Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹3.7 L
Closing Date
5 Aug 2026, 6:00 pm
CECZ chennai zone
CECZ chennai zone
ADDN ALTN TO BLDG. No. P 79 FOR SETTING UP OF ROH FACILITY FOR ROTAX SERIES ENGINE AT 8 BRD
2026_MES_777250_1
82961/E8
Open Tender
Civil Works
Item Rate
365 days
Avadi
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹2,000
GE AVADI
₹3.7 L
Yes
5 Aug 2026
8 Jul 2026
12 Aug 2026
8 Jul 2026
5 Aug 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.5 | B/R PORTION | - | - | - | - |
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 875 | Square Metre | - | - |
| 2 | Roughening surfaces of old concrete floor by picking ,sweeping clean and washing down with water to remove dust complete all as specified and directed. | 422 | Square Metre | - | - |
| 3 | Dismantling of Stone slab and tiles laid bedded and pointed in any mortar of any description or thickness in floors, apron etc complete all as specified and directed. | 2.5 | 10 Square Metre | - | - |
| 4 | Demolition of un-reinforced cement concrete as in of any description and any in position not otherwise specifically provided complete all as directed | 5 | Cubic Metre | - | - |
| 5 | Demolition Cement concrete (unreinforced concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 90 | Cubic Metre | - | - |
| 6 | Demolition Reinforced Cement concrete of any description and in any position not otherwise specifically provided for complete all as directed | 7 | Cubic Metre | - | - |
| 7 | Taking down plastering on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as directed | 1,600 | Square Metre | - | - |
| 8 | Taking down chowkhats or frames with shutters and (without taking off shutters from frames) n.exc 1.5 sq. m each complete all as specified and directed. | 92 | EACH | - | - |
| 9 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) exc 1.5 sq. m but n exc 4 sq. m each complete all as specified and directed. | 26 | EACH | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
82961TENDER.pdf
Tender Documents • 1.67 MB
BOQ_870483.xls
BOQ • 0.93 MB
amendment2.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].