Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 126 B I MESS ROAD RAI MARKET AMBALA CANTT AMBALA CANTT HARYANA 133001 | AMBALA | HARYANA | 133001 | Admitted-Finance |
| 2 | Admitted-Finance MUZAFFARNAGAR MEERUT ROAD GEHRA BAGH OPP PWD WARE HOUSE MUZAFFARNAGAR UTTAR PRADESH 251002 | MUZAFFARNAGAR | UTTAR PRADESH | 251002 | Admitted-Finance |
| 3 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
12 May 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Work of Strengthening work of 132 KV main busbar at 132 KV Substation Sadabad under ETD, Hathras
2021_UPTCL_582596_1
ET-10/ETC(M)/21-22
Open Tender
Electrical Works
Lump-sum
60 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD Mathura
₹2,000
19 Jun 2021
15 Apr 2021
13 May 2021
15 Apr 2021
12 May 2021
15 Apr 2021
120 days
Amount
Dismantling of Jumpers of 132 KV bays and section isolators between BI to Main Bus.
Dismantling of jumpers of 132 KV P.T.
Dismantling of 132 KV old bus bar of various spans after opening of 70/120 KN disc Insulator, suspension, tension fitting, PG clamps etc and shifting of old conductor to store.
Stringing of 132 KV new single Moose busbar from 132 KV PT to 132 KV section isolator through tension fitting in one piece, by cutting fresh ACSR Moose conductor of suitable length, work include fixing of 70/120 KN disc insulator, tension fittings, phase plate, suspension fittings, PG clamps and cutting, bending of ACSR conductor of suitable length, shifting of material from store to site, connection at 132 KV section isolator, PT and other associated work to complete the job satisfactory. 70/120 KN disc insulator, tension fittings, phase plate, suspension fittings, PG clamps, connectors and conductor shall be provided by the department free of cost.
Making jumpers of 132 KV bays with double Panther conductor between 132 KV main busbar to 132 KV BI . Work include cutting, bending of ACSR conductor of suitable length.
SUPPLY:
Supply of bolted type 120KN LM-6 aluminum alloy single tension fitting suitable for single Moose conductor with turn buckle for 132KV busbar.
Supply of 132 KV PT terminal connector suitable for single Moose conductor complete with hot dipped galvanized nut, bolt & washer made of LM-6 aluminum alloy.
Supply of four bolted type P.G. Clamp suitable for Moose to Panther conductor with hot dipped galv. Nut, bolt & washer made of LM-6 alloy.
P&H Engineering
KARAN SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .