Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 Cr+₹29.0 L (11.5%)Admitted-Finance | ₹2.8 Cr+₹29.0 L (11.5%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 12 13 580 STREET NO 14 NAGARJUNA NAGAR TARNAKA TARNAKA SECUNDERABAD HYDERABAD TELANGANA 500017 | HYDERABAD | TELANGANA | 500017 | - | - | Rejected-Technical Due to non submission of valid registration certificate, affidavit towards validity of POA and financial turnover certificate for FY 2020-21 |
| Sl No | Description | Qty | Unit | Ms P B KUNDU L2 | M/s Suresh Chand Gupta L1 |
|---|---|---|---|---|---|
| 1.00 | Systematic Maintanence of Railway Track in Railway Siding for all the items as included in Technical Specification Para 3.0 to 3.9. | 73.2 | Per ETKM Per Month | 37,500 ₹27,45,000 | 35,500 ₹25,98,600 Lowest |
| 2.00 | Supply of 60 Kg pre‐stressed mono‐block concrete sleepers in accordance with the relevant technical specification in manufacturing for plane PSC sleepers of Indian Railways (pre‐tensioned type category‐I) including MCI insert for 52/60 Kg rail section, Broad gauge, as per RDSO drawing No. T‐2496 and IRS specification T‐39‐1993 (with latest alterations, if any) as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all material, labour, loading, transportation; unloading, stacking and taxes, octroi, levies and inspection charges etc., complete (should be fit for track circuit). (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 1,000 | Each | 3,900 ₹39,00,000 | 3,750 ₹37,50,000 Lowest |
| 3.00 | Supply of Elastic Rail clips for BG 52 kg / 60 Kg rail section for use with 60 kg PSC sleepers to RDSO Drg. No. T‐3701 (with latest alterations, if any) confirming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 4,000 | Each | 100 ₹4,00,000 | 90 ₹3,60,000 Lowest |
| 4.00 | Supply of Metal Liners to suit 52 kg / 60 kg rails on 60 kg BG PSC sleepers as per RDSO Drg. No. T‐3741/ T-3742/ T-3740 (with latest alterations, if any), conforming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 4,000 | Each | 60 ₹2,40,000 | 52 ₹2,08,000 Lowest |
| 5.00 | Supply of Grooved Rubber sole plate for 52 Kg/60 Kg Rail section with 60 Kg BG PSC sleepers as per RDSO Drg. No. T-3703 / T-3709 (with latest alterations, if any), conforming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 2,000 | Each | 42 ₹84,000 | 34 ₹68,000 Lowest |
| 6.00 | Supply of Permanant way materials ( Ist class) for 60 kg Rail section of standard size at site as per latest I.R. specification & drawing as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. (The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete) including complete fittings like GRP (T-4965), ERC plate screws, fish plate, bolts and nuts, spherical washer, GFN liner, CI block incuding steel fittings like bearing plates, slide chair, stretcher bar insulating tie plates, tie bar & MS plate complete as per drawings.
(a) Supply of 60 kg turnout in 1 in 8½ BG 6400mm over riding curved switch & complete turn out on PSC sleepers with all fitting & fastening listed in/ 4867 and latest I.R. specification, as per directions of Engineer-in-Charge. (i) Supply of straight / curve switches consisting of 2 Nos. stock rails & 2 Nos. tongue rails & complete required fittings as per RDSO drawing No. T-4865,T-4866/4966, T-4867/4967 including hand point lever box etc. complete. {including all fittings like Guage tie plate-(T-5360/1-2), M.S.Tie Bar(T-4711),Bearing Plate(T-4971, T-4972, T-4973, T-4974, T-4975, T-4976), M.S.Plate(T-3901), Leading Str. Bar (T-4981-82), 1st following Str. Bar (T-4983-84), 2nd following Str. Bar (T-4985-86), Slide Chair (T-4968), MS Bracket (T-2625), Bolt with Nut (F/H) (T-11504), Bolt with Nut (H/F) (T-11504), Bolt of Str. Bar (H/H) (T-11636), Bolt of Str. Bar (F/H) (T-11635), Single Coil spring washer (T-10773)} (ii) check Rails ( 2Nos )
(iii) 1 No. CMS crossing for 1 in 8½ - 60 kg Rail section for turnout {including all fittings like Bolts & Nuts (T-11514, T-11525, T-11526, T-11527, T-11528, T-11529, T-11530, T-1153, T-11532, T-11533, T-11534, T-11535, T-11536), MS Tapered washer (T-5847), Packing pieces (T-026M), Single Coil Spring Washer (T-10773), CI Distance block (T-4987, T-4988), Check Rail block (T-2592), 1 MTR. LONG FISH PLATE 60Kg (T-5915/T-5916) ERCJ Clip (T-4158)}
(iv) Complete lead rails set for turnout. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 7 | Each Set | 15,25,000 ₹1,06,75,000 | 13,90,000 ₹97,30,000 Lowest |
| 7.00 | Supply of Full set 60 Kg BG PSC sleeper set (1 to 67 nos.) for 1 in 8½ Turn‐out of 60 kg Rail (Fan shaped Layout with curved switches) including approach, exit and long concrete sleepers as per RDSO Layout Drg. No. T‐4865 / T-4965 (with latest alterations, if any), conforming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 7 | Each Set | 5,25,000 ₹36,75,000 | 4,50,000 ₹31,50,000 Lowest |
| 8.00 | Supply of junction fish plates 52/100lbs (T-696) one set consist of 4 Nos fish plates and 8 Nos of bolts & nuts washers including labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete as per directions of Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 42 | Each Set | 16,300 ₹6,84,600 | 14,000 ₹5,88,000 Lowest |
| 9.00 | Supply of CI Distance blocks of required size as per site conditions & RDSO drawing including labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete as per directions of Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 145 | Each | 1,200 ₹1,74,000 | 950 ₹1,37,750 Lowest |
| 10.00 | Supply of bolts & nuts for CI distance blocks of required size as per site condition & RDSO drawing including labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete as per directions of Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order). | 145 | Each | 185 ₹26,825 | 170 ₹24,650 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
20 Jun 2022, 3:30 pmClosed
AGM (Civil)
AGM (Civil), FCI, RO Raipur
Annual Running Maintenance Contract of Railway Siding including Replacement of old CST 9 in-line Sleepers with new PSC sleepers, Replacement of old 1 in 8.5 Turnout with new PSC 1 in 8.5 Turnout along with rails at FSD Mandirhasaud (C.G.) (2nd Call)
2022_FCI_691569_1
CE/01/2022-23
Open Tender
Civil Works
Works
365 days
Mandirhasaud
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹5.2 L
6 Jul 2022
28 May 2022
21 Jun 2022
28 May 2022
20 Jun 2022
28 May 2022
28 May 2022 - 20 Jun 2022
Amount
Systematic Maintanence of Railway Track in Railway Siding for all the items as included in Technical Specification Para 3.0 to 3.9.
Supply of 60 Kg pre‐stressed mono‐block concrete sleepers in accordance with the relevant technical specification in manufacturing for plane PSC sleepers of Indian Railways (pre‐tensioned type category‐I) including MCI insert for 52/60 Kg rail section, Broad gauge, as per RDSO drawing No. T‐2496 and IRS specification T‐39‐1993 (with latest alterations, if any) as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all material, labour, loading, transportation; unloading, stacking and taxes, octroi, levies and inspection charges etc., complete (should be fit for track circuit). (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of Elastic Rail clips for BG 52 kg / 60 Kg rail section for use with 60 kg PSC sleepers to RDSO Drg. No. T‐3701 (with latest alterations, if any) confirming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of Metal Liners to suit 52 kg / 60 kg rails on 60 kg BG PSC sleepers as per RDSO Drg. No. T‐3741/ T-3742/ T-3740 (with latest alterations, if any), conforming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of Grooved Rubber sole plate for 52 Kg/60 Kg Rail section with 60 Kg BG PSC sleepers as per RDSO Drg. No. T-3703 / T-3709 (with latest alterations, if any), conforming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of Permanant way materials ( Ist class) for 60 kg Rail section of standard size at site as per latest I.R. specification & drawing as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. (The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete) including complete fittings like GRP (T-4965), ERC plate screws, fish plate, bolts and nuts, spherical washer, GFN liner, CI block incuding steel fittings like bearing plates, slide chair, stretcher bar insulating tie plates, tie bar & MS plate complete as per drawings. (a) Supply of 60 kg turnout in 1 in 8½ BG 6400mm over riding curved switch & complete turn out on PSC sleepers with all fitting & fastening listed in/ 4867 and latest I.R. specification, as per directions of Engineer-in-Charge. (i) Supply of straight / curve switches consisting of 2 Nos. stock rails & 2 Nos. tongue rails & complete required fittings as per RDSO drawing No. T-4865,T-4866/4966, T-4867/4967 including hand point lever box etc. complete. {including all fittings like Guage tie plate-(T-5360/1-2), M.S.Tie Bar(T-4711),Bearing Plate(T-4971, T-4972, T-4973, T-4974, T-4975, T-4976), M.S.Plate(T-3901), Leading Str. Bar (T-4981-82), 1st following Str. Bar (T-4983-84), 2nd following Str. Bar (T-4985-86), Slide Chair (T-4968), MS Bracket (T-2625), Bolt with Nut (F/H) (T-11504), Bolt with Nut (H/F) (T-11504), Bolt of Str. Bar (H/H) (T-11636), Bolt of Str. Bar (F/H) (T-11635), Single Coil spring washer (T-10773)} (ii) check Rails ( 2Nos ) (iii) 1 No. CMS crossing for 1 in 8½ - 60 kg Rail section for turnout {including all fittings like Bolts & Nuts (T-11514, T-11525, T-11526, T-11527, T-11528, T-11529, T-11530, T-1153, T-11532, T-11533, T-11534, T-11535, T-11536), MS Tapered washer (T-5847), Packing pieces (T-026M), Single Coil Spring Washer (T-10773), CI Distance block (T-4987, T-4988), Check Rail block (T-2592), 1 MTR. LONG FISH PLATE 60Kg (T-5915/T-5916) ERCJ Clip (T-4158)} (iv) Complete lead rails set for turnout. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of Full set 60 Kg BG PSC sleeper set (1 to 67 nos.) for 1 in 8½ Turn‐out of 60 kg Rail (Fan shaped Layout with curved switches) including approach, exit and long concrete sleepers as per RDSO Layout Drg. No. T‐4865 / T-4965 (with latest alterations, if any), conforming to IRS specifications as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of junction fish plates 52/100lbs (T-696) one set consist of 4 Nos fish plates and 8 Nos of bolts & nuts washers including labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete as per directions of Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of CI Distance blocks of required size as per site conditions & RDSO drawing including labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete as per directions of Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of bolts & nuts for CI distance blocks of required size as per site condition & RDSO drawing including labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete as per directions of Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supplying and stacking of approved quality of stone ballast of 50 mm gauge clean, angular, hard and durable track ballast as per RDSO specification and stacking the same on cess of the formation or toe of the bank or at suitable place as as per directions of Engineer-in-Charge. The rate includes all cost of lead, lift, royalty, Sales Tax and other taxes and duties and all incidental charges, testing in lab complete as applicable. Tools and plants and screens of approved mesh and dimensions required for inspection and passing at the time of measurements/supply are to be arranged by the contractor. The rate also includes leveling of ground, if necessary, where the ballast are to be stacked and as directed by Engineer-in-Charge. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of 60 kg, 90 UTS IU Rails of 13m long,straight rails without bend and defect free with USFD testing approved by railways as per IRS specification T-12-2009 (with latest alterations, if any) as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of 52 KG,90 UTS IU Rails of 13m long,straight rails without bend and defect free with USFD testing approved by railways as per IRS specification T-12-2009 (with latest alterations, if any) as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking and taxes, octroi, levies and inspection charges etc. complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Dismantling of existing BG turnouts and trap switches with all types of rails on other than PSC sleeper layout, removing fish plates & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat & countable manner, as directed by Engineer in-charge : Under Conditions not requiring Traffic Block - 1 in 8½ Turnout.
Assembling complete BG Turnout including symmetrical split on staging or on formation / ballast bed to correct gauge and alignment as per standard drawing on all types of rails over PSC sleepers at specified locations, duly leading special size sleepers, switches, crossings, fittings, fastenings etc. with maximum lead of 250m & all lift and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete and as directed by engineer in-charge. Note: (Rail cutting and Drilling shall be paid separately). - 1 in 8½ Turnout.
Fabricating (cutting,drilling and machining) and fixing of check rails of all sections as per drawing and directions of engineer in-charge with all contractor’s labour, tools and materials complete. Rails shall be supplied by FCI. For rails of 72 UTS.
First and second through packing of points and crossing including gauging, fittings recoupment, elimination of sag and to the required alignment as per provisions of Indian Railways Permanent Way Manual - 1 in 8½ PSC layout.
Third or subsequent through packing of points and crossing including gauging, fittings recoupment, elimination of sag and to the required alignment as per provisions of Indian Railways Permanent Way Manual - 1 in 8½ PSC layout.
Providing,and fixing up to plinth level plinth level precast reinforced cement concrete work in string courses, bands, copings,bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.:Thermo-Mechanically Treated bars of grade Fe-500D or more.
Ms P B KUNDU
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_727725.xls
BOQ • 0.25 MB
NITMNDH2.pdf
Tender Documents • 1.81 MB
tendernotice2.pdf
Additional Documents • 3.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .