RequiredExperience with Government
RequiredAnnual Turnover
RequiredCertificate (Requested in ATC)
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled Yes Note: 1. OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years
Requiredending on 31st March of the previous financial year
Requiredshould be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant/Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution/incorporation of the OEM is less than 3 year old
Requiredthe average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. Hopper Tipper Dumper ( 25 pieces ) Technical Specifications 1/7 * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) Certification Chassis Certification ARAI * Chassis Certification ARAI/VRDE/ICAT No - * At the time of supply of the equipment
Requiredthe chassis should not be more than 6 months old Yes * Generic Parameters Type of TIPPER Box body Tipper Box body Tipper
RequiredGarbage Tipper Type of TIPPER if other tipper
Requiredplease declare type of Tipper
Required- * Make of Chassis - * Type of Chassis Frame - * Category of Vehicle for which Chassis to be used Light Capacity Commercial Vehicles Light Capacity Commercial Vehicles Type of Chasssis Chassis with Facecowl * Type of Fuel Diesel Diesel Vehicle Emission Complaince BS-IV BS-IV Fuel Consumption ( declared by OEM as certified by Test Agency under Rule 115of CMVR 1989) (Kmpl) 18 * Speed
RequiredMax (Km/Hr) 80 * Max Engine Power BHP (BHP@rpm) 40 Any applicable numeric value Rated RPM at Max Engine Power 3750 * Max Engine Torque (N-M@rpm) 100 More than 100.0 Or higher Rated RPM at Max Engine Torque 2000 * Main Engine Aspiration Turbocharged Intercooled Natural Aspiration
RequiredTurbocharged
RequiredSupercharged
RequiredTurbocharged+ Supercharged
RequiredTurbocharged Intercooled 2/7 No. of Cylinder in Main Engine (Nos) 2 * Fuel Tank Capacity (Ltrs) 30 * Gradeability of Vehicle with load( %) 18 * Ground Clearance (mm) 175 * Wheel Base (mm) 2100 * Kerb Weight (Kg) 1000 * Gross Vehicle Weight (Kg) 2100 More than 1924.0 Or higher Type of BIS MARKED Vehicle Tyre Radial * Chassis Transmission System Manual Manual Number of Speed Forward Gears 5 * Type of Steering Manual Manual Turning Radius
RequiredMin (mm) 4750 Less than 4750.0 Or lower Speed Governers/ECU Yes * ABS Fitted No * Front Vehicle Brake - * Rear Vehicle Brake - * Type of Clutch - * Tipping Angle (Degree) 80 * Tipper Container cap acity/Volume(cubic metres) 2 0.5 - 20 Consructional Parameters Size Of Front Tyres (mm) - * Size Of Rear Tyres (mm) - * Size of Wheel (mm) 358 * Tipper body Pivot length (mm) 1546 * Tipper body Length (mm) 2165 * Tipper Body Height (mm) 670 * Overall Height of Tipper from Ground (mm) 1489 * 3/7 Body Plate Thickness (mm) 2 * Main Frame Thickness (mm) 4 * Hydraulic System Yes * Tipping Hydraulic Cylinders(Make) - * Hydraulic System Driven by Main Engine * Tipper Container Material Mild Steel Mild Steel Thickness of sheet from tipper Collector Container Made (mm) 2 * Dumping Height (mm) 1350 * Engine Oil Pressure Level Indicator in Control Panel Yes * Fuel Gauge Indicator in Control Panel Yes * Engine Cooling Liquid Temperature Indicator in Control Panel Yes * Operating Hour Meter No * Locking/Unlocking of Tipper Discharge Container Yes * Lowering/Lifting of Tipper Discharge Container Yes * Counter Weight No * If yes Counter Weight (kg) 0 * Paint Automotive Paint * Performance Parameters Standard Sparewheel and Tool Kit Yes * Warranty Time (Month) 12 24.0
Required12.0 No. Of Free Service (Nos) 3 * Battery Warranty (Months) 12 12
Required24
Required36 Or higher Warranty Distance (Km)(Unlimited during warranty Period) Yes * * Specifications highlighted in bold are the Golden Parameters. 4/7 * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Additional Specification Documents