General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Re strengthening of water reservoir of Sukho bandh under Bankola Colliery
2026_ECL_362774_1
ECL/GM/BA/E TENDER/26-27/Civil/017 Dt 30.07.2026
Open Tender
Civil Works - Others
Percentage
25 days
Bankola Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,900
30 Jul 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
30 Jul 2026 - 3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with non modular fly ash bricks conforming to 15:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in Cement mortar 1:6 (1 cement: 6 Coarse sand) | 2.88 | Cum | 6,368 | ₹18,339.84 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 11.67 | Cum | 1,264.65 | ₹14,758.47 |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 4.68 | Cum | 8,030.65 | ₹37,583.44 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 46.8 | Kg | 95.75 | ₹4,481.1 |
| 5 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | 62.43 | Sqm | 858.5 | ₹53,596.16 |
| 6 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. | 124.28 | Sqm | 311.45 | ₹38,707.01 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement: 6 coarse sand) | 1.92 | Cum | 5,737.7 | ₹11,016.38 |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 All kinds of soil. | 1.92 | Cum | 188.75 | ₹362.4 |
| 9 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 1,512 | Sqm | 10.8 | ₹16,329.6 |
| 10 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 0.77 MB
BOQ_375695.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].