| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 LAccepted-AOC ATUL MARKET MALDA | MALDA | MALDA | WEST BENGAL | ₹32.0 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹32.3 L+₹32,946.57 (1.03%)Rejected-Finance | ₹32.3 L+₹32,946.57 (1.03%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹32.6 L+₹64,933.52 (2.03%)Rejected-Finance | ₹32.6 L+₹64,933.52 (2.03%) | L3 | Rejected-Finance 3rd Lowest |
Tender Value
₹32.0 L
EMD Value
₹63,974
Closing Date
6 Mar 2026, 4:00 pmClosed
THE CHAIRMAN ENGLISHBAZAR MUNICIPALITY,MALDA.
N.S ROAD,MALDA.
RENOVATION OF DRAIN FROM B.R.D.C MORE TO OLD PWD GUEST HOUSE BY THE SIDE OF STATE HIGHWAY (OLD NH-34) IN WARD NO-6 UNDER ENGLISHBAZAR MUNICIPALITY, MALDA.
2026_MAD_1011161_1
MAD/ULB/EBM/PW-2/12/25-26
Open Tender
CIVIL WORKS
Percentage
90 days
ENGLISHBAZAR MUNICIPALITY, MALDA.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹63,974
Yes
23 Mar 2026
20 Feb 2026
9 Mar 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof.
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof.(a) upto 150 mm. thick
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete (a) Depth of excavation not exceeding 1,500 mm.
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring..
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Ordinery Cement Concrete M-15 (Mix 1:2:4) with graded stone chips (20 mm. down) excluding shuttering and renforcement if any, in ground floor as per relevant IS codes. A) Pakur Variety
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (iii) RajMahal
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) PWD(WB), S.O.R. Volume - I : Building Works w.e.f. 01/11/2017, Item No.-36, Page No. - 42 (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) (f) 25 mm to 30 mm shuttering without staging in foundation
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. JSW-JSPL-SHYAM-SRMB-BMASL
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar 15 mm thick plaster
Neat cement punning about 1.5 mm thick in wall dado, window, silks, floor, drain etc.
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge PWD(WB), S.O.R. Volume - I : Building Works w.e.f. 01/11/2017, Item No.-13, Page No. - 12
Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineer- in-Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside)
Add 18 % G.S.T on total value of item no 1 to 16
Add 1% C.E.S.S on total value of item no 1 to 17
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_2482865.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .