Loading…
Loading…
Tender Value
₹76.0 L
EMD Value
₹5.8 L
Closing Date
1 Oct 2026, 12:00 pm4d left
Superintending Engineer
Office of the Superintending Engineer, BSR Circle, PWD, Bulandhshahr
Construction of a minor bridge over the seasonal drain located at the kilometer 2 of the Utrawali Doobli connecting road in Gautam Buddha Nagar district
2026_CEMRT_1189872_1
8757/96M(IV)-BSR CIRCLE/2026-27 DATE 01.09.2026
Open Tender
Civil Works - Bridges
Fixed-rate
365 days
Gautambudhnagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.8 L
Bulandshahr
25 Sept 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work material .MoRD9.01/15.01(B)Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 542 | cum | 40 | ₹21,680 |
| 2 | Providing concrete for plain/reinforced concrete PCC M10 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 67 | cum | 7,400 | ₹4,95,800 |
| 3 | Providing concrete for plain/reinforced concrete RCC M-20 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 69 | cum | 8,000 | ₹5,52,000 |
| 4 | Providing concrete for plain/reinforced concrete RCC M-25 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 44 | cum | 8,300 | ₹3,65,200 |
| 5 | Supplying, fitting and placing HYSD bar Fe -500 reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 11 | MT | 75,500 | ₹8,30,500 |
| 6 | Plain/reinforced cement concrete RCC M20 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 106 | cum | 8,400 | ₹8,90,400 |
| 7 | Plain/reinforced cement concrete RCC M25 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 39 | cum | 8,800 | ₹3,43,200 |
| 8 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 16 | MT | 76,000 | ₹12,16,000 |
| 9 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 151 | cum | 2,600 | ₹3,92,600 |
| 10 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 60 | cum | 4,000 | ₹2,40,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_2242182.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .