33 KV Isolator (Rocking/CR Type) as per instruction of site engineer
Excavation of soil for making of trial hole (Minim Size 1.1X0.5x1.2 M depth) as per instruction of the site engineer including bakfilling the excavated soil)
Excavation of soil for formation of cable trenches & re-instatement of cable trenches with the excavated soil as per direction of site engineer.
Excavation of soil by metalled road /cement concrete/brick soiling act & re-instatement of the same as per direction of site engineer.
Excavation of soil for soil along with existing cable route for formation of cable trenches along with the up-rooting of protective covers in the existing trench & reinstatement of same cable trenches with the excavated soil after erection of protective covers.
Excavation of soil by cutting of metalled road / cement concrete /brick massonry /chequeredplate/paver block ect. For formation of cable trench along with uproorting of protective cover in the existing trench A reinstatement of the same cable trench after erection protective covers.
APEX ENGINEERING & PROJECT CO (BID ID -6434475)
PURNIMA ELECTRICAL (BID ID -6414994)
THE MARKET ELECTRICAL ENGINEERING WORKS (BID ID -6434545)
SREEMA ENTERPRISES (BID ID -6414334)
STATE ELECTRIC CO (BID ID -6434509)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .